ARCHKEY SOLUTIONS LLC
UEI: T5HLAHHMEQZ9
$4.6M
Obligations · USAspending
Actions Sep '17 – Dec '21
5
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Transportation$4.6M · 2 awards
- Court Services and Offender Supervision Agency$9K · 1 awards
- Smithsonian Institution$7K · 1 awards
- Department of Homeland Security$6K · 1 awards
Top NAICS
By obligations · USAspending, all years
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 33317922P00467272 | Smithsonian Institution | 12/10/2021 | $7K |
| 70Z04220C5PTH1400 | U.S. Coast Guard | 11/01/2019 | $6K |
| 9594CS18P0032 | Court Services and Offender Supervision Agency | 09/29/2018 | $9K |
| 6973GH18F01214 | Federal Aviation Administration | 04/24/2018 | $3.0M |
| 0020 | Federal Aviation Administration | 09/12/2017 | $1.6M |
Contract vehicles
Task and delivery orders under these vehicles · USAspending
- POWER SYSTEMS UPGRADE&INSTALLATION IGF::OT::IGF2 orders · $4.6M
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$570K
Received · FY2025–FY2027
$1.8M
Received · all years
8
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| FIRELAKE CONSTRUCTION INC | $1.8M |
Most recent
- $3K"1”>2” INSULATION WRAPS INCREASE IN CONTRACT VALUE TO ACCOUNT FOR CHANGING THE INSULATION WRAPS FOR GENERATOR EXHAUST TO 2” TO MEET SPECIFICATION."
- $11K"FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
- −$182"FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
- $328K"FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
- $169K"FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"
- $59KDISCONNECT SWITCHES CO ADD FUSED DISCONNECT SWITCHES.
- $1KCE #005 - TRUE UP
- $1.2M"FURNISH AND INSTALL DISTRIBUTION EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDED AND INSTALL PANEL G1. PROVIDE FEEDER FROM EXISTING PANEL X1 TO NEW PANEL G1. PROVIDE AND INSTALL NEW 3 POLE CIRCUIT BREAKER IN EXISTING PANEL X1. COPPER CONDUCTORS HAVE BEEN INCLUDED PER THE SPECIFICATIONS. FURNISH AND INSTALL EQUIPMENT AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. PROVIDING AND INSTALLING (2) 400KW GENERATORS, PARALLELING SWITCHGEAR PARALLELING SWITCHGEAR LOAD BANK UNDER THE BASE BID. INCLUDING THE EMPTY CONDUIT ROUGH IN FOR GENERATOR 3 AS PART OF THE BASE BID. INCLUDES THE RIGGING AND INSTALLATIONS THROUGH THE WALL LOUVER OPENINGS. FURNISH AND INSTALL LIGHT FIXTURE, CONTROLS, AND MAKE MODIFICATIONS AS INDICATED IN THE BID DOCUMENTS. FURNISH AND INSTALL RECEPTACLES AND ASSOCIATED BRANCH CIRCUITRY PER THE BID DOCUMENTS. PROVIDE ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT PER THE EQUIPMENT SCHEDULE INCLUDED IN THE BID DOCUMENTS. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM PER THE BID DOCUMENTS. TELECOMMUNICATIONS ROUGH-IN HAS BEEN INCLUDED. CABLING AND TERMINATIONS INCLUDED FOR (3) LOCATIONS AS SHOWN ON PAGE E201. LIMITED AMOUNT OF INTERIOR TEMPORARY LIGHTING AND POWER HAS BEEN INCLUDED PER OSHA STANDARDS. ANTICIPATED USING EXISTING PANELS FOR TEMP POWER AND LIGHTING. CONNECTIONS TO (1) GC OFFICE TRAILER AND (1) PARSON’S TRAILER HAVE BEEN INCLUDED . PROVIDE MAKE-SAFE DEMOLITION AS REQUIRED. DISPOSE OF BALLASTS AND LAMPS AS REQUIRED. WHERE APPLICABLE DEMOLITION IS BASED ON DEBRIS BEING DISPOSED OF BY PARSONS TO STRATEGICALLY LOCATED DUMPSTERS"