REGENTS OF THE UNIVERSITY OF MINNESOTA
UEI: KABJZBBJ4B54CAGE: 0DH95Minneapolis, MN
$2.1M
Obligations · USAspending
Actions Sep '21 – Sep '25
2
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Health and Human Services$2.1M · 2 awards
Top NAICS
By obligations · USAspending, all years
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 75D30125F00001 GENERAL CHEMISTRY LAB TESTING | Centers for Disease Control and Prevention | 09/25/2025 | $794K |
| 75N95021F00001 LEAD OPTIMIZATION OF DOPAMINE D3 RECEPTOR ANTAGONIST FOR SUBSTANCE USE DISORDER (SUD). | National Institutes of Health | 09/26/2021 | $1.3M |
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$6.9M
Received · FY2025–FY2027
$6.9M
Received · all years
12
Subawards
9
Primes
Top primes
Most recent
- $403K11/11/2026 GEORGIA STATE UNIVERSITY RESEARCH FOUNDATION INC · W911NF24C0083 · Department of Defense (DOD)UNIVERSITY OF MINNESOTA SCOPE OF WORK THE UNIVERSITY OF MINNESOTA RESEARCH TEAM WILL PARTICIPATE IN THE DATA ANALYSIS, MODELING, INTERPRETATION, AND DISSEMINATION STAGES OF THIS PROJECT. THEY WILL BE RESPONSIBLE FOR THE DYNAMIC AND LINGUISTIC ANALYSES OF THE DATA, INCLUDING THE DEVELOPMENT, TESTING, AND USE OF NATURAL LANGUAGE PROCESSING AND MACHINE LEARNING MODELS RELATED TO AUTOMATICALLY CODING METACOGNITIVE PROCESSES BASED ON THE DATA COLLECTED IN THE BEHAVIORAL EXPERIMENTS
- $300KCENTER FOR PFAS REMEDIAL TECHNOLOGY ENGINEERING
- $2.4MVACCINES FOR OPIOD USE DISORDER
- $426K03/30/2026 THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK · W912CG25C0013 · Department of Defense (DOD)TASK 1A.1.5: ELWOOD-V1 DIGITAL AND AMS BUILDING BLOCK DESIGN, DURATION = Y1Q3 – Y1Q4 (ROLE: SUPPORT) TASK 1A.1.6: ELWOOD-V1 INTEGRATION, DURATION = Y2Q1-Y2Q1 (ROLE: SUPPORT) TASK 1A.2.1: LARGE-SCALE ANALOG MEMORY CIRCUIT-ARCHITECTURE CO-DESIGN, DURATION = Y1Q1-Y1Q2 (ROLE: LEAD) TASK 1A.2.2: LARGE-SCALE ANALOG MEMORY PVT TOLERANT CIRCUIT DESIGN, DURATION = Y1Q3-Y1Q3 (ROLE: LEAD) TASK 1A.2.3: LARGE-SCALE ANALOG MEMORY ARRAY LAYOUT GENERATION, DURATION = Y1Q4-Y1Q4 (ROLE: LEAD) TASK 1A.3.1: SRAM-BASED AAIMC BUILDING BLOCK DESIGN, DURATION = Y1Q1-Y1Q2 (ROLE: SUPPORT) TASK 1A.4.1: DEVELOPMENT OF ON-CHIP PVT AND AGING SENSOR, DURATION = Y1Q1-Y1Q2 (ROLE: LEAD) TASK 1A.4.2: TRAINING USING SENSOR INPUTS, DURATION = Y1Q3-Y1Q4 (ROLE: SUPPORT) PHASE 1B (OPTION I) TASK 1B.1.1: ELWOOD-V1 TAPEOUT, DURATION = Y2Q2-Y2Q2 (ROLE: SUPPORT) TASK 1B.1.2: ELWOOD-V1 TEST PREPARATION, DURATION = Y2Q3-Y2Q3 (ROLE: SUPPORT) TASK 1B.1.3: ELWOOD-V1 TEST, DURATION = Y2Q4-Y3Q1 (ROLE: SUPPORT) TASK 1B.1.4: ELWOOD-V1 DEMO SYSTEM DEVELOPMENT, DURATION = Y3Q1-Y3Q1 (ROLE: SUPPORT) PHASE 2 (OPTION II) TASK 2.1.5: ELWOOD-V2 DIGITAL AND AMS BUILDING BLOCK DEVELOPMENT, DURATION = Y3Q4-Y4Q1 (ROLE: SUPPORT) TASK 2.1.6: ELWOOD-V2 INTEGRATION, DURATION = Y4Q2-Y4Q2 (ROLE: SUPPORT) TASK 2.1.7: ELWOOD-V2 TAPEOUT, DURATION = Y4Q3-Y4Q3 (ROLE: SUPPORT) TASK 2.1.8: ELWOOD-V2 TEST PREPARATION, DURATION = Y4Q4-Y4Q4 (ROLE: SUPPORT) TASK 2.1.9: ELWOOD-V2 TEST, DURATION = Y5Q1-Y5Q2 (ROLE: SUPPORT) TASK 2.1.10: ELWOOD-V2 DEMO SYSTEM DEVELOPMENT, DURATION = Y5Q1-Y5Q2) (ROLE: SUPPORT) TASK 2.2.1: LARGE-SCALE 256K ANALOG MEMORY CIRCUIT-ARCHITECTURE CO-DESIGN, DURATION = Y3Q2-Y3Q3 (ROLE: LEAD) TASK 2.2.2: LARGE-SCALE 256K ANALOG MEMORY PVT TOLERANT CIRCUIT DESIGN, DURATION = Y3Q4-Y3Q4 (ROLE: LEAD) TASK 2.2.3: LARGE-SCALE 256K ANALOG MEMORY ARRAY LAYOUT GENERATION, DURATION = Y4Q1-Y4Q1 (ROLE: LEAD) TASK 2.3.1: ANALOG MEMORY-BASED AAIMC BUILDING BLOCK DESIGN, DURATION = Y3Q2-Y3Q4 (ROLE: SUPPORT) TASK 2.4.2: CIRCUIT BUILDING BLOCKS FOR ENERGY NORMALIZATION LAYER, DURATION = Y3Q4-Y4Q1 (ROLE: SUPPORT) TASK 2.4.3: ENERGY NORMALIZATION LAYER TESTING SUPPORT, DURATION = Y5Q1-Y5Q2 (ROLE: SUPPORT) TASK 2.5.3: DEVELOPMENT OF THE ON-CHIP ANALOG ERROR TESTER, DURATION = Y3Q2-Y4Q1 (ROLE: LEAD) TASK 2.5.4: EXPERIMENTAL VERIFICATION, DURATION = Y5Q1-Y5Q2 (ROLE: SUPPORT) TASK 1A.1.5: ELWOOD-V1 DIGITAL AND AMS BUILDING BLOCK DESIGN, DURATION = Y1Q3 – Y1Q4 (ROLE: SUPPORT) TASK 1A.1.6: ELWOOD-V1 INTEGRATION, DURATION = Y2Q1-Y2Q1 (ROLE: SUPPORT) TASK 1A.2.1: LARGE-SCALE ANALOG MEMORY CIRCUIT-ARCHITECTURE CO-DESIGN, DURATION = Y1Q1-Y1Q2 (ROLE: LEAD) TASK 1A.2.2: LARGE-SCALE ANALOG MEMORY PVT TOLERANT CIRCUIT DESIGN, DURATION = Y1Q3-Y1Q3 (ROLE: LEAD) TASK 1A.2.3: LARGE-SCALE ANALOG MEMORY ARRAY LAYOUT GENERATION, DURATION = Y1Q4-Y1Q4 (ROLE: LEAD) TASK 1A.3.1: SRAM-BASED AAIMC BUILDING BLOCK DESIGN, DURATION = Y1Q1-Y1Q2 (ROLE: SUPPORT) TASK 1A.4.1: DEVELOPMENT OF ON-CHIP PVT AND AGING SENSOR, DURATION = Y1Q1-Y1Q2 (ROLE: LEAD) TASK 1A.4.2: TRAINING USING