MJ2 CONSULTING PLLC
UEI: J5F1ABV1WTP3
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$61K
Received · FY2025–FY2027
$61K
Received · all years
1
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| TETRA TECH, INC. | $61K |
Most recent
- $61KMJ2 WILL PROVIDE DESIGN AND ENGINEERING SERVICES FOR THE CONCRETE MIX DESIGN, CONCRETE SUPPLY AND CONCRETE THERMAL ANALYSIS. TASK 1)MJ2 WILL DEVELOP CONCRETE MIXTURE PROPORTIONS "ON-PAPER" FOR THREE CONCRETE MIXTURES. EFFORT WILL INCLUDE EVALUATION OF TYPICAL REGIONAL AVAILABILITY OF CONCRETE-MAKING MATERIALS, DETERMINE REASONABLE LOCALLY SOURCED AGGREGATES, CEMENT SOURCE, SUPPLEMENTARY CEMENTITIOUS MATERIALS AND ADMIXTURES. TASK 2) MJ2 WILL PERFORM THERMAL MODELING FOR 5 PORTIONS OF THE LOCK STRUCTURE. TASK 3) MJ2 WILL REVIEW THE PROJECT CONCRETE SPECIFICATIONS SECTIONS 00 30 00 COST-IN-PLACE CONCRETE AND 03 70 00 MASS CONCRETE AND PROVIDE RECOMMENDED EDITS. MJ2 WILL PROVIDE A LIMITED NARRATIVE REGARDING THE VARIOUS CHANGES. TASK 4) TASK 1,2,AND 3 DELIVERABLES WILL BE SUBMITTED TO TETRA TECH AS A COMPREHENSIVE CONCRETE MIX DESIGN REPORT. AFTER ALL COMMENTS HAVE BEEN ADDRESS MJ2 WILL PROVIDE A FINAL REPORT STAMPED BY AN ILLINOIS PROFESSIONAL ENGINEER. MJ2 WILL REVIEW THE OVERALL FINAL DESIGN DOCUMENTATION REPORT.