KRI AT NORTHEASTERN UNIVERSITY, LLC
UEI: KK6NAHA8V1M4
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$1.2M
Received · FY2025–FY2027
$1.2M
Received · all years
2
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| BATTELLE MEMORIAL INSTITUTE | $988K |
| VANDERBILT UNIVERSITY | $213K |
Most recent
- $213K2.1 BASE €“ SIM AND PROTOTYPE EFFORT EXECUTION OVER 12 MONTHS WILL HAVE AN EFFORT IN SENSOR DESIGN TO SUPPORT COOP OVERALL GOALS. SENSOR WILL OPERATE FROM 3-35MHZ IN INITIAL EFFORT. 2.2 OPT1 - VERIFICATION AND TESTING SUPPORT EXECUTION OVER 18 MONTHS TO SUPPORT MODIFICATIONS TO INITIAL INTERPOSER 2.3 OPT2 SENSOR DESIGN EXECUTION OVER 6 MONTHS TO DO A DETAILED DESIGN OF SENSOR 2.4 OPT3 IC FABRICATION EXECUTION OVER 6 MONTHS TO BUILD AND FABRICATE THE OPT2 SENSOR DESIGN AND SENSING BACKEND BASED ON COTS COMPONENTS
- $988KRESEARCH AND DEVELOPMENT
Subcontracts awarded
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$3.6M
Subbed out · FY2025–FY2027
$3.6M
Subbed out · all years
2
Subcontractors
—
To small businesses
Top subcontractors
| Subcontractor | Total |
|---|---|
| NORTHEASTERN UNIVERSITY | $2.6M |
| THE CURATORS OF THE UNIVERSITY OF MISSOURI | $1.0M |
By subcontractor type
As reported on each subaward; a subcontractor can count in several types.
- Educational institution$3.6M · 2 subs
- Nonprofit$3.6M · 2 subs