FedOps logoFedOps

P1 CONSTRUCTION LLC

UEI: GTKQE7T5HFF1
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$9.5M
Received · FY2025–FY2027
$9.5M
Received · all years
33
Subawards
4
Primes

Top primes

Prime contractorTotal
FIRELAKE CONSTRUCTION INC$5.6M
MILL CREEK FIRELAKE JV LLC$3.1M
HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC$834K
FIRELAKE-DIVERSIFIED JV2 LLC−$6K

Most recent

  • 11/04/2026 HONEYWELL INTERNATIONAL INC. · DENA0002839 · Department of Energy (DOE)
    INDUCTION FURNACE
    −$583
  • 09/01/2026 FIRELAKE CONSTRUCTION INC · 1232SA25C0012 · Department of Agriculture (USDA)
    "RELOCATE THE CONDUITS AND SWITCHES (5 LOCATIONS) TO THE ELEVATED PLATFORM AREA. USE EXISTING SWITCH BOX AS A JUNCTION BOX. EXISTING LIGHTS AND CONDUIT TO BE REUSED AS MUCH AS POSSIBLE. PULL NEW WIRES IF NECESSARY."
    $6K
  • 07/22/2026 HONEYWELL INTERNATIONAL INC. · DENA0002839 · Department of Energy (DOE)
    WASTE INDUCTION FURNACE
    $80K
  • 05/20/2026 FIRELAKE CONSTRUCTION INC · 1232SA26F0205 · Department of Agriculture (USDA)
    ELECTRICAL RELOCATION FOR NBAF ELEVATED PLATFORMS, INCLUDING WWTP DISCONNECTS/AUTO SAMPLER ELECTRICAL, INCINERATOR RACEWAYS, CUP LIGHTING AND CONDUIT REROUTING, SUBMITTALS, CLEANUP, AND CLOSEOUT.
    $19K
  • 05/18/2026 FIRELAKE CONSTRUCTION INC · 1232SA26F0205 · Department of Agriculture (USDA)
    MECHANICAL PIPING RELOCATION FOR NBAF ELEVATED PLATFORMS, INCLUDING LHW PIPING DEMOLITION, SHUTOFF VALVE INSTALLATION/REUSE, VALVE INSULATION, CLEANUP, SUBMITTALS, AND CLOSEOUT.
    $5K
  • 05/12/2026 MILL CREEK FIRELAKE JV LLC · 1232SA26F0118 · Department of Agriculture (USDA)
    LABOR, MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE THE ELECTRICAL WORK FOR THE PROJECT.
    $94K
  • 05/01/2026 FIRELAKE CONSTRUCTION INC · 1232SA25F0126 · Department of Agriculture (USDA)
    2.3 TASKS (PLEASE REFER TO RFI’S FOR ANY CHANGES TO SCOPE) TASKS 2.3.2 THROUGH 2.3.4.2 REFER TO RFI’S & FIGURES 2.4 TESTING 2.4.1 LEAK TESTING: 2.4.1.1 PRESSURIZE NEW WORK AND TEST WITH SOAP BUBBLE SOLUTION TO VERIFY LEAK FREE. 2.4.1.2 ANY LEAKS SHALL BE REPAIRED AND SYSTEM RETESTED. 2.4.2.2 INSTALLATION CONTRACTOR IS RESPONSIBLE FOR REWORK SHOULD DAMPER OPERATION FAIL.
    $20K
  • 04/23/2026 MILL CREEK FIRELAKE JV LLC · 1232SA26F0118 · Department of Agriculture (USDA)
    INSTALL OF PIPING AND VALVES
    $2.5M
  • 04/02/2026 FIRELAKE-DIVERSIFIED JV2 LLC · 68HERC23F0558 · Environmental Protection Agency (EPA)
    DEDUCT CHANGE ORDER TO TRUE UP SALES TAXES.
    −$10K
  • 03/06/2026 HONEYWELL INTERNATIONAL INC. · DENA0002839 · Department of Energy (DOE)
    WASTE INDUCTION FURNACE
    $44K