| Prime contractor | Total |
|---|---|
| FIRELAKE CONSTRUCTION INC | $5.6M |
| MILL CREEK FIRELAKE JV LLC | $3.1M |
| HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC | $834K |
| FIRELAKE-DIVERSIFIED JV2 LLC | −$6K |
Most recent
- −$583INDUCTION FURNACE
- $6K"RELOCATE THE CONDUITS AND SWITCHES (5 LOCATIONS) TO THE ELEVATED PLATFORM AREA. USE EXISTING SWITCH BOX AS A JUNCTION BOX. EXISTING LIGHTS AND CONDUIT TO BE REUSED AS MUCH AS POSSIBLE. PULL NEW WIRES IF NECESSARY."
- $80KWASTE INDUCTION FURNACE
- $19KELECTRICAL RELOCATION FOR NBAF ELEVATED PLATFORMS, INCLUDING WWTP DISCONNECTS/AUTO SAMPLER ELECTRICAL, INCINERATOR RACEWAYS, CUP LIGHTING AND CONDUIT REROUTING, SUBMITTALS, CLEANUP, AND CLOSEOUT.
- $5KMECHANICAL PIPING RELOCATION FOR NBAF ELEVATED PLATFORMS, INCLUDING LHW PIPING DEMOLITION, SHUTOFF VALVE INSTALLATION/REUSE, VALVE INSULATION, CLEANUP, SUBMITTALS, AND CLOSEOUT.
- $94KLABOR, MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE THE ELECTRICAL WORK FOR THE PROJECT.
- $20K2.3 TASKS (PLEASE REFER TO RFI’S FOR ANY CHANGES TO SCOPE) TASKS 2.3.2 THROUGH 2.3.4.2 REFER TO RFI’S & FIGURES 2.4 TESTING 2.4.1 LEAK TESTING: 2.4.1.1 PRESSURIZE NEW WORK AND TEST WITH SOAP BUBBLE SOLUTION TO VERIFY LEAK FREE. 2.4.1.2 ANY LEAKS SHALL BE REPAIRED AND SYSTEM RETESTED. 2.4.2.2 INSTALLATION CONTRACTOR IS RESPONSIBLE FOR REWORK SHOULD DAMPER OPERATION FAIL.
- $2.5MINSTALL OF PIPING AND VALVES
- −$10KDEDUCT CHANGE ORDER TO TRUE UP SALES TAXES.
- $44KWASTE INDUCTION FURNACE