FedOps logoFedOps

SCHEVING, INC.

UEI: RDHQH6R1NJA3CAGE: 1QDL3Lancaster, CA
Browse awards
$18K
Obligations · USAspending
Actions Jun '21
1
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Top agencies

By obligations · USAspending, all years

Top NAICS

By obligations · USAspending, all years

  • 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing$18K

Recent awards

Latest contract actions by start date · USAspending

AwardAgencyStartAmount
FA930221P0066Department of the Air Force06/29/2021$18K

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$2.7M
Received · FY2025–FY2027
$2.7M
Received · all years
1
Subawards
1
Prime

Top primes

Prime contractorTotal
LEAD BUILDERS INC$2.7M

Most recent

  • 08/19/2025 LEAD BUILDERS, INC. · FA930125F0120 · Department of Defense (DOD)
    DIVISION 01- GENERAL REQUIREMENTS DIVISION 01- GENERAL REQUIREMENTS (ALL SECTIONS AS THEY RELATE TO YOUR SCOPE OF WORK) DIVISION 03 - CONCRETE 03 30 00 - CAST-IN-PLACE CONCRETE (FOR COORDINATION PURPOSES ONLY) CAST-IN-PLACE CONCRETE (FOR COORDINATION PURPOSES ONLY) DIVISION 05 - METALS 05 05 20-POST INSTALLED CONCRETE AND MASONRY ANCHORS (AS IT PERTAINS TO THIS SCOPE OF WORK) (WHILE SPECIFICATION SECTION 05 50 20-POST INSTALLED CONCRETE AND MASONRY ANCHORS IS NOT INCLUDED IN THE ISSUED PROJECT SPECIFICATIONS, CONCRETE AND MASOMY ANCHORS ARE A NORMAL PROCESS WITHIN THE HVAC AND HVAC PIPING INSTALLATIONS AND IS SHOWN ON THE DRAWINGS AND SHALL BE PE1FORMED IN ACCORDANCE WITH STANDARD INDUSTRY PRACTICES AND MANUFACTURER GUIDELINES. IF A FORMAL SPECIFICATION SECTION 05 05 20 IS ISSUED AFTER CONTRACT EXECUTION AND INCLUDES REQUIREMENTS THAT MATERIALLY DIFFER FROM STANDARD PRACTICES OR INCREASE THE SCOPE OF WORK AS CURRENTLY UNDERSTOOD, SUBCONTRACTOR MAY SUBMIT A WRITTEN REQUEST WITH SUPPORTING DOCUMENTATION FOR CONSIDERATION OF A CHANGE IN THE CONTRACT PRICE AND/OR TIME. LEAD BUILDERS INC. CANNOT GUARANTEE THAT ANY SUCH REQUEST WILL RESULT IN AN AQJUSTMENT BUT WILL REVIEW THE REQUEST IN GOOD FAITH.) 05 12 00 - STRUCTURAL STEEL DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 84 00 - FIRESTOPPING DIVISION 08 - OPENINGS 08 31 00-ACCESS DOORS AND PANELS 08 91 00-METAL WALL AND DOOR LOUVERS. DIVISION 09 - FINISHES 09 90 00-PAINTS AND COATINGS (FOR COORDINATION PURPOSES ONLY) DIVISION 13 - SPECIAL CONSTRUCTION 13 48 7 3 - SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT. DIVISION 22 - PLUMBING 22 00 00 - PLUMBING, GENERAL PURPOSE. (FOR COORDINATION PURPOSES ONLY) DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONS (HVAC) 23 05 15 - COMMON PIPING FOR HVAC** 23 05 48.19-SEISMIC BRACING FOR HVAC 23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC (FOR COORDINATION PURPOSES ONLY) 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS 23 09 00-JNSTRUMENTATION AND CONTROL FOR HVAC (FOR COORDINATION PURPOSES ONLY) 23 09 13-JNSTRUMENTATION AND CONTROL DEVICES FOR HVAC (FOR COORDINATION PURPOSES ONLY) 23 11 20-FACILITY GAS PIPING. (FOR COORDINATION PURPOSES ONLY) 23 30 00-HVAC AIR DISTRIBUTION 23 52 00-HEATING BOILERS 23 64 26-CHILLED, CHILLED-HOT AND CONDENSER WATER PIPING DIVISION 26 - ELECTRICAL 26 20 00-JNTERIOR DISTRIBUTION SYSTEM. (FOR COORDINATION PURPOSES ONLY)
    $2.7M