YANNEY ELECTRIC LLC
UEI: PZHFQK1KZ282
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$251K
Received · FY2025–FY2027
$251K
Received · all years
2
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| STAMPEDE VENTURES, INC. | $251K |
Most recent
- $88KZ3A-11 ● FURNISH AND INSTALL TWO (2) 120V-15A OUTLETS IN THE CENTER ON CEILING OF THE FRONT ROOM. ● FURNISH AND INSTALL TWO (2) 120V-15A OUTLETS IN THE CENTER ON CEILING OF THE BACK ROOM. ● FURNISH AND INSTALL TWO (2) CONDUIT PASS THROUGHS FROM Z3A-11 TO Z3A-10 Z3A12-14 ● REMOVE WIREMOLD SAVE FOR REUSE ● DEMOLISH SWITCHES AND CIRCUITRY AS NEEDED FROM WALL TO BE DEMOLISHED ● CONVERT (13) EXISTING TWIST LOCK RECEPTACLE TO 120V DUPLEX RECEPTACLES (13) ● REINSTALL WIREMOLD AND FURNISH CIRCUITRY ON FRONT AND REAR WALLS OF Z3A-12 ● DEMO SECTION OF CABLE TRAY IN Z3A-12 ● REWORKING LIGHTING CONTROL FOR NEW LAYOUT ● FURNISH AND INSTALL CABLE TRAY ● FURNISH AND INSTALL WIREMOLD ON CABLE TRAY ● FURNISH AND INSTALL (4) WIREWAY PASSTHROUGHS ● FURNISH AND INSTALL DOOR INTERLOCK
- $163K● DEMO GROUND BOXES AND ABANDON ALL CONDUITS IN GROUND ● FURNISH AND INSTALL 2” RGS (RIGID GALVANIZED STEEL) CONDUIT FROM BUILDING TO JUNCTION BOX ● FURNISH AND INSTALL 4” RGS CONDUIT FROM BUILDING TO JUNCTION BOX ● FURNISH AND INSTALL 3” RGS CONDUIT FOR RACK SUPPORT ● FURNISH AND INSTALL STRUT FOR RACKS ● FURNISH AND INSTALL (2) FREESTANDING ELECTRICAL ENCLOSURES ON RIGID CONDUIT ● FURNISH AND INSTALL (2) IP68 WATERPROOF BNC ADAPTER, F/F WITH DUST CAPS ● FURNISH AND INSTALL (4) CATEGORY 6 IP68 WATERPROOF BULKHEAD PANEL MOUNT ETHERNET COUPLER ADAPTER WITH DUST CAP