MARINE SPECIALTY PAINTING INC.
UEI: K65JKFKWKXM7
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
We specialize in ship repair and PCMS tile, Nonskid, Woodworking, carpentry, Surface Preparation (blast, power tool, UHP, solvent wipe, power tooling), Preservation (critical coat, non-critical coat, spray, brush/roll, Xylon 1010), Insulation/lagging removal & reinstallation, Metal fabrication & Ship fitting, Shop welding, Shipboard welding, Pipe fitting & Fabrication, QA inspections, Powder Coating, Lead Ballast loading & unloading, Zincs removal, replace, & reinstallation, Staging & Containment, Pressure washing & steam cleaning, and Dialetric Shield removal & reinstallation.
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$3.2M
Received · FY2025–FY2027
$3.2M
Received · all years
13
Subawards
5
Primes
Top primes
| Prime contractor | Total |
|---|---|
| BAE SYSTEMS MARITIME SOLUTIONS NORFOLK INC. | $1.4M |
| MARINE HYDRAULICS INTERNATIONAL, LLC | $1.2M |
| METRO MACHINE CORP. | $378K |
| HII Mission Technologies Corp | $146K |
| VIGOR MARINE LLC | $97K |
Most recent
- −$21KREDUCED TO DESCOPE PARAS 3.2 - 3.4 REDUCED TO DESCOPE PARAS 3.2 - 3.4 REDUCED TO COMPENSATE AME'S CLEAN UP SUPPORT IN AUX #2 MACHINERY SPACE & BILGE
- $55KFFP 2 OR MORE NON-COMMERCIAL
- $1.4MDIRECT SUBCONTRACT COSTS 01/16/25_$499,397_C/O-00 02/11/25_$8511_C/O-01 02/13/25_$16,618_C/O-02 06/19/25_$7141_C/O-03 07/03/25_$69,417_C/O-04 07/21/25_$1241_C/O-05 07/22/25_$6016_C/O-06 07/23/25_$33,593_C/O-07 09/16/25_$408,505_C/O-08 10/10/25_$1880_C/O-09 11/21/25_<$234>_C/O-11 01/08/26_$247,566_C/O-12 01/14/26_$42,152_C/O-13 03/03/26_$41,772_C/O-14 04/07/26_<$55,778>_C/O-15 04/15/26_$39,040_C/O-17 07/08/26_<$3120>_C/O-18
- $35KADDITIONAL CLEANING OF NR 1 MMR BILGE AND 500 SQFT OF REWORK
- −$138CREDIT:REDUCED BY (-$138.00) TO DESCOPE PCMS INSTALLATION IN THE AFFECTED AREA/LOCATION ONLY
- $33KACCOMPLISH 009-26 FOR LOCALIZED RESEALING OF THE EXISTING BROADCAST QUARTZ COATING, APPROX 20 TOTAL LOCATIONS IN BILGE WELLS IAW RCC 597G
- $146KNAVAL ELECTRONIC WARFARE SYSTEM MAINTENANCE
- $113KREPLACE ANGLE IRON & SUPPORTS ACCOMPLISH THE REQUIREMENTS OF 009-32, TABLE 4 LINE 14, COLUMN A AND TABLE 4, LINE 17, COLUMN B OF 2.1 FOR THE PRESERVATION OF 5 SQUARE FEET OF SCATTERED CORROSION IN 1.2.7 ACCOMPLISH 009-32, TABLE 4, LINE 19
- $5KACCOMPLISH 009-12 & PROCURE AMD INSTALL NEW MATLS ISO BILGE PRESERVE
- $97KAUXILIARY MACHINERY ROOM NUMBER 2 BILGE; PRESERVE - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO COMPLETE AUXILIARY MACHINERY ROOM NUMBER 2 BILGE; PRESERVE, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, ALL OTHER TERMS AND CONDITIONS LISTED ABOVE AND BELOW ON THIS PO APPLY TO THIS ITEM.