PERFORMANCE CONTRACTING INC
UEI: H1CYUDQAKXU8
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$7.6M
Received · FY2025–FY2027
$7.6M
Received · all years
9
Subawards
3
Primes
Top primes
| Prime contractor | Total |
|---|---|
| VIGOR WORKS LLC | $5.3M |
| GILBANE-EXYTE A JOINT VENTURE | $1.9M |
| VIGOR MARINE LLC | $426K |
Most recent
- $1.4MLABOR FOR INSULATION SCOPES PER PROPOSAL VANCOUVER ISSD. PERFORMANCE CONTRACTING, INC. (HEREINAFTER DESIGNATED AS “CONTRACTOR”) PROPOSES TO FURNISH ALL MATERIALS AND LABOR REQUIRED FOR THE APPLICATION OF THE FOLLOWING (HEREINAFTER DESIGNATED AS THE “WORK”) FOR THE AMOUNT STATED BELOW: 2026 (1EA VESSEL PRICING) BASED ON DOCUMENT NO. 11731-83200-602_F: MARCH 13, 2024 - REVISION F. TABLE 1: BULKHEAD AND DECK THERMAL/ACOUSTIC INSULATION; TABLE 3: POTABLE WATER PIPING INSULATION; TABLE 4: EXHAUST INSULATION; SILENCER/MUFFLER BLANKETS; TABLE 5: HYDRAULIC PIPING INSULATION; TANK INSULATION; HVAC DUCTING INSULATION; AUX SEAWATER COOLING INSULATION
- $1.3MMATERIAL FOR INSULATION SCOPES PER PROPOSAL VANCOUVER ISSD. PERFORMANCE CONTRACTING, INC. (HEREINAFTER DESIGNATED AS “CONTRACTOR”) PROPOSES TO FURNISH ALL MATERIALS AND LABOR REQUIRED FOR THE APPLICATION OF THE FOLLOWING (HEREINAFTER DESIGNATED AS THE “WORK”) FOR THE AMOUNT STATED BELOW: 2026 (1EA VESSEL PRICING) BASED ON DOCUMENT NO. 11731-83200-602_F: MARCH 13, 2024 - REVISION F. TABLE 1: BULKHEAD AND DECK THERMAL/ACOUSTIC INSULATION; TABLE 3: POTABLE WATER PIPING INSULATION; TABLE 4: EXHAUST INSULATION; SILENCER/MUFFLER BLANKETS; TABLE 5: HYDRAULIC PIPING INSULATION; TANK INSULATION; HVAC DUCTING INSULATION; AUX SEAWATER COOLING INSULATION
- $1.3MLABOR FOR JOINERY PER PROPOSAL 26-006486: PERFORMANCE CONTRACTING, INC. (HEREINAFTER DESIGNATED AS “CONTRACTOR”) PROPOSES TO FURNISH ALL MATERIALS AND LABOR REQUIRED FOR
- $1.3MINSULATION SCOPES PER PROPOSAL VANCOUVER ISSD. PERFORMANCE CONTRACTING, INC. (HEREINAFTER DESIGNATED AS “CONTRACTOR”) PROPOSES TO FURNISH ALL MATERIALS AND LABOR REQUIRED FOR THE APPLICATION OF THE FOLLOWING (HEREINAFTER DESIGNATED AS THE “WORK”) FOR THE AMOUNT STATED BELOW: 2026 (1EA VESSEL PRICING) BASED ON DOCUMENT NO. 11731-83200-602_F: MARCH 13, 2024 - REVISION F. TABLE 1: BULKHEAD AND DECK THERMAL/ACOUSTIC INSULATION; POTABLE WATER PIPING INSULATION; EXHAUST INSULATION; SILENCER/MUFFLER BLANKETS; TABLE 4: HYDRAULIC PIPING INSULATION; TANK INSULATION; HVAC DUCTING INSULATION
- $1.9MUNISTRUT MATERIALS AND INSTALLATION
- $54K"110-10-001 UNDERWATER HULL; INSPECT AND REPAIR PARAGRAPHS: 3.10-3.10.1"
- $96KAIR LOCK BULKHEAD; REPAIR - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO COMPLETE AIR LOCK BULKHEAD; REPAIR, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM, AND THE ATTACHED USNS JOHN MCCAIN FLOW DOWN CLAUSES. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING.
- $202KNUMBER 2 GAS TURBINE MIXING ROOM, UPTAKE AND BOUNDARY LAYER INFRA-RED SUPPRESSION SYSTEM (BLISS) CAP; REPAIR (OPTION ITEM) - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO COMPLETE NUMBER 2 GAS TURBINE MIXING ROOM, UPTAKE AND BOUNDARY LAYER INFRA-RED SUPPRESSION SYSTEM (BLISS) CAP; REPAIR (OPTION ITEM), PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, ALL OTHER TERMS AND CONDITIONS LISTED ABOVE AND BELOW ON THIS PO APPLY TO THIS ITEM.
- $74K"WORK ITEM 123-41-002, GENERATOR ROOM; REPAIR ACCOMPLISH THE REQUIREMENTS OF PARAGRAPH 3.6-3.6.2, 3.9 CURRENT AVAIL START 2/05/2024, PCD 2/14/2025 – SCHEDULES WILL BE ESTABLISHED WITH VIGOR SUPERINTENDENT ASSIGNED TO THIS WORK ITEM EXCEPTIONS AND INCLUSIONS NOTED ON VENDOR BAFO BID ALL WORK WILL BE PERFORMED IN ACCORDANCE WITH NAVSEA STANDARD ITEMS FY23, CH-3."