SUNRISE NETWORK SOLUTIONS INC
UEI: UJFVAJ1XRNE5
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$56K
Received · FY2025–FY2027
$56K
Received · all years
1
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| SEITZ CONSTRUCTION SERVICE LLC | $56K |
Most recent
- $56KINSTALL, TERMINATE, TEST AND LABEL APPROXIMATELY (102) CATEGORY 6 VOICE/DATA CABLES TO LOCATIONS SHOWN ON PROJECT PLANS. TERMINATE EACH OUTLET END WITH CATEGORY 6 MODULAR INSERT AND DRESS INTO MULTI-PORT COVER PLATE. TERMINATE IT ROOM END WITH CATEGORY 6 MODULAR INSERT AND DRESS INTO 48-PORT PATCH PANEL. EACH OUTLET SHALL BE CONFIGURED WITH (2) CABLES. EXISTING FLOOR BOX OUTLETS SHALL BE RE-CONFIGURED AS WALL OUTLETS IN ROOM 109. EXISTING WALL OUTLETS SHALL REMAIN UNDISTURBED AND EXISTING FLOOR BOXES SHALL REMAIN UNDISTURBED AS NOTED ON PLANS. INSTALL, TERMINATE, TEST AND LABEL APPROXIMATELY (1) RG6 TELEVISION CABLES TO LOCATIONS SHOWN ON PROJECT PLANS AT TV LOCATION IN ROOM 124. TERMINATE EACH END OF EACH CABLE WITH COMPRESSION-STYLE “F” CONNECTOR AND DRESS INTO MULTI-PORT COVER PLATE. TERMINATE IT ROOM END AT SPLITTER FIELD. ADD (2) NEW 48-PORT PATCH PANELS IN EXISTING SERVER RACK IN ROOM 123. COORDINATE WITH 81CS FOR PLACEMENT OF PATCH PANELS. ADD HORIZONTAL WIRE MANAGERS IN EXISTING SERVER RACK AS REQUIRED BY 81CS DURING COORDINATION MEETING. PROVIDE SELECTIVE DEMOLITION AS NEEDED AT EXISTING OUTLET LOCATIONS BEING RE-CONFIGURED. COIL CABLES ABOVE CEILING AND TAG FOR FUTURE RE-USE WHERE APPLICABLE. DEMO BACK TO SOURCE IF REQUIRED.