LATHAM ELECTRICAL CO
UEI: MX64NRZJ9JV5
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$1.5M
Received · FY2025–FY2027
$1.5M
Received · all years
7
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| R & W Construction Company | $1.5M |
Most recent
- $65KELECTRICAL SCOPE OF WORK DEMO EXISTING CONDUIT AND WIRING TO RHU 1 AND RHU 2 INSTALL CONDUIT AND WIRE FOR NEW UNITS PROVIDE 350-AMP BREAKER
- $5KFURNISH AND INSTALL CONDUIT AND WIRING FOR (1) EXHAUST FAN
- $16KDISCONNECT (3) FUEL TANKS AND (3) PUMPS INSTALL (2) NEW DISCONNECTS, RECONNECT POWER WIRING AT (2) DISPENSERS AND (2) FUEL TANKS
- $105KFURNISH POWER WIRING, CONDUIT, AND TRENCHING TO NEW PAD MOUNTED PUMP LOCATION 1 EMPTY CONTROL CONDUITS WITH PULL STRING TO BE INSTALLED FROM CONTROL PANEL TO NEW PAD MOUNTED PUMP
- $296KTIE INTO EXISTING SECONDARY, INSTALL RACK AND NEW GENERATOR WITH ALL ASSOCIATED CONDUIT AND WIRING
- $727KELECTRICAL SCOPE OF WORK DEMO EXISTING GENERATOR, TRANSFORMER, SECONDARY CONDUIT CONDUCTORS AND DUCT BANK NEW PRIMARY DUCT BANK, SECONDARY GENERATOR, TRANSFORMER AND TEMP GENERATOR
- $238KELECTRICAL SCOPE OF WORK DEMO OLD PADS, CONDUIT, AND CONDUCTORS REMOVE AND HAUL AWAY OLD GENERATORS PER SITE INSTALL NEW GENERATORS, CONDUITS, AND CONDUCTORS EXTEND SCADA PIPING INTO NEW PAD PER SITE