JH KELLY, LLC
UEI: QCKDAN7JMLH7
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$270K
Received · FY2025–FY2027
$270K
Received · all years
2
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| P & L GENERAL CONTRACTORS, INC. | $223K |
| RJK CONSTRUCTION LLC | $47K |
Most recent
- $47KFURNISH MATERIAL, LABOR, SUPPLIES, AND EQUIPMENT AS NECESSARY TO REWORK ELECTRICAL LIGHTING SYSTEMS FOR NEW DOOR, ADD NEW EXTERIOR LIGHT, POWER AND CONTROLS TO NEW AUTOMATIC COILING DOOR, ACCESS CONTROL WIRING FOR DOOR, CARD READER WIRING IN PARKING DECK ON 2ND FLOOR FOR NEW SOUTH VEHICLE GATE. ADD (8) WEATHERPROOF RECEPTACLES VIA (4) NEW CIRCUITS FOR LIGHTS, FEED CIRCUITS FROM ROOFTOP ELECTRICAL PANEL, PROVIDE (3) CEP LED DOUBLE-HEAD, 44,000 LUMENS, CORDED, CRANK UP ROLLING FIXTURES, AND NEW UP LIGHT FED FROM GUARD SHACK, MOUNTED TO GUARD SHACK TO LIGHT THE FLAG FOR THE RELOCATED FLAGPOLE.
- $223KENGINEER, FURNISH, AND INSTALL THE COMPLETE MECHANICAL SCOPE OF WORK. 1. ENGINEERING AND APPLICABLE PERMIT FEES FOR MECHANICAL WORK 2. REVISE HVAC ALONG NORTH WALL TO ACCOMMODATE 6 NEW OFFICES INCLUDING THE FOLLOWING: • RELOCATE 4 EXISTING SUPPLY AIR DIFFUSERS • PROVIDE AND INSTALL 2 NEW SUPPLY AIR DIFFUSERS • FURNISH AND INSTALL 6 NEW RETURN AIR GRILLES WITH SOUND BOOTS • MODIFY EXISTING DUCTWORK FOR NEW AND RELOCATED AIR DIFFUSERS • RELOCATE EXISTING TERMINAL UNIT TEMPERATURE SENSORS TO NEW WALLS 3. FURNISH AND INSTALL DEDICATED HEATING AND COOLING FOR NEW 6TH FLOOR SERVER ROOM INCLUDING THE FOLLOWING: • FURNISH AND INSTALL 2 NEW CHILLED WATER FAN COIL UNITS IN CEILING SPACE OF SERVER ROOM • PROVIDE AND INSTALL DUCTWORK AND AIR DIFFUSERS FOR NEW FAN COIL UNITS • PROVIDE AND INSTALL RETURN AIR GRILLES IN SERVER ROOM • PROVIDE AND INSTALL CHILLED WATER PIPING FROM EXISTING BUILDING MAINS ON 6TH FLOOR OUT TO NEW FAN COIL UNITS • PROVIDE AND INSTALL CONDENSATE PUMPS AND DRAIN PIPING FOR FAN COIL UNITS • PROVIDE AND INSTALL DRAIN PANS WITH LEAK DETECTION UNDER FAN COIL UNITS • MODIFY AIR DIFFUSERS AND DUCTWORK FOR NEW IT LAB • BUILDING STANDARD CONTROLS AND CONTROL WIRING FOR NEW FAN COIL UNITS 4. START-UP, TESTING, AND AIR BALANCE OF NEW EQUIPMENT AND AIR DIFFUSERS 5. AS-BUILT PLANS, WARRANTY, AND O&MS