SWECO INTERNATIONAL AB
UEI: HNNJZXKJ1GB4
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$149K
Received · FY2025–FY2027
$180K
Received · all years
2
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| HDR ENVIRONMENTAL, OPERATIONS AND CONSTRUCTION, INC. | $149K |
| CDM INTERNATIONAL INC | $30K |
Most recent
- $149K07/23/2025 HDR ENVIRONMENTAL, OPERATIONS AND CONSTRUCTION, INC. · FA558723F0231 · Department of Defense (DOD)ENGINEERING SERVICES
- $30KUSAID MAY INSTRUCT THE CONTRACTOR TO PROVIDE PLANNING, DESIGN, PROCUREMENT SUPPORT, AND CONSTRUCTION MANAGEMENT SERVICES FOR WADI ZARQA WWTP, TO BE DESIGNED BASED ON DESIGN-BUILD-OPERATE (DBO) OR BUILD-OPERATE-TRANSFER (BOT). THE ANTICIPATED SCOPE OF WORK FOR SUBCONTRACTOR WOULD BE AS FOLLOWS: O LEAD THE PREPARATION OF TENDER DOCUMENTS, WHICH INCLUDES CONDITIONS, SPECIFICATIONS, AND PRELIMINARY DESIGN. THE FEASIBILITY STUDY AND ASSOCIATED PRELIMINARY DESIGN PREPARED UNDER THE JORDAN WATER INFRASTRUCTURE PROJECT WILL FORM THE BASIS FOR THE PRELIMINARY DESIGN, THEREFORE IT HAS BEEN ASSUMED ONLY MINOR CHANGES AND/OR ADDITIONS TO THIS PREPARATORY WORK WILL BE REQUIRED O PROVIDE SUPPORT DURING PROCUREMENT/ PRE-CONTRACT SERVICES O PROVIDE HOME OFFICE SUPPORT DURING CONSTRUCTION MANAGEMENT SUPERVISION, SUCH AS REVIEW OF DETAILED DESIGN AND SHOP DRAWINGS AND EQUIPMENT, COMMISSIONING AND PERFORMANCE TESTING.