SENSOR INPUTS, DURATION = Y1Q3-Y1Q4 (ROLE: SUPPORT) PHASE 1B (OPTION I) TASK 1B.1.1: ELWOOD-V1 TAPEOUT, DURATION = Y2Q2-Y2Q2 (ROLE: SUPPORT) TASK 1B.1.2: ELWOOD-V1 TEST PREPARATION, DURATION = Y2Q3-Y2Q3 (ROLE: SUPPORT) TASK 1B.1.3: ELWOOD-V1 TEST, DURATION = Y2Q4-Y3Q1 (ROLE: SUPPORT) TASK 1B.1.4: ELWOOD-V1 DEMO SYSTEM DEVELOPMENT, DURATION = Y3Q1-Y3Q1 (ROLE: SUPPORT) PHASE 2 (OPTION II) TASK 2.1.5: ELWOOD-V2 DIGITAL AND AMS BUILDING BLOCK DEVELOPMENT, DURATION = Y3Q4-Y4Q1 (ROLE: SUPPORT) TASK 2.1.6: ELWOOD-V2 INTEGRATION, DURATION = Y4Q2-Y4Q2 (ROLE: SUPPORT) TASK 2.1.7: ELWOOD-V2 TAPEOUT, DURATION = Y4Q3-Y4Q3 (ROLE: SUPPORT) TASK 2.1.8: ELWOOD-V2 TEST PREPARATION, DURATION = Y4Q4-Y4Q4 (ROLE: SUPPORT) TASK 2.1.9: ELWOOD-V2 TEST, DURATION = Y5Q1-Y5Q2 (ROLE: SUPPORT) TASK 2.1.10: ELWOOD-V2 DEMO SYSTEM DEVELOPMENT, DURATION = Y5Q1-Y5Q2) (ROLE: SUPPORT) TASK 2.2.1: LARGE-SCALE 256K ANALOG MEMORY CIRCUIT-ARCHITECTURE C
- $190KSCALABLE ULTRA-LOW VARIATION ANALOG-TIME NEURAL NETWORK (S-UATN) ACCELERATOR
- $308K01/13/2026 THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK · W912CG25C0013 · Department of Defense (DOD)PHASE 1A (BASE) TASK 1A.1.5: ELWOOD-V1 DIGITAL AND AMS BUILDING BLOCK DESIGN, DURATION = Y1Q3 – Y1Q4 (ROLE: SUPPORT) TASK 1A.1.6: ELWOOD-V1 INTEGRATION, DURATION = Y2Q1-Y2Q1 (ROLE: SUPPORT) TASK 1A.2.1: LARGE-SCALE ANALOG MEMORY CIRCUIT-ARCHITECTURE CO-DESIGN, DURATION = Y1Q1-Y1Q2 (ROLE: LEAD) TASK 1A.2.2: LARGE-SCALE ANALOG MEMORY PVT TOLERANT CIRCUIT DESIGN, DURATION = Y1Q3-Y1Q3 (ROLE: LEAD) TASK 1A.2.3: LARGE-SCALE ANALOG MEMORY ARRAY LAYOUT GENERATION, DURATION = Y1Q4-Y1Q4 (ROLE: LEAD) TASK 1A.3.1: SRAM-BASED AAIMC BUILDING BLOCK DESIGN, DURATION = Y1Q1-Y1Q2 (ROLE: SUPPORT) TASK 1A.4.1: DEVELOPMENT OF ON-CHIP PVT AND AGING SENSOR, DURATION = Y1Q1-Y1Q2 (ROLE: LEAD) TASK 1A.4.2: TRAINING USING SENSOR INPUTS, DURATION = Y1Q3-Y1Q4 (ROLE: SUPPORT) PHASE 1B (OPTION I) TASK 1B.1.1: ELWOOD-V1 TAPEOUT, DURATION = Y2Q2-Y2Q2 (ROLE: SUPPORT) TASK 1B.1.2: ELWOOD-V1 TEST PREPARATION, DURATION = Y2Q3-Y2Q3 (ROLE: SUPPORT) TASK 1B.1.3: ELWOOD-V1 TEST, DURATION = Y2Q4-Y3Q1 (ROLE: SUPPORT) TASK 1B.1.4: ELWOOD-V1 DEMO SYSTEM DEVELOPMENT, DURATION = Y3Q1-Y3Q1 (ROLE: SUPPORT) PHASE 2 (OPTION II) TASK 2.1.5: ELWOOD-V2 DIGITAL AND AMS BUILDING BLOCK DEVELOPMENT, DURATION = Y3Q4-Y4Q1 (ROLE: SUPPORT) TASK 2.1.6: ELWOOD-V2 INTEGRATION, DURATION = Y4Q2-Y4Q2 (ROLE: SUPPORT) TASK 2.1.7: ELWOOD-V2 TAPEOUT, DURATION = Y4Q3-Y4Q3 (ROLE: SUPPORT) TASK 2.1.8: ELWOOD-V2 TEST PREPARATION, DURATION = Y4Q4-Y4Q4 (ROLE: SUPPORT) TASK 2.1.9: ELWOOD-V2 TEST, DURATION = Y5Q1-Y5Q2 (ROLE: SUPPORT) TASK 2.1.10: ELWOOD-V2 DEMO SYSTEM DEVELOPMENT, DURATION = Y5Q1-Y5Q2) (ROLE: SUPPORT) TASK 2.2.1: LARGE-SCALE 256K ANALOG MEMORY CIRCUIT-ARCHITECTURE CO-DESIGN, DURATION = Y3Q2-Y3Q3 (ROLE: LEAD) TASK 2.2.2: LARGE-SCALE 256K ANALOG MEMORY PVT TOLERANT CIRCUIT DESIGN, DURATION = Y3Q4-Y3Q4 (ROLE: LEAD) TASK 2.2.3: LARGE-SCALE 256K ANALOG MEMORY ARRAY LAYOUT GENERATION, DURATION = Y4Q1-Y4Q1 (ROLE: LEAD) TASK 2.3.1: ANALOG MEMORY-BASED AAIMC BUILDING BLOCK DESIGN, DURATION = Y3Q2-Y3Q4 (ROLE: SUPPORT) TASK 2.4.2: CIRCUIT BUILDING BLOCKS FOR ENERGY NORMALIZATION LAYER, DURATION = Y3Q4-Y4Q1 (ROLE: SUPPORT) TASK 2.4.3: ENERGY NORMALIZATION LAYER TESTING SUPPORT, DURATION = Y5Q1-Y5Q2 (ROLE: SUPPORT) TASK 2.5.3: DEVELOPMENT OF THE ON-CHIP ANALOG ERROR TESTER, DURATION = Y3Q2-Y4Q1 (ROLE: LEAD) TASK 2.5.4: EXPERIMENTAL VERIFICATION, DURATION = Y5Q1-Y5Q2 (ROLE: SUPPORT)
- $395K11/18/2025 SEATTLE CHILDREN'S HOSPITAL · 75N93019C00070 · Department of Health and Human Services (HHS)STATEMENT OF WORK – YEAR 7 (BASE) – GALE THE GALE LABORATORY WILL PERFORM RNA-SEQ ASSAYS FOR THE NHP IMMUNOLOGIC STUDIES IN YEAR 7. WHOLE BLOOD AND TISSUE SAMPLES WILL BE RECEIVED AT THE GALE LABORATORY AT THE UNIVERSITY OF MINNESOTA FROM LOUIS PICKER (OHSU). RNA-SEQ ASSAYS WILL BE CONDUCTED BY UNIVERSITY OF MINNESOTA GENOME CENTER (UMGC). RNA-SEQ ASSAY TASKS INCLUDE 1) RNA ISOLATION AND RNA QC, 2) RNA-SEQ LIBRARY CONSTRUCTION AND LIBRARY QC, AND 3) GENERATION OF RNA SEQUENCE DATA FROM THE RESULTING MRNA-SEQ LIBRARIES ON A UG 100 PLATFORM. THE GALE LABORATORY WILL CONDUCT COMPUTATIONAL DATA ANALYSIS AND MODELING ON THE RNA-SEQ DATA SETS. IN YEAR 7, THE GALE LAB WILL ANALYZE NHP WHOLE BLOOD AND TISSUE RNA-SEQ DATA SETS THAT WERE GENERATED IN YEAR 7 AND PRIOR PERIODS. THIS ANALYSIS WILL INCLUDE BUT NOT BE LIMITED TO INITIAL DATA QC, GENERATION OF NORMALIZED EXPRESSION MATRICES, DIFFERENTIAL GENE EXPRESSION ANALYSIS, FUNCTIONAL ANALYSIS, CO-EXPRESSION ANALYSIS AND WHEN APPROPRIATE RULE-BASED MODELING.
