FedOps logoFedOps

ARCHKEY SOLUTIONS LLC

UEI: T5HLAHHMEQZ9
Browse awards
$4.6M
Obligations · USAspending
Actions Sep '17 – Dec '21
5
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Top agencies

By obligations · USAspending, all years

Top NAICS

By obligations · USAspending, all years

  • 238210 Electrical Contractors and Other Wiring Installation Contractors$4.6M
  • 811219 $9K
  • 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance$6K

Recent awards

Latest contract actions by start date · USAspending

AwardAgencyStartAmount
33317922P00467272Smithsonian Institution12/10/2021$7K
70Z04220C5PTH1400U.S. Coast Guard11/01/2019$6K
9594CS18P0032Court Services and Offender Supervision Agency09/29/2018$9K
6973GH18F01214Federal Aviation Administration04/24/2018$3.0M
0020Federal Aviation Administration09/12/2017$1.6M

Contract vehicles

Task and delivery orders under these vehicles · USAspending

  • POWER SYSTEMS UPGRADE&INSTALLATION IGF::OT::IGF2 orders · $4.6M

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$570K
Received · FY2025–FY2027
$1.8M
Received · all years
8
Subawards
1
Prime

Top primes

Prime contractorTotal
FIRELAKE CONSTRUCTION INC$1.8M

Most recent

  • 07/14/2026 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    "1”>2” INSULATION WRAPS INCREASE IN CONTRACT VALUE TO ACCOUNT FOR CHANGING THE INSULATION WRAPS FOR GENERATOR EXHAUST TO 2” TO MEET SPECIFICATION."
    $3K
  • 02/27/2026 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    "FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
    $11K
  • 01/12/2026 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    "FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
    −$182
  • 10/02/2025 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    "FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
    $328K
  • 09/23/2025 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    "FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
    $169K
  • 12/06/2024 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    DISCONNECT SWITCHES CO ADD FUSED DISCONNECT SWITCHES.
    $59K
  • 08/29/2024 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    CE #005 - TRUE UP
    $1K
  • 08/19/2024 FIRELAKE CONSTRUCTION, INC. · 12805B24F0134 · Department of Agriculture (USDA)
    "FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
    $1.2M