FedOps logoFedOps

LOCKHEED MARTIN CORPORATION

UEI: HDHVQ4EF8A89CAGE: 65113PALO ALTO, CA
Browse awards
$194.1M
Obligations · USAspending
Actions Oct '09
1
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Sep '27
Period of performance through

Top agencies

By obligations · USAspending, all years

Top NAICS

By obligations · USAspending, all years

Recent awards

Latest contract actions by start date · USAspending

AwardAgencyStartAmount
NNG09FA40C
INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED.
National Aeronautics and Space Administration10/01/2009$194.1M

Expiring contracts

Period of performance ending in the next 18 months · USAspending

Contract vehicles

Vehicles this company holds its own contract on, with or without orders · USAspending IDV records, GSA eLibrary SINs

Orders are task and delivery orders in USAspending under this company's contract on the vehicle. Open a vehicle to see its other holders, or browse all contract vehicles.

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$408K
Received · FY2025–FY2027
$408K
Received · all years
4
Subawards
1
Prime

Top primes

Prime contractorTotal
THE UNIVERSITY OF IOWA$408K

Most recent

  • 09/23/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)
    UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
    $31K
  • 08/25/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)
    UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
    $20K
  • 04/10/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)
    UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
    $36K
  • 02/12/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)
    UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
    $309K
  • 10/21/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)
    UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
    $31K
  • 05/15/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)
    UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
    $29K
  • 04/14/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)
    UNDER THE DIRECTION OF THE TRACERS PI, LOCKHEED MARTIN ADVANCED TECHNOLOGY CENTER WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS MISSION.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. 4PERFORM TRADE STUDIES TO FURTHER REFINE THE MISSION CONCEPT, IF NECESSARY.5PREPARE AND SUBMIT INFORMAL MONTHLY PROGRESS AND COST REPORT. 6PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.7PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.8ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A.
    $92K
  • 04/03/2025 KBR WYLE SERVICES, LLC · FA865021C6277 · Department of Defense (DOD)
    SERVICES
    $1.6M

Subcontracts awarded

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$4.4M
Subbed out · FY2025–FY2027
$4.4M
Subbed out · all years
23
Subcontractors
—
To small businesses

Top subcontractors

SubcontractorTotal
SETI INSTITUTE$928K
ALLIANCE SPACESYSTEMS, LLC$564K
SAVANTEST, LLC$461K
MOOG MILITARY AIRCRAFT LLC$440K
LUXEL CORPORATION$254K
SMITHSONIAN INSTITUTION$230K
ACRETUS LLC$226K
AEROSPACE FABRICATION & MATERIALS LLC$164K
DYNOVAS INC$152K
TAYCO ENGINEERING, INC.$130K

By subcontractor type

As reported on each subaward; a subcontractor can count in several types.

  • Manufacturer$3.1M · 18 subs
  • Nonprofit$1.8M · 3 subs
  • WOSB$333K · 3 subs
  • Women-owned$333K · 3 subs
  • SDB$292K · 2 subs
  • Minority-owned$292K · 2 subs
  • EDWOSB$257K · 1 sub
  • Educational institution$90K · 1 sub
  • SDVOSB$35K · 1 sub
  • Veteran-owned$35K · 1 sub