Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$609K
Received · FY2025–FY2027
$609K
Received · all years
7
Subawards
1
Prime

Top primes

Prime contractorTotal
CHICKASAW DEFENSE LOGISTICS, LLC$609K

Most recent

  • 11/01/2026 CHICKASAW DEFENSE LOGISTICS, LLC · 140D0426F1194 · Department of the Interior (DOI)
    FURNISH, RECEIVE, WAREHOUSE, DELIVER, ASSEMBLE, INSTALL, AND PLACE CONFERENCE ROOM FURNITURE, SEATING, AV STATION PANELS, AND ASSOCIATED COMPONENTS. INCLUDES ALL NECESSARY TRANSPORTATION, TRUCK ALLOCATION, FUEL, STAGING, INSTALLATION LABOR, FINAL PLACEMENT, AND REMOVAL OF INSTALLATION-RELAT PACKAGING AND DEBRIS.
    $84K
  • 10/01/2026 CHICKASAW DEFENSE LOGISTICS, LLC · 140D0426F1258 · Department of the Interior (DOI)
    "• INSTALL A MINIMUM 4-FOOT FENCING ALONG DESIGNATED SIDEWALKS AT THE SWCS DFAC. THE FENCING MUST BE POSITIONED TO PREVENT FOOT TRAFFIC ON NEWLY PLACED SOD AND ADDRESS EROSION CAUSED BY PEDESTRIAN MOVEMENT THROUGH GRASSY AREAS. • INSTALL A MINIMUM 4-INCH DIAMETER CONCRETE BOLLARDS AT THE SWCS MUSEUM. BOLLARDS MUST BE SPACED TO EFFECTIVELY PREVENT VEHICLES FROM PARKING ALONG THE ERODED ISLAND ADJACENT TO THE BUILDING. 3. PERFORMANCE REQUIREMENTS • FENCING MUST BE AT LEAST 4 FEET IN HEIGHT, CONSTRUCTED FROM DURABLE MATERIALS SUITABLE FOR OUTDOOR INSTALLATION, AND SECURELY ANCHORED ALONG DESIGNATED SIDEWALKS. • BOLLARDS MUST BE MADE OF CONCRETE, EACH WITH A 4-INCH DIAMETER, AND INSTALLED AT INTERVALS SUFFICIENT TO BLOCK VEHICLE ACCESS WHILE ALLOWING PEDESTRIAN MOVEMENT."
    $44K
  • 10/01/2026 CHICKASAW DEFENSE LOGISTICS, LLC · 140D0426F1253 · Department of the Interior (DOI)
    "2. SCOPE OF WORK • REMOVE ALL WEEDS FROM BETWEEN THE BRICK FLOORING THROUGHOUT THE ATRIUM. • APPLY AN EPOXY SEAL WITH UV PROTECTION TO THE BRICK FLOORING; THE EPOXY MAY BE CLEAR TO PRESERVE THE BRICK APPEARANCE OR A SOLID COLOR AS SPECIFIED BY THE CUSTOMER. • SAND AND CLEAN ALL LANDING AREAS AND STAIRWELLS WITHIN THE ATRIUM. • REPAINT LANDING AND STAIRWELL SURFACES WITH A UV-PROTECTED SEALANT. • PAINT ALL STAIRWELL RAILINGS MISSION BROWN, ENSURING THE USE OF RUST-PROTECTION PAINT."
    $129K
  • 10/01/2026 CHICKASAW DEFENSE LOGISTICS, LLC · 140D0426F1251 · Department of the Interior (DOI)
    "SCOPE OF WORK • REMOVE EXISTING CARPET FROM BASEMENT GYM AREAS AND HALLWAY. • INSTALL REPLACEMENT CARPET WITH TEXTURE SUITABLE FOR PHYSICAL FITNESS ACTIVITIES, COVERING APPROXIMATELY 1,800 SQUARE FEET. • SAND AND SEAL THE CONCRETE FLOOR IN THE LARGE ROOM (ABOUT 1,000 SQUARE FEET) USING TINTED CONCRETE PAINT AND A PROTECTIVE TOP COAT TO ADDRESS ADHESIVE RESIDUE. • INSTALL COVEBASE WITH A MINIMUM HEIGHT EXCEEDING 4 INCHES IN ALL AFFECTED AREAS. • PROVIDE AND INSTALL PROPER DOOR TRANSITIONS TO ENSURE SAFETY AND