UNIVERSITY SYSTEM OF NEW HAMPSHIRE
Top agencies
By obligations · USAspending, all years
- National Aeronautics and Space Administration$58.2M · 20 awards
- Department of Defense$17.7M · 19 awards
- Department of the Interior$6.2M · 8 awards
- Department of Commerce$1.6M · 12 awards
- Environmental Protection Agency$842K · 7 awards
- Department of Homeland Security$150K · 1 awards
Top NAICS
By obligations · USAspending, all years
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)$41.9M
- 517919 $17.1M
- 336414 Guided Missile and Space Vehicle Manufacturing$11.9M
- 541712 $11.1M
- 611310 Colleges, Universities, and Professional Schools$1.2M
- 541519 Other Computer Related Services$414K
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 1305M226C0026 NOS/OCS; INFORMATION TECHNOLOGY SUPPORT FOR NOAA EMPLOYEES AND CONTRACTORS AT THE JOINT HYDROGRAPHIC CENTER PURSUANT TO THE HYDROGRAPHIC SERVICES IMPROVEMENT ACT OF 1998 AND THE COAST AND GEODETIC SURVEY ACT. | National Oceanic and Atmospheric Administration | 10/01/2026 | $78K |
| 80NSSC26P0926 PROFESSOR OF PHYSICS & ASTRONOMY, TO PARTICIPATE IN THE LIGHTNING ADVISORY PANEL (LAP) AND FURTHER DEVELOPMENT AND EVALUATION OF THE LIGHTNING LAUNCH COMMIT CRITERIA (LLCC). | National Aeronautics and Space Administration | 07/02/2026 | $53K |
| 80NSSC26P0366 SUPERHERO ALIGNMENT MONITORING SYSTEM (AMS) CONTRACT | National Aeronautics and Space Administration | 03/27/2026 | $253K |
| W913E525C0012 CSO TITLED, 'IMPROVED SOIL AND SNOW PROCESSES AND MOBILITY PERFORMANCE' U437A00 | Department of the Army | 09/11/2025 | $1.4M |
| 80NSSC25PB422 PERFORM ON LIGHTNING ADVISORY PANEL | National Aeronautics and Space Administration | 07/09/2025 | $39K |
| 80LARC25FA010 FLIGHT SPARE ELEVATION AND AZIMUTH CABLE WRAPS FOR LIFE TESTING. | National Aeronautics and Space Administration | 12/20/2024 | $423K |
| 80GSFC25CA018 THIS ACTION IS FOR THE PRODUCTION OF TWO (2) SOLAR WIND PLASMA SENSOR (SWIPS) FLIGHT INSTRUMENTS. | National Aeronautics and Space Administration | 10/29/2024 | $11.9M |
| 80ARC025CA001 HELIOSWARM PROGRAM SUPPORT | National Aeronautics and Space Administration | 10/15/2024 | $19.2M |
| 80LARC24FA045 PERFORM INSTRUMENT MODIFICATIONS UNDER TASK ORDER 80LARC22FA013 TO SUPPORT POTENTIAL HOST SPACECRAFT EXTERNAL STRUCTURAL ATTACHMENT FOR LAUNCH SURVIVAL HOST SPACECRAFT INERTIAL REFERENCE UNIT (IRU) CONNECTION TO THE INSTRUMENT MISSION LINE OF SIGHT | National Aeronautics and Space Administration | 09/10/2024 | $419K |
| W912HZ24C0050 BAA 24-0015 YEAR 1 "COASTAL RESILIENCY IN SALT MARSHES AND MARINE VEGETATED ENVIRONMENTS" U430400 | Department of the Army | 08/05/2024 | $250K |
Expiring contracts
Period of performance ending in the next 18 months · USAspending
- W913E523C0004 · Department of Defense$3.3M · ends 05/04/2028
- W913E525C0012 · Department of Defense$1.4M · ends 09/14/2027
- 1305M226C0026 · Department of Commerce$78K · ends 09/30/2027
- 80NSSC26P0926 · National Aeronautics and Space Administration$53K · ends 07/02/2027
Contract vehicles
Vehicles this company holds its own contract on, with or without orders · USAspending IDV records, GSA eLibrary SINs
No multiple-award vehicles open for orders.
