PASO ROBLES TANK, INC
UEI: KA1CRY8BQH35
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$1.6M
Received · FY2025–FY2027
$1.6M
Received · all years
3
Subawards
3
Primes
Top primes
| Prime contractor | Total |
|---|---|
| GRANITE-OBAYASHI 2, A JOINT VENTURE | $863K |
| CM CONSTRUCTION SERVICES, INC. | $541K |
| BETHEL DOWNSTREAM JV | $239K |
Most recent
- $863KFIRE WATER TANK WITH APPURTENANCES
- $239KPROVIDE ENGINEERING, MATERIAL, FABRICATION AND ERECTION FOR TANK
- $541KTURNKEY TANK AND FOUNDATION INSTALLATION, PER GOVERNMENT APPROVED PASO ROBLES TANK, INC., DESIGN/ENGINEERING AND CIVIL DESIGN/ENGINEERING BY MNS ENGINEERS, INC., INCLUDING, 1. TANK DESIGN, ENGINEERING, COORDINATION, FABRICATION, ERECTION, AND COATINGS. 2. NEW RING WALL TANK FOUNDATION COMPLETE (FULL SLAB IF REQUIRED WILL BE A CHANGE ORDER). A. FURNISH AND INSTALL REBAR, BOLTS, ANCHORS, PLACE CONCRETE PER DESIGN, BACKFILL PERIMETER TO SUBGRADE AND BACKFILL INTERIOR SUBGRADE WITH 6” CLEAN SAND UNDER TANK FLOOR. 3. CATHODIC PROTECTION SYSTEM. 4. HOLD POINT NACE (IN-HOUSE) COATINGS INSPECTION. 5. HYDRO-TESTING AND WASH DOWN / DISINFECTION..