JAG WELDING, FAB, & SERVICES, INC
UEI: GWCGJAHB6AG1
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$20.8M
Received · FY2025–FY2027
$20.8M
Received · all years
14
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| VIGOR MARINE LLC | $20.8M |
Most recent
- $218K"167-11-001 STRUCTURAL DOOR; REPLACE (OPTION ITEM) PARAGRAPHS: ALL (EXCEPT 3.1.6 - POWDER COAT)"
- $58K"167-11-001 STRUCTURAL DOOR; REPLACE (OPTION ITEM) PARAGRAPHS: ALL (EXCEPT 3.1.6 - POWDER COAT)"
- $2.6MWORK ITEM: 259-10-002, RCC 226G, PARAGRAPH 5.2 - ENGINE ROOM NUMBER 2 GAS TURBINE UPTAKE; REPAIR (OPTION ITEM – ACCOMPLISH THE REQUIREMENTS OF PARAGRAPH 5.2 AS INDICATED IN JAG QUOTE.
- $113KWORK ITEM: 167-11-004, RCC 245G - FLIGHT DECK HATCH; REPLACE (OPTION ITEM), PARAGRAPH 3.8 - ASSEMBLE MATERIAL IDENTIFIED IN 1.3.1 AND 1.3.2 IAW 2.6. (SEE NOTE 4.3)
- $5.7MWORK ITEM: 259-10-002, RCC 226G, PARAGRAPHS 3.6.2 AND 3.6.3 - ENGINE ROOM NUMBER 2 GAS TURBINE UPTAKE; REPAIR (OPTION ITEM) – ACCOMPLISH THE REQUIREMENTS OF PARAGRAPHS LISTED ABOVE, (SEE NOTE 4.5)
- $1.5MCOLLECTIVE PROTECTION SYSTEM (CPS) ZONE 2 FAN ROOM; REPAIR AND PRESERVE (OPTION ITEM) - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO COMPLETE COLLECTIVE PROTECTION SYSTEM (CPS) ZONE 2 FAN ROOM; REPAIR AND PRESERVE (OPTION ITEM), PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, ALL OTHER TERMS AND CONDITIONS LISTED ABOVE AND BELOW ON THIS PO APPLY TO THIS ITEM.
- $33KWORK ITEM: 150-11-020, RCC 153G, PARAGRAPHS 3.2 AND 3.2.1 - ACCOMPLISH REPAIR TO EACH COAMING AND FLAT BAR LOCATED IN 1.2.2 USING 2.2, 2.3, 2.4 AND THE REPORT GENERATED IN 3.1.1 FOR GUIDANCE, AS DESIGNATED BY THE SUPERVISOR. REMOVE EXISTING AND INSTALL NEW A TOTAL OF 62 SQUARE FEET OF DEFECTIVE PLATE IDENTIFIED IN 1.3
- $2.0M"167-11-001 STRUCTURAL DOOR; REPLACE (OPTION ITEM) PARAGRAPHS: ALL (EXCEPT 3.1.6 - POWDER COAT)"
- $4.4M"167-11-001 STRUCTURAL DOOR; REPLACE (OPTION ITEM) PARAGRAPHS: ALL (EXCEPT 3.1.6 - POWDER COAT)"
- $1.4MCOLLECTIVE PROTECTION SYSTEM (CPS) ZONE NUMBER 3 FAN ROOM; REPAIR AND PRESERVE (OPTION ITEM) - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO COMPLETE COLLECTIVE PROTECTION SYSTEM (CPS) ZONE NUMBER 3 FAN ROOM; REPAIR AND PRESERVE (OPTION ITEM), PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, ALL OTHER TERMS AND CONDITIONS LISTED ABOVE AND BELOW ON THIS PO APPLY TO THIS ITEM.