LOCKHEED MARTIN CORPORATION
UEI: HDHVQ4EF8A89CAGE: 65113PALO ALTO, CA
$194.1M
Obligations · USAspending
Actions Oct '09
1
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Sep '27
Period of performance through
Top agencies
By obligations · USAspending, all years
- National Aeronautics and Space Administration$194.1M · 1 awards
Top NAICS
By obligations · USAspending, all years
- 541712 $194.1M
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| NNG09FA40C INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | National Aeronautics and Space Administration | 10/01/2009 | $194.1M |
Expiring contracts
Period of performance ending in the next 18 months · USAspending
- NNG09FA40C · National Aeronautics and Space Administration$194.1M · ends 09/30/2027
Contract vehicles
Vehicles this company holds its own contract on, with or without orders · USAspending IDV records, GSA eLibrary SINs
- Joint Enterprise Research, Development, Acquisition and Production/procurement Program…IDIQNo orders on fileDepartment of DefenseOrdering through 11/01/2027176 holdersW911QY18D0099
Orders are task and delivery orders in USAspending under this company's contract on the vehicle. Open a vehicle to see its other holders, or browse all contract vehicles.
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$408K
Received · FY2025–FY2027
$408K
Received · all years
4
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| THE UNIVERSITY OF IOWA | $408K |
Most recent
- $31K09/23/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
- $20K08/25/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
- $36K04/10/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
- $309K02/12/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
- $31K10/21/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
- $29K05/15/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
- $92K04/14/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
- $1.6MSERVICES
Subcontracts awarded
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$4.4M
Subbed out · FY2025–FY2027
$4.4M
Subbed out · all years
23
Subcontractors
—
To small businesses
Top subcontractors
| Subcontractor | Total |
|---|---|
| SETI INSTITUTE | $928K |
| ALLIANCE SPACESYSTEMS, LLC | $564K |
| SAVANTEST, LLC | $461K |
| MOOG MILITARY AIRCRAFT LLC | $440K |
| LUXEL CORPORATION | $254K |
| SMITHSONIAN INSTITUTION | $230K |
| ACRETUS LLC | $226K |
| AEROSPACE FABRICATION & MATERIALS LLC | $164K |
| DYNOVAS INC | $152K |
| TAYCO ENGINEERING, INC. | $130K |
By subcontractor type
As reported on each subaward; a subcontractor can count in several types.
- Manufacturer$3.1M · 18 subs
- Nonprofit$1.8M · 3 subs
- WOSB$333K · 3 subs
- Women-owned$333K · 3 subs
- SDB$292K · 2 subs
- Minority-owned$292K · 2 subs
- EDWOSB$257K · 1 sub
- Educational institution$90K · 1 sub
- SDVOSB$35K · 1 sub
- Veteran-owned$35K · 1 sub