Single-award IDIQs, BPAs and BOAs open for orders (1)
- GEOSTATIONARY LITTORAL IMAGING AND MONITORY RADIOMETER (GLIMR)PROVIDES OBSERVATIONS OF EVOLVING PROCESSES SUCH AS PHYTOPLANKTON PHYSIOLOGY AND BLOOM EVOLUTION,DISSOLVED AND PARTICULATE CARBON TRANSFORMATIONS,COASTAL STORM DAMAGE · IDIQ · National Aeronautics and Space Administration01/31/2030
Expired vehicles (4)
- SUPPORT OF EPA REGION 1 STORMWATER PERMITTING, NONPOINT SOURCE AND WATER QUALITY PROGRAMS; MAINTENANCE AND MONITORING OF SUBSURFACE GRAVEL WETLAND STORMWATER CONTROL MEASURE RETROFITS ON CAPE COD. · IDIQ · Environmental Protection Agency09/30/2026
- ACCESS TO UNIVERSITY OF NEW HAMPSHIRE LABORATORIES (U437P00) · BPA · Department of Defense08/08/2026
- IGF::OT::IGF PAVEMENT ANALYSIS TO DEVELOP ANALYTICAL PROCEDURES AND GUIDANCE ON THE OPTIMUM TIME TO REOPEN FLOODED PAVEMENTS TO VEHICLES WITH VARIOUS WEIGHTS AND AXLE LOADS. · IDIQ · Department of Transportation03/31/2019
- SEE FILE · IDIQ · Environmental Protection Agency12/14/2012
Orders are task and delivery orders in USAspending under this company's contract on the vehicle. Open a vehicle to see its other holders, or browse all contract vehicles.
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
Top primes
| Prime contractor | Total |
|---|---|
| THE TRUSTEES OF PRINCETON UNIVERSITY | $906K |
| THE UNIVERSITY OF IOWA | $837K |
| MASSACHUSETTS INSTITUTE OF TECHNOLOGY | $75K |
| PHYSICAL SCIENCES INC. | $42K |
Most recent
- −$12K07/13/2026 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)SUPPORT TEAM WEEKLY TRACERS TELECONS. ASSIST THE TRACERS TEAM IN RE-PLANNING THE MISSION CONCEPT. PROVIDE INPUTS TO THE DELTA CONCEPT STUDY REPORT. THIS INCLUDES EVALUATING COST SAVINGS IDEAS AND PERFORMING NECESSARY COST/BENEFIT TRADES. INITIAL COST SAVINGS LIST FOR UNH IS LISTED IN APPENDIX A. ADDITIONAL COST SAVING IDEAS MAY BE GENERATED DURING EXECUTION OF PHASE A EXTENSION. PERFORM SCIENCE AND ENGINEERING ACTIVITIES AS NEEDED TO SUPPORT REFINEMENT OF THE TRACERS MISSION DESIGN AS REQUIRED TO SUPPORT COST SAVINGS. PERFORM INSTRUMENT SUBSYSTEM COST/BENEFIT TRADES AS REQUIRED. SUPPORT INPUTS/UPDATES TO THE DRAFT MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) COMMENSURATE WITH ACCEPTED COST SAVING IDEAS. MDRAS DEFINE LEVEL 2 REQUIREMENTS FOR THE BASELINE MISSION. SUPPORT THE OCTOBER AND NOVEMBER ONLY RE-PLAN COORDINATION MEETINGS AT IOWA WITH 1 CDPU LEADER. UPDATE AND SUBMIT TO IOWA THE CERTIFIED PHASE B COST PROPOSAL. LEAD CO-INVESTIGATOR TO SUPPORT AND ATTEND DELTA CSR PRESENTATION AT NASA HQ IAW. PROVIDE MONTHLY FINANCIAL 533 REPORTS.
