KAW VALLEY ENGINEERING INC
UEI: GDYMQAAE3EG5
$7K
Obligations · USAspending
Actions Aug '17 – Mar '21
2
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Defense$7K · 2 awards
Top NAICS
By obligations · USAspending, all years
- 541380 Testing Laboratories and Services$7K
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| W912DQ21P1051 | Department of the Army | 03/31/2021 | $4K |
| W912DQ17C1087 | Department of the Army | 08/22/2017 | $3K |
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$164K
Received · FY2025–FY2027
$164K
Received · all years
5
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| FIRELAKE CONSTRUCTION INC | $131K |
| GENERAL DYNAMICS MISSION SYSTEMS, INC. | $32K |
Most recent
- $5KSPECIAL INSPECTION SERVICES FOR NBAF ELEVATED PLATFORMS, INCLUDING EXTERIOR SPOT LOCATIONS IF NEEDED, EDS TANK ROOM ANCHOR INSPECTIONS, INCINERATOR ANCHOR INSPECTIONS, DOCUMENTATION, AND CLOSEOUT SUPPORT.
- $2K"PROVIDE SURVEYING SERVICES FOR THE MEDICINE CREEK DAM SPILLWAY REPAIRS. . PROVIDE A FULLY COMPREHENSIVE WORK PLAN, THAT INCLUDES PHASES OF WORK, DURATION PER PHASE, MEANS & METHODS TO ENSURE TIMELY COMPLETION OF SCOPE, AND INCLUDE SAFETY MEASURES TO BE USED. PROVIDE AN ACTIVITY HAZARD ANALYSIS FOR YOUR SCOPE. PROVIDE A BASELINE SCHEDULE (TENTATIVELY BETWEEN AUGUST 2025 THROUGH DECEMBER 2025). PROVIDE THE FOLLOWING SUBMITTALS: (THIS LIST IS REPRESENTATIVE AND MAY NOT CAPTURE ALL THAT ARE NEEDED.) USE OF SITE PLAN AS APPLICABLE TO SCOPE PER SPEC SECTION 01_14_10-1 TRAINING CERTS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_35_20-6 PROJECT RECORD DOCUMENTATION (RED LINES/ TOPO’S) AS APPLICABLE TO SCOPE PER SPEC SECTION 01_78_30-1"
- $32KGOODS AND OR SERVICES
- $30K"PROVIDE SURVEYING SERVICES FOR THE MEDICINE CREEK DAM SPILLWAY REPAIRS. . PROVIDE A FULLY COMPREHENSIVE WORK PLAN, THAT INCLUDES PHASES OF WORK, DURATION PER PHASE, MEANS & METHODS TO ENSURE TIMELY COMPLETION OF SCOPE, AND INCLUDE SAFETY MEASURES TO BE USED. PROVIDE AN ACTIVITY HAZARD ANALYSIS FOR YOUR SCOPE. PROVIDE A BASELINE SCHEDULE (TENTATIVELY BETWEEN AUGUST 2025 THROUGH DECEMBER 2025). PROVIDE THE FOLLOWING SUBMITTALS: (THIS LIST IS REPRESENTATIVE AND MAY NOT CAPTURE ALL THAT ARE NEEDED.) USE OF SITE PLAN AS APPLICABLE TO SCOPE PER SPEC SECTION 01_14_10-1 TRAINING CERTS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_35_20-6 PROJECT RECORD DOCUMENTATION (RED LINES/ TOPO’S) AS APPLICABLE TO SCOPE PER SPEC SECTION 01_78_30-1"
- $94K"PROVIDE TESTING SERVICES FOR THE MEDICINE CREEK DAM SPILLWAY REPAIRS. . PROVIDE A FULLY COMPREHENSIVE WORK PLAN, THAT INCLUDES PHASES OF WORK, DURATION PER PHASE, MEANS & METHODS TO ENSURE TIMELY COMPLETION OF SCOPE, AND INCLUDE SAFETY MEASURES TO BE USED. PROVIDE AN ACTIVITY HAZARD ANALYSIS FOR YOUR SCOPE. WORK AS NEEDED (TENTATIVELY BETWEEN AUGUST 2025 THROUGH MARCH 2026). OBTAINING SAMPLES OF FILL MATERIAL TO PERFORM MOISTURE-DENSITY RELATIONSHIP (PROCTOR) TESTS AND ATTERBERG LIMITS. PROVIDING A REPRESENTATIVE TO PERFORM IN-PLACE MOISTURE AND DENSITY TESTS FOR FILL AND BACKFILL PLACED. PROVIDING A REPRESENTATIVE TO OBSERVE FOUNDATION EXCAVATION; AND REINFORCING STEEL, ANCHOR BOLT, AND CONCRETE PLACEMENT. PROVIDING A REPRESENTATIVE TO TEST STRUCTURAL, SITE, AND SLAB-ON-GRADE CONCRETE. FIELD TESTING SHALL INCLUDE SLUMP, AIR CONTENT, AND CASTING STRENGTH TEST SPECIMENS. LABORATORY TESTING SHALL INCLUDE STRENGTH TESTING OF FIELD CAST SPECIMENS. PROVIDING A REPRESENTATIVE TO PERFORM PULL TESTING OF POST INSTALLED REBAR AND ANCHORS. PROVIDING A REPRESENTATIVE TO PERFORM FIELD AND LABORATORY MATERIALS TESTING OF CONCRETE MIX DESIGN VERIFICATIONS. PROVIDING DAILY OBSERVATION REPORTS DOCUMENTING THE FIELD ACTIVITIES AND LABORATORY TEST RESULTS. PROVIDING A PROJECT MANAGER OR STAFF ENGINEER FOR CONSULTING AND REPORT REVIEW/WRITING OR OTHER CORRESPONDENCE. ATTENDING MEETINGS ON AN AS-NEEDED BASIS DURING PROGRESS OF CONSTRUCTION. PROVIDE THE FOLLOWING SUBMITTALS: (THIS LIST IS REPRESENTATIVE AND MAY NOT CAPTURE ALL THAT ARE NEEDED.) USE OF SITE PLAN AS APPLICABLE TO SCOPE PER SPEC SECTION 01_14_10-1 TRAINING CERTS AS APPLICABLE TO SCOPE PER SPEC SECTION 01_35_20-6 PROJECT RECORD DOCUMENTATION (RED LINES/ TOPO’S/ TEST RESULTS ) AS APPLICABLE TO SCOPE PER SPEC SECTION 01_78_30-1"