ON GRADE CONSTRUCTION, INC
UEI: W8Z3CK1BKLJ9
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$478K
Received · FY2025–FY2027
$478K
Received · all years
3
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| R & W Construction Company | $478K |
Most recent
- $117K(1) UTILITY LOCATING (2) DEMO CONCRETE SIDEWALKS FOR PIPING AT EACH SITE AS SHOWN ON DRAWINGS (3) INSTALL CONCRETE PADS PER STRUCTURAL DRAWINGS AND SIZES SHOWN (4) REPLACE SIDEWALKS PER PLANS (5) VEGETATE DISTURBED AREAS (6) INSTALL PIPE SUPPORTS AT RR470 PER CS103 AND S101 DETAIL (5 TOTAL) (7) CONCRETE TESTING
- $324K0001: SITE WORK AND CIVIL CONCRETE 0001: S-DRAWING CONCRETE WORK 0002: SITE WORK AND CIVIL CONCRETE 0003: SITE WORK 0003: S-DRAWING CONCRETE WORK
- $36KUTILITY LOCATING; DEMO (2) SECTIONS OF EXISTING STEAM TUNNEL TOPS; INSTALL HEADWALLS ON EACH OF THE STEAM TUNNELS WITH DOWELS AS DIRECTED IN CONTRACT SOW; NO DETAIL SHOW ON THE HEADWALLS, FIGURING CONCRETE MAXIMUM OF 12” THICK; NO REINFORCEMENT FIGURED IN HEADWALL; AFTER HEADWALLS ARE INSTALLED, COMPLETE DEMO OF STEAM TUNNEL BETWEEN HEADWALLS; INSTALL 4” SIDEWALK AFTER SEWER LINE IS REPLACED AND BACKFILL COMPLETED; CONCRETE TESTING