A FINISHED APPEARANCE. SPECIFICATIONS • REPLACEMENT CARPET MUST BE DURABLE, WITH A TEXTURE THAT SUPPORTS GYM AND FITNESS ACTIVITIES. • TINTED CONCRETE PAINT AND PROTECTIVE TOP COAT MUST BE APPLIED FOLLOWING INDUSTRY STANDARDS FOR ADHESION AND DURABILITY. • COVEBASE SHALL BE INSTALLED AT A HEIGHT GREATER THAN 4 INCHES, WITH MATERIALS SUITABLE FOR HIGH-TRAFFIC AREAS. • DOOR TRANSITIONS MUST BE INSTALLED IN ACCORDANCE WITH SAFETY AND ACCESSIBILITY REQUIREMENTS."
    $119K
  • 09/22/2026 CHICKASAW DEFENSE LOGISTICS, LLC · 140D0426F1157 · Department of the Interior (DOI)
    "• REMOVAL AND REPLACEMENT OF CARPET AND VTC: CONTRACTOR SHALL REMOVE ALL EXISTING CARPET AND VINYL TILE COMPOSITION (VTC) FLOORING THROUGHOUT THE HALLWAY. NEW CARPET SHALL BE INSTALLED IN ACCORDANCE WITH SPECIFICATIONS AND THE APPROVED COLOR SCHEME PROVIDED BY MUSEUM PERSONNEL PRIOR TO INSTALLATION. ORIGINAL WOOD COVE BASE WILL REMAIN. • PAINT RESTORATION: CONTRACTOR SHALL REMOVE OR PREPARE ALL EXISTING WALL SURFACES AS NEEDED AND REPAINT THE ENTIRE HALLWAY. THE NEW PAINT COLOR SCHEME WILL BE SELECTED AND COMMUNICATED BY MUSEUM PERSONNEL PRIOR TO THE COMMENCEMENT OF PAINTING."
    $50K
  • 09/22/2026 CHICKASAW DEFENSE LOGISTICS, LLC · 140D0426F1164 · Department of the Interior (DOI)
    "2. BRYANT HALL FLAGPOLE AREA (D-3206) • REMOVE ALL GRAVEL AND LARGE ROCKS FROM THE FLAGPOLE AREA LOCATED IN FRONT OF BRYANT HALL. • INSTALL BRICK AND MORTAR IN THE CLEARED AREA, MATCHING THE COLOR AND PATTERN OF THE MAIN ENTRANCE BRICKWORK. • ENSURE PROPER SURFACE PREPARATION, INCLUDING LEVELING AND CLEANING, BEFORE BRICK INSTALLATION. • PROVIDE (6) EACH FLAG ROPES FOR 30FT. FLAG POLES 3. BRYANT HALL AWNING RESTORATION (D-3206) • PREPARE, CLEAN, AND RESTORE THE GREEN AWNINGS AT BOTH ENTRANCES OF BRYANT HALL. • CLEAN ALL SURFACES USING APPROPRIATE METHODS TO REMOVE DIRT, RUST, AND DEBRIS. • PAINT THE AWNINGS WITH HIGH-QUALITY EXTERIOR PAINT (DTM), MATCHING THE ORIGINAL GREEN COLOR. • ALLOW FOR EVENING AND WEEKEND WORK HOURS FOR THE FRONT ENTRANCE AWNING TO MINIMIZE DISRUPTION. 4. NCO ACADEMY SIGN AREA (D-3004) • REMOVE GRAVEL, BORDER STONES, AND WEEDS FROM THE AREA SURROUNDING THE MAIN SIGN IN FRONT OF THE NCO ACADEMY. • INSTALL METAL YARD TRIM TO CREATE A CLEAN BORDER. • PLANT GRASS SEED AND COVER WITH STRAW FOR PROPER GERMINATION AND EROSION CONTROL. • ENSURE THE AREA IS PROPERLY PREPARED AND CLEANED BEFORE LANDSCAPING WORK BEGINS."
    $58K
  • 06/26/2026 CHICKASAW DEFENSE LOGISTICS, LLC · 140D0426F0626 · Department of the Interior (DOI)
    RESURFACING THE FLOORING OF THE VET BARN AND COMMUNITY CENTER WITH A HIGH-BUILD TEXTURED EPOXY FLOORING SYSTEM, INCLUDING THE INSTALLATION OF A SEAMLESS INTEGRAL COVE BASE EXTENDING NO MORE THAN 6 INCHES UP THE WALL.