GRAMEEN SHAKTI
UEI: SAQRJ4G86TC5
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
—
Received · FY2025–FY2027
$219K
Received · all years
1
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| TETRA TECH ES, INC. | $219K |
Most recent
- $219KIN CONJUNCTION WITH THE USAID/BADGE, THE SUBCONTRACTOR WILL DESIGN A SOLAR EV CHARGING STATION FOR 20 AUTO RICKSHAWS COMPLETED WITH ALL NECESSARY FITTINGS AND FIXTURES IN DIFFERENT LOCATIONS IN COX€„¢S BAZAR AS APPROVED BY BADGE. TOTAL SOLAR PANEL CAPACITY 27500WP AND EACH SOLAR EV CHARGING STATION WILL CONSIST OF A SOLAR PANEL CAPACITY OF UP TO 550WP WHICH REQUIRES 50PCS. 25KW HYBRID INVERTER 1-PHASE OR 3-PHASE, BATTERY CAPACITY 130AH/12V WILL BE USED THERE. SHED FOR PV SYSTEM AND CHARGING SPACE 2500SFT PROFILE TIN SHED WILL DEVELOP ON THE TOP AND PV WILL BE SET UP ON IT. EV BIKE CHARGER 20AMP /48V WILL NEED 20PCS. THE SUBCONTRACTOR WILL COMPLETE THE CHARGING STATION FACILITIES FOR THE PV STRUCTURE AND THE FENCING WORK AS PER THE APPROVED DRAWING. THE SYSTEM WILL BE CONNECTED TO THE NATIONAL GRID THROUGH NET METERING, AND THE SUBCONTRACTOR WILL OBTAIN ALL NECESSARY PERMISSIONS AND ENSURE THE REQUIRED FACILITIES FOR NET METERING. THE SUBCONTRACTOR WILL ALSO PROVIDE AND ENSURE 12 MONTHS OF POST-INSTALLATION MAINTENANCE AND SUPPORT SERVICES FOR THE INSTALLED SOLAR EV CHARGING STATION.