FedOps logoFedOps

AI POWER AND DATA, LLC

UEI: P5TQTE3AP4G1
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$98K
Received · FY2025–FY2027
$98K
Received · all years
1
Subawards
1
Prime

Top primes

Prime contractorTotal
PATTON CONTRACTORS INC$98K

Most recent

  • 03/25/2026 PATTON CONTRACTORS INC · 47PD5226F0087 · General Services Administration (GSA)
    AI POWER & DATA WILL PERFORM ALL WORK LISTED IN PROPOSAL DATED 2/4/26, AI POWER & DATA WILL FURNISH LABOR FOR DEMOLITION OF ALL FLOORING, FURNISH LABOR TO REMOVE CABINETS, SHELVES AND CASEWORK, FURNISH LABOR FOR WINDOW, DOOR FRAME AND DOOR DEMOLITION. FURNISH LABOR FOR DEMOLITION OF DRYWALL PARTITIONS, FURR DOWNS AND CEILING TILE. REMOVE WOOD WAINSCOT AND SAVE FOR REINSTALLATION, REINSTALL WOOD WAINSCOT, REMOVE ALL VINYL WALL COVERINGS AS PER DRAWINGS, FURNISH AND INSTALL METAL STUD AND DRYWALL FOR NEW PARTITIONS, FURNISH AND INSTALL NEW INSULATIONS IN ALL NEW WALLS, INSTALL GC PROVIDED FRAMES, INSTALL GC PROVIDED DOORS. PREP AND SKIM COAT ALL EXISTING WALLS FOR PAINT, PREP ALL NEW DRYWALL FOR PAINT. PAINT MENTIONED WALLS, PREP ALL DOOR FRAMES AND DOORS FOR PAINT OR STAIN, PAINT OR STAIN NEW DOOR FRAMES AND DOORS. INSTALL GC PROVIDED FLOORING, INSTALL GC PROVIDED BASE, FURNISH AND INSTALL NEW WOOD BASE IN ROOM 233N, INSTALL GC PROVIDED SCULPTED BASE, FURNISH AND INSTALL NEW CEILING GRID AND EXTEND CEILING GRID AS NEEDED, FURNISH AND INSTALL NEW CEILING TILE IN NEW GRID. REMOVE AND REINSTALL LAY IN LIGHT FIXTURED AS PER DRAWINGS. FURNISH AND INSTALL ALL CONDUIT AND WIRE NEEDED FOR ADDITIONAL 3 RECEPTACLES, 2 SINGLE POLE SWITCHES AND 2 THREE-WAY SWITCHES AS PER DRAWINGS. FURNISH AND INSTALL 4 CAT 6 CABLES, LABEL, TERMINATE AND TEST/ REMOVE ALL AI GENERATES WASTE. PROVIDE FINAL CLEAN AFTER COMPLETION OF CONSTRUCTION AND ROUGH CLEAN FROM SUB-CONTRACTOR DEBRIS.
    $98K