SMITH MECHANICAL-ELECTRICAL-PLUMBING
UEI: L5KQDRXCQ946
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$3.6M
Received · FY2025–FY2027
$3.6M
Received · all years
4
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| CM CONSTRUCTION SERVICES, INC. | $3.5M |
| ASSURANCE TECHNOLOGY CORP | $55K |
Most recent
- $55KMECHANICAL-ELECTRICAL-PLUMBING
- $1.1MMECHANICAL DESIGN ENGINEERING DDC CONTROLS CERTIFIED AIR BALANCE SCH 40 CHILLED WATER PIPING TO CONNECT NEW CHILLED WATER COILS SCH 40 HEATING HOT WATER PIPING TO CONNECT NEW HEATING HOT WATER COILS CONDENSATE PIPING FOR AHU-1 & AHU-3 INSULATION OF NEW CHILLED WATER PIPING, HEATING HOT WATER PIPING, AND CONDENSATE PIPING START UP DEMOLITION OF THE FOLLOWING EQUIPMENT: (2) AIR HANDLERS (E) AHU-1 & (E) AHU-2 (1) DX COOLING COIL SERVING (E) AHU-3 (1) DX CONDENSING UNIT SERVING (E) AHU-3 REPLACEMENT OF THE FOLLOWING EQUIPMENT: (1) HEATING AND COOLING AIR HANDLER AHU-1 (1) HEATING ONLY AIR HANDLER AHU-2 (1) CHW COOLING COIL IN AHU-3 FURNISH AND INSTALL DUCTWORK DISTRIBUTION PER SMACNA STANDARDS. ELECTRICAL TO SUPPORT INSTALLATION OF NEW MECHANICAL EQUIPMENT. MECHANICAL, ELECTRICAL, AND FIRE LIFE SAFETY ENGINEERING. HP
- $2.3MAS REQUIRED TO INSTALL NEW FAN COILS, DUCT WORK, AND PIPING. INSTALL NEW HEATING HOT WATER, CHILLED WATER, REFRIGERANT AND CONDENSATE PIPING AS REQUIRED. FURNISH AND INSTALL DUCTWORK DISTRIBUTION PER SMACNA STANDARDS. INSULATE DUCT AND PIPING AS REQUIRED. INSTALL NEW AUTOMATED LOGIC CONTROLS. AIR BALANCE BY A THIRD-PARTY CONTRACTOR. PROVIDE AND INSTALL NEW LOW PROFILE LIGHT FIXTURES IN T-BAR CEILINGS. RELOCATION OF FIRE SPRINKLERS TO ALLOW FOR INSTALLATION OF DUCTWORK.
- $185KMECHANICAL AND ELECTRICAL ENGINEERING. 2. DEMOLITION FOR HVAC, CONTROLS AND ELECTRICAL. 3. PROVIDE AND INSTALL HVAC, CONTROLS AND ELECTRICAL. 4. PIPING AND CONDUITS. 5. TESTING, ADJUSTING AND BALANCING