Awarding Agency
Sub-Agency
Department of State
Start Date
March 17, 2020
End Date
March 14, 2027
NAICS
PSC
Y1AA
Description
DESIGN AND BUILD CONSTRUCTION OF NEW OFFICE ANNEX&CHANCERY RENOVATION IN BANGKOK, THAILAND
Transactions (33)
| Date | Mod # | Obligation |
|---|---|---|
| Mar 17, 2020 | 0 | +$409,763,243 |
| Jul 15, 2020 | P00001 | +$6,936,160 |
| Mar 3, 2021 | P00002 | +$0 |
| Sep 20, 2021 | P00003 | +$0 |
| Sep 24, 2021 | P00004 | +$350,000 |
| Apr 11, 2022 | P00005 | +$501,528 |
| Jun 30, 2022 | P00006 | +$0 |
| Jul 25, 2022 | P00007 | -$1,101,753 |
| Sep 28, 2022 | P00008 | -$64,587 |
| Mar 24, 2023 | P00009 | +$584,033 |
| May 4, 2023 | P00010 | +$682,042 |
| May 16, 2023 | P00012 | +$0 |
| May 19, 2023 | P00011 | -$180,631 |
| May 23, 2023 | P00013 | +$629,465 |
| Jul 17, 2023 | P00014 | +$1,281,392 |
| Sep 8, 2023 | P00015 | +$19,208 |
| Nov 2, 2023 | P00016 | +$0 |
| Jan 9, 2024 | P00017 | +$15,460 |
| Feb 15, 2024 | P00018 | -$20,532 |
| Apr 18, 2024 | P00019 | +$984,288 |
| Jun 28, 2024 | P00020 | +$13,401 |
| Aug 30, 2024 | P00021 | -$6,633,177 |
| Sep 30, 2024 | P00022 | +$27,500,000 |
| Nov 14, 2024 | P00023 | +$0 |
| Jan 14, 2025 | P00024 | +$41,172 |
| Feb 21, 2025 | P00025 | +$202,538 |
| Mar 19, 2025 | P00026 | +$361,476 |
| Apr 2, 2025 | P00027 | +$410,273 |
| May 19, 2025 | P00028 | +$13,395 |
| Aug 26, 2025 | P00029 | +$17,608 |
| Jan 29, 2026 | P00030 | -$45,519 |
| Jul 30, 2026 | P00031 | +$25,735 |
| Sep 29, 2026 | P00032 | +$331,041 |
Subcontractors 47$3,778,389 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI DSQLL3J5WS28 Rfr-1 rubber anti-static flooring m - spo | $54,437 |
UEI UCDDUN6A6S17 Wtmd's and itemisers - spo | $61,585 |
UEI XPU7GN97SSQ1 Waterproof flooring system (faf-1) for mechanical equip room #2 | $55,088 |
UEI SLW1NLFJRSU9 Horizontal louver blinds - nox level 1-13 | $64,760 |
UEI VUPMQXUJKJP3 Cpt-1 adhesive | $36,120 |
UEI HGGTJXCYXAQ3 Mnx_bas material muo_1 | $34,933 |
UEI Z9K7Y5KB5V78 Irrigation materials zone 1 | $75,341 |
UEI FTVZTM9W2ZP9 Replacement order for hydrotech monolithic membrane 6125 | $30,821 |
UEI QS69N48FG4K3 Postal equipment specialties: mail sorting table for room | $63,511 |
UEI JJNBJ1NFDY39 Keywatchers per ifc drawings | $28,368 |
UEI FGKEVGYL3ZF3 Ulan cisco | $284,439 |
UEI UW1DSE3MDK66 Mailboxes and mail drop for nox room 5015 | $37,485 |
UEI M1LWL4M66TY7 Crack isolation membrane, stone, tile and terrazzo flooring | $45,954 |
UEI JXWFA5LRWLQ5 Msgr bedroom surface mount fixtures | $142,650 |
UEI MC2KK4ZC2NV3 232500 hvac water treatment - construction filters consumables - chw_hw | $5,636 |
UEI Q2M4FYALZJ89 Hdvs cisco | $50,286 |
UEI XYLHQNEJ8VG5 Wtp room copper pipe muo | $48,786 |
UEI XNLTZUQK7LY5 Fire extinguishers | $83,127 |
UEI HJMHUKJEEYW8 Yb/yb1 iguzzini fixtures | $102,900 |
UEI EJM7EJBMMMD6 Mnx - mech room 2m02 - level 2 - gw and dw plumbing piping - fittings - valves | $36,483 |
UEI HJMHUKJEEYW8 Type v linear fixtures | $85,265 |
UEI UT2VJ2AWMTA5 Cons. intercom system | $290,948 |
UEI WMGUZG5KQYG5 Stolen cables make up order | $38,526 |
UEI WMGUZG5KQYG5 Branch circuits for external lighting & eu | $59,420 |
UEI CW52DR9J9DY4 Smoke label doors for elevator lobby | $128,041 |
UEI CW52DR9J9DY4 Replacement glazing order #2 | $47,070 |
UEI GYBQGJW61FF8 Additional wall & channel molding for gypsum ceiling system | $44,252 |
UEI DSQLL3J5WS28 Rubber anti-static flooring and adhesive (rfr-1) | $155,464 |
UEI S26TW5MQJK67 Facade xv flood lights | $40,545 |
UEI L4QQJ4BH2726 Stolen feeders replacement | $52,056 |
UEI SPDPQLK15TN4 Axis type d1, d-g, av fixtures | $44,624 |
UEI EJM7EJBMMMD6 Mcmpd storm drainage piping remaining materials | $49,081 |
UEI KNF8R2Q4NML5 Mesh trays from lvl11 to lvl 14 + msgr + utl sublevel | $48,098 |
UEI WXHMYKFRNLP4 Mcmpd irrigation pump skid | $69,069 |
UEI T3QFUU2JTAD3 Fiberglass reinforced planter box for p01 sunscreen | $120,186 |
UEI HJ3FXF8H4CH5 221116 msd domestic water ag fittings & valves | $30,265 |
UEI LG45V8Z879C8 Msd plumbing specialties level all levels | $36,818 |
UEI EJM7EJBMMMD6 Stormwater lift stations remaining materials | $33,083 |
UEI DXW7PFC9J1M1 Duct insulation fsk tapes_mnx_mmgr_mu for all levels | $52,752 |
UEI LYHVFTUFJMM6 Complementary order per field usage rate. wall tiles and bases adhesive | $36,063 |
UEI C1T6MAJV84M5 Type d axis linears | $149,520 |
UEI CYLHX7Z1D1X1 7 axis linears | $176,080 |
UEI S26TW5MQJK67 Msgr type d linear fixtures | $51,390 |
UEI S26TW5MQJK67 D-g and d-b axis linears | $44,710 |
UEI TCNFGPFKRBR6 Raceway and boxes - july 2025 | $48,365 |
UEI L4QQJ4BH2726 Cmpd-branch circuits wires | $62,235 |
UEI WUVTD5ZNG1N5 Active road barrier systems- electric wedge barriers | $441,755 |