TUNISTA CONSTRUCTION LLC
UEI: HG17C8B1NPB3CAGE: 6PSG3TACOMA, WA
$42.9M
Obligations · USAspending
Actions May '13 – Jan '23
16
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Defense$42.6M · 14 awards
- Department of the Interior$165K · 1 awards
- Department of Homeland Security$57K · 1 awards
Top NAICS
By obligations · USAspending, all years
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| W912DW23C0003 | Department of the Army | 01/10/2023 | $5.9M |
| 140P8319C0013 | National Park Service | 09/11/2019 | $165K |
| W9126G19F0068 | Department of the Army | 02/01/2019 | $1.9M |
| W9126G19F0020 | Department of the Army | 11/12/2018 | — |
| W9126G18F0434 | Department of the Army | 09/29/2018 | — |
| HSBP1017C00090 | U.S. Customs and Border Protection | 08/24/2017 | $57K |
| W9127817F0136 | Department of the Army | 08/10/2017 | $3.9M |
| W912QR17F0078 | Department of the Army | 06/29/2017 | $2.1M |
| FA462017F0005 | Department of the Air Force | 06/02/2017 | $500 |
| 0004 | Department of the Army | 04/27/2017 | $3.9M |
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$12.6M
Received · FY2025–FY2027
$12.6M
Received · all years
3
Subawards
3
Primes
Top primes
| Prime contractor | Total |
|---|---|
| STG PACIFIC, LLC | $9.0M |
| BRICE PACIFIC LLC | $3.1M |
| KIEWIT-ALBERICI SIOP MACC AJV | $500K |
Most recent
- $9.0MDEMO/ABATEMENT, CLEARING, GRUBBING, GRADING, CIVIL PORTION OF SITE UTILITIES, STORMWATER DETENTION AND WATER-QUALITY TREATMENT FACITILIES, ASPHALT, FENCING, GENERAL CONDITIONS
- $3.1MEARTHWORK, EROSION & SEDIMENT CONTROL, STORM DRAINAGE UTILITIES, GENERAL CONDITIONS
- $500KBASE ROCK SUPPLY AND PLACEMENT A. PROVIDE, HAUL, AND PLACE BASE ROCK MATERIAL IN DESIGNATED AREAS OF THE PROJECT SITE. B. PERFORM GRADING, COMPACTION, AND PROOF-ROLLING OF BASE ROCK TO ACHIEVE REQUIRED THICKNESS, DENSITY, AND SURFACE TOLERANCES. C. MAINTAIN THE BASE ROCK SURFACE FREE FROM RUTTING, PUMPING, AND CONTAMINATION UNTIL ACCEPTANCE OR OVERLAY BY SUBSEQUENT WORK. ASPHALT REMOVAL A. SAWCUT, BREAK, AND REMOVE EXISTING ASPHALT PAVEMENT AT PROJECT-DESIGNATED LOCATIONS. B. EXCAVATE TO REQUIRED DEPTH AND REMOVE ASPHALT AND SUB-BASE MATERIAL AS DIRECTED. C. LOAD, HAUL, AND LEGALLY DISPOSE OF ASPHALT WASTE AT AN APPROVED OFF-SITE DISPOSAL FACILITY. D. PREPARE SUBGRADE OR REPLACEMENT SECTION FOR FOLLOW-ON CONSTRUCTION IN COORDINATION WITH ADJACENT TRADES. SINKHOLE REPAIR A. EXCAVATE THE SINKHOLE AREA AND REMOVE LOOSE OR UNSUITABLE MATERIALS. B. INSTALL ENGINEERED BACKFILL (AGGREGATE, ROCK, OR CONTROLLED LOW-STRENGTH MATERIAL AS DIRECTED) IN COMPACTED LIFTS. C. RECONSTRUCT SURFACE TO MATCH ADJACENT GRADE AND PROVIDE STABLE CONDITION FOR FOLLOW-ON WORK. D. IMPLEMENT MEASURES TO PREVENT RECURRENCE, INCLUDING STABILIZATION FABRIC, DRAINAGE IMPROVEMENTS, OR OTHER MEANS IF DIRECTED. GENERAL A. PROVIDE TRAFFIC CONTROL, SITE ACCESS COORDINATION, AND LAYDOWN IN ACCORDANCE WITH ATTACHMENT A – ADDITIONAL PROVISIONS AP-E2 REQUIREMENTS. B. MAINTAIN SAFE WORK ZONES IN COMPLIANCE WITH EM 385-1-1, ACCIDENT PREVENTION PLAN (APP), AND ACTIVITY HAZARD ANALYSES (AHA). C. COORDINATE WITH OTHER SUBCONTRACTORS, INCLUDING UTILITY LOCATES SUBCONTRACTOR PRIOR TO EXCAVATION, AND CONTRACTOR TO AVOID DISRUPTION OF ONGOING WORK AND OWNER OPERATIONS. D. PERFORM DAILY CLEANUP AND REMOVE DEBRIS GENERATED BY OPERATIONS. E. PROTECT ADJACENT STRUCTURES, PAVEMENTS, AND UTILITIES. REPAIR DAMAGE CAUSED BY SUBCONTRACTOR AT NO COST TO CONTRACTOR. F. PROTECT COMPLETED WORK WITH CONE DELINEATION AND/OR CONSTRUCTION ROPE UNTIL MATERIALS HAVE COME TO STRENGTH AND ARE SAFE TO WALK OR DRIVE ON.