MACDONALD-MILLER FACILITY SOLUTIONS LLC
UEI: MVT7GNVMULE6
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$9.0M
Received · FY2025–FY2027
$9.0M
Received · all years
23
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| VIGOR MARINE LLC | $9.0M |
Most recent
- $98K"992-11-001 TEMPORARY AIR CONDITIONING; PROVIDE PARAGRAPHS: 3.1 - 3.3"
- $217K"471-90-001 SHIPALT DDG51-79521K, AN/SLQ-32 (V)7 SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 UPGRADE; ACCOMPLISH (OPTION ITEM) RCC 474G"
- $2.8M"SHIPALT DDG51-92394K, STRUCTURAL MODIFICATIONS TO MITIGATE CRACKING AT FRAME 106; ACCOMPLISH 130-90-001 PARAGRAPHS: (3.1, 2.4, 2.9) 3.1.1, 3.2"
- $846K"AEGIS SPY INSTALLATION SUPPORT SERVICES; PROVIDE 980-11-004 PARAGRAPHS: 3.4 - 3.5"
- $2.3MFIRE ROOM (7-123-0-E) VENT INTAKE AND EXHAUST PLENUMS REPLACE - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PROVIDE LABOR AND MATERIAL TO PERFORM FIRE ROOM (7-123-0-E) VENT INTAKE AND EXHAUST PLENUMS REPLACE, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, ALL OTHER TERMS AND CONDITIONS LISTED ABOVE AND BELOW ON THIS PO APPLY TO THIS ITEM.
- $56K"993-21-001 AN/SPY-1 ANTENNA ARRAY FACE RESURFACE SUPPORT SERVICE; PROVIDE (OPTION ITEM) PARAGRAPHS 3.3.10 - 3.3.10.8"
- $43K"514-21-001 AIR CONDITIONING (A/C) PLANT NUMBER ONE CONDENSER; MECHANICALLY CLEAN PARAGRAPHS: 3.1-3.2, 3.22-3.3, 3.4-3.5.3.1, 3.5.4, 3.5.5-3.5.6.1, 3.6"
- $322KNR2 REEFER MOTOR & COMPRESSOR - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PERFORM NR2 REEFER MOTOR & COMPRESSOR, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM AND THE ATTACHED USS SAVANNAH FLOW DOWN CLAUSES. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING.
- $100K"130-90-001 SHIPALT DDG51-92394K, STRUCTURAL MOD TO MITIGATE CRACKING AT FRAME 106; ACCOMPLISH (OPTION ITEM) PARAGRAPHS 3.2, 3.3"
- $144KA/C ISO VALVE REPLACEMENT - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PERFORM A/C ISO VALVE REPLACEMENT, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM AND THE ATTACHED USS SAVANNAH FLOW DOWN CLAUSES. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING. PERIOD OF PERFORMANCE IS APRIL 13, 2026 THRU MAY 21, 2027.