- $75KR&D-SCHOOLS, NON-MIT
- $906K01/30/2026 TRUSTEES OF PRINCETON UNIVERSITY, THE · 80GSFC19C0027 · National Aeronautics and Space Administration (NASA)INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP)
- $943K12/15/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)SUPPORT TEAM WEEKLY TRACERS TELECONS. ASSIST THE TRACERS TEAM IN RE-PLANNING THE MISSION CONCEPT. PROVIDE INPUTS TO THE DELTA CONCEPT STUDY REPORT. THIS INCLUDES EVALUATING COST SAVINGS IDEAS AND PERFORMING NECESSARY COST/BENEFIT TRADES. INITIAL COST SAVINGS LIST FOR UNH IS LISTED IN APPENDIX A. ADDITIONAL COST SAVING IDEAS MAY BE GENERATED DURING EXECUTION OF PHASE A EXTENSION. PERFORM SCIENCE AND ENGINEERING ACTIVITIES AS NEEDED TO SUPPORT REFINEMENT OF THE TRACERS MISSION DESIGN AS REQUIRED TO SUPPORT COST SAVINGS. PERFORM INSTRUMENT SUBSYSTEM COST/BENEFIT TRADES AS REQUIRED. SUPPORT INPUTS/UPDATES TO THE DRAFT MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) COMMENSURATE WITH ACCEPTED COST SAVING IDEAS. MDRAS DEFINE LEVEL 2 REQUIREMENTS FOR THE BASELINE MISSION. SUPPORT THE OCTOBER AND NOVEMBER ONLY RE-PLAN COORDINATION MEETINGS AT IOWA WITH 1 CDPU LEADER. UPDATE AND SUBMIT TO IOWA THE CERTIFIED PHASE B COST PROPOSAL. LEAD CO-INVESTIGATOR TO SUPPORT AND ATTEND DELTA CSR PRESENTATION AT NASA HQ IAW. PROVIDE MONTHLY FINANCIAL 533 REPORTS.
- $42KPHYSICAL SCIENCES INC. (PSI), IN COOPERATION WITH UNIVERSITY OF NEW HAMPSHIRE (UNH), WILL DEVELOP A GATED, UNDERWATER LIDAR FOR LATERAL SHEAR AND STRAIN (GULLSS) SYSTEM FOR MEASURING LATERAL, ANISOTROPIC VELOCITY GRADIENTS IN OCEAN ENVIRONMENTS. UNDER THE PROPOSED PROGRAM, PSI WILL LEAD THE DEVELOPMENT OF THE GULLSS SENSOR CONCEPT DESIGN INCLUDING OPTICAL, MECHANICAL AND ELECTRICAL SUBSYSTEMS AS WELL AS ASSOCIATED PROCESSING ROUTINES AND SOFTWARE. UNH WILL PROVIDE INPUT TO THE GULLSS SENSOR DESIGN CONCEPT BY PROVIDING EXPERTISE ON TARGET ANISOTROPIC TURBULENCE AND LATERAL VELOCITY GRADIENTS AS WELL AS EXPLORING EXPECTED TURBULENCE TO INFORM CONCEPT DESIGN. ADDITIONALLY, UNH WILL SUPPORT BREADBOARD TESTING AND INITIAL RISK MITIGATION EXPERIMENTS BY GENERATING TURBULENCE FIELDS IN THE UNH TURBULENCE TANK FOR SMALL SCALE DEMONSTRATIONS, AND THE UNH ENGINEERING TANK FOR LARGER SCALE DEMONSTRATIONS. SPECIFIC UNH TASKS ARE AS FOLLOWS.
- $56K09/24/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)SUPPORT TEAM WEEKLY TRACERS TELECONS. ASSIST THE TRACERS TEAM IN RE-PLANNING THE MISSION CONCEPT. PROVIDE INPUTS TO THE DELTA CONCEPT STUDY REPORT. THIS INCLUDES EVALUATING COST SAVINGS IDEAS AND PERFORMING NECESSARY COST/BENEFIT TRADES. INITIAL COST SAVINGS LIST FOR UNH IS LISTED IN APPENDIX A. ADDITIONAL COST SAVING IDEAS MAY BE GENERATED DURING EXECUTION OF PHASE A EXTENSION. PERFORM SCIENCE AND ENGINEERING ACTIVITIES AS NEEDED TO SUPPORT REFINEMENT OF THE TRACERS MISSION DESIGN AS REQUIRED TO SUPPORT COST SAVINGS. PERFORM INSTRUMENT SUBSYSTEM COST/BENEFIT TRADES AS REQUIRED. SUPPORT INPUTS/UPDATES TO THE DRAFT MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) COMMENSURATE WITH ACCEPTED COST SAVING IDEAS. MDRAS DEFINE LEVEL 2 REQUIREMENTS FOR THE BASELINE MISSION. SUPPORT THE OCTOBER AND NOVEMBER ONLY RE-PLAN COORDINATION MEETINGS AT IOWA WITH 1 CDPU LEADER. UPDATE AND SUBMIT TO IOWA THE CERTIFIED PHASE B COST PROPOSAL. LEAD CO-INVESTIGATOR TO SUPPORT AND ATTEND DELTA CSR PRESENTATION AT NASA HQ IAW. PROVIDE MONTHLY FINANCIAL 533 REPORTS.