- $601K10/17/2025 SEATTLE CHILDREN'S HOSPITAL · 75N93019C00070 · Department of Health and Human Services (HHS)THE OVERALL GOAL OF THE IMPAC-TB PROGRAM IS TO INFORM THE RATIONAL DESIGN OF AN EFFECTIVE TB VACCINE BY IDENTIFICATION OF IMMUNE RESPONSES THAT ARE CAPABLE OF CONTROLLING AND POTENTIALLY EVEN ERADICATING MTB. WE WILL ACHIEVE THIS GOAL BY IDENTIFYING AND DISSECTING PROTECTIVE PATHWAYS IN NATURAL AND VACCINE-INDUCED IMMUNITY THROUGH INTEGRATED ANALYSES OF TISSUE-SPECIFIC AND SYSTEMIC IMMUNITY IN MICE, NON-HUMAN PRIMATES (NHP), AND HUMANS. 1. THE GALE LABORATORY WILL CONDUCT RNA-SEQ ASSAYS FOR THE NHP IMMUNOLOGIC STUDIES. IN YEAR 6, THE GALE LABORATORY WILL PERFORM RNA-SEQ ASSAYS ON NHP SAMPLES COLLECTED FROM EXP #1, EXP #2, AND EXP #4. TASKS INCLUDE 1) RECEIVING TISSUE HOMOGENATE SAMPLES RECEIVED AT THE UNIVERSITY OF MINNESOTA FROM LOUIS PICKER (OHSU), 2) ISOLATING RNA FROM THESE SAMPLES AND PERFORMING RNA QC, 3) CONSTRUCTING RNA-SEQ LIBRARIES AND LIBRARY QC USING THE ISOLATED RNA, AND 4) GENERATING RNA SEQUENCE DATA FROM THE RESULTING MRNA-SEQ LIBRARIES. 2. THE GALE LABORATORY WILL CONDUCT COMPUTATIONAL DATA ANALYSIS AND MODELING ON THE RNA-SEQ DATA SETS. IN YEAR 6, THE GALE LAB WILL ANALYZE NHP WHOLE BLOOD RNA-SEQ DATA SETS THAT WERE GENERATED AT UNIVERSITY OF WASHINGTON (GALE LAB) DURING YEAR 5. THIS ANALYSIS WILL INCLUDE BUT NOT BE LIMITED TO INITIAL DATA QC, GENERATION OF NORMALIZED EXPRESSION MATRICES, DIFFERENTIAL GENE EXPRESSION ANALYSIS, FUNCTIONAL ANALYSIS, CO-EXPRESSION ANALYSIS AND WHEN APPROPRIATE RULE-BASED MODELING.
- $101KSCALABLE ULTRA-LOW VARIATION ANALOG-TIME NEURAL NETWORK (S-UATN) ACCELERATOR
- $479K08/13/2025 UNIVERSITY OF ALABAMA AT BIRMINGHAM · 75N92023F00001 · Department of Health and Human Services (HHS)THE ADVANCED RESEARCH AND DIAGNOSTIC LABORATORY WILL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN THE STUDY: (1) ARRANGE FOR TRANSFER OF 28 STUDY-OWNED ULTRALOW FREEZERS, CONTAINING PREVIOUSLY COLLECTED BIOSPECIMEN ALIQUOTS, FROM THEIR CURRENT LOCATION IN BURIEN, WA; (2) RECEIVE DELIVERY OF 28 STUDY-OWNED ULTRALOW FREEZER AND THEIR CONTENTS; (3) CONDUCT A FULL RE-INVENTORY OF ALL PREVIOUSLY COLLECTED BIOSPECIMENS; (4) CONSOLIDATE ALL PREVIOUSLY COLLECTED BIOSPECIMENS INTO 20 STUDY-OWNED ULTRALOW FREEZERS; (5) INCORPORATE UPDATED INVENTORY DETAILS INTO ARDL’S BIOREPOSITORY AND INVENTORY MANAGEMENT SYSTEM; (6) MAINTAIN FROZEN STORAGE OF ALL PREVIOUSLY COLLECTED BIOSPECIMENS IN 20 STUDY-OWNED ULTRALOW FREEZERS; (7) AS ADDITIONAL BIOSPECIMENS ARE COLLECTED, INCLUDE THEM IN THE OVERALL CARDIA BIOREPOSITORY. THIS INCLUDES FROZEN STORAGE IN STUDY-OWNED ULTRALOW FREEZERS, AND MAINTAINING RECORDS FOR THE NEW BIOSPECIMENS IN ARDL’S BIOREPOSITORY AND INVENTORY MANAGEMENT SYSTEM; AND (8) PROVIDE INVENTORY UPDATES TO THE CARDIA COORDINATING CENTER AS REQUESTED.
Subcontracts awarded
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$364K
Subbed out · FY2025–FY2027
$364K
Subbed out · all years
4
Subcontractors
85%
To small businesses
Top subcontractors
| Subcontractor | Total |
|---|---|
| OXALIS SOLUTIONS LLC | $231K |
| OHIO STATE UNIVERSITY, THE | $47K |
| COLLABORATIVE DRUG DISCOVERY, INC. | $45K |
| NIGHTHAWK INC | $40K |
By subcontractor type
As reported on each subaward; a subcontractor can count in several types.
- Minority-owned$231K · 1 sub
- SDB$231K · 1 sub
- Educational institution$47K · 1 sub
- WOSB$40K · 1 sub
- Women-owned$40K · 1 sub