- −$150K06/25/2025 UNIVERSITY OF IOWA, THE · 80GSFC18C0008 · National Aeronautics and Space Administration (NASA)SUPPORT TEAM WEEKLY TRACERS TELECONS. ASSIST THE TRACERS TEAM IN RE-PLANNING THE MISSION CONCEPT. PROVIDE INPUTS TO THE DELTA CONCEPT STUDY REPORT. THIS INCLUDES EVALUATING COST SAVINGS IDEAS AND PERFORMING NECESSARY COST/BENEFIT TRADES. INITIAL COST SAVINGS LIST FOR UNH IS LISTED IN APPENDIX A. ADDITIONAL COST SAVING IDEAS MAY BE GENERATED DURING EXECUTION OF PHASE A EXTENSION. PERFORM SCIENCE AND ENGINEERING ACTIVITIES AS NEEDED TO SUPPORT REFINEMENT OF THE TRACERS MISSION DESIGN AS REQUIRED TO SUPPORT COST SAVINGS. PERFORM INSTRUMENT SUBSYSTEM COST/BENEFIT TRADES AS REQUIRED. SUPPORT INPUTS/UPDATES TO THE DRAFT MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) COMMENSURATE WITH ACCEPTED COST SAVING IDEAS. MDRAS DEFINE LEVEL 2 REQUIREMENTS FOR THE BASELINE MISSION. SUPPORT THE OCTOBER AND NOVEMBER ONLY RE-PLAN COORDINATION MEETINGS AT IOWA WITH 1 CDPU LEADER. UPDATE AND SUBMIT TO IOWA THE CERTIFIED PHASE B COST PROPOSAL. LEAD CO-INVESTIGATOR TO SUPPORT AND ATTEND DELTA CSR PRESENTATION AT NASA HQ IAW. PROVIDE MONTHLY FINANCIAL 533 REPORTS.
- $30KTHE PENNSYLVANIA STATE UNIVERSITY THROUGH ITS APPLIED RESEARCH LABORATORY (PENN STATE ARL) REQUIRES SUBJECT MATTER EXPERTISE FROM THE UNIVERSITY OF NEW HAMPSHIRE (UNH OR SUBCONTRACTOR) IN SUPPORT OF PENN STATE ARL’S EFFORT TO SUPPORT THE BURIED OBJECT DETECTION YIELD WORKING GROUP (BODY WG). THE SUPPORT FROM UNH WILL INCLUDE DATA ANALYSIS, MEETING ATTENDANCE, AND REPORT SUBMISSION.
Subcontracts awarded
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
Top subcontractors
| Subcontractor | Total |
|---|---|
| SOUTHWEST RESEARCH INSTITUTE | $8.7M |
| RAYTHEON COMPANY | $5.1M |
| THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | $4.1M |
| SMITHSONIAN INSTITUTION | $3.0M |
| THE JOHNS HOPKINS UNIVERSITY | $1.5M |
| THE AEROSPACE CORPORATION | $609K |
| THE UNIVERSITY OF IOWA | $97K |
| UNIVERSITY OF ARIZONA | $55K |
By subcontractor type
As reported on each subaward; a subcontractor can count in several types.
- Nonprofit$16.8M · 5 subs
- Educational institution$5.7M · 4 subs
- Manufacturer$5.1M · 1 sub