Back to contract actions
PIID80GSFC24CA050DEFINITIVE CONTRACT
THE REGENTS OF THE UNIVERSITY OF COLORADO
UEI: SPVKK1RC2MZ3
$5,881,000.00
Awarding Agency
Sub-Agency
National Aeronautics and Space Administration
Start Date
August 29, 2024
End Date
February 1, 2027
NAICS
PSC
AR11
Description
DYNAMICAL NEUTRAL ATMOSPHERE-IONOSPHERE COUPLING-X (DAPHNE) PHASE A
Transactions (8)
| Date | Mod # | Obligation |
|---|---|---|
| Aug 29, 2024 | 0 | +$1,881,000 |
| Mar 27, 2025 | P00001 | +$0 |
| Apr 30, 2025 | P00002 | +$0 |
| Dec 16, 2025 | P00003 | +$0 |
| Mar 19, 2026 | P00004 | +$0 |
| May 11, 2026 | P00005 | +$0 |
| Jul 13, 2026 | P00006 | +$0 |
| Aug 28, 2026 | P00007 | +$4,000,000 |
Subcontractors 1$950,000 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI C8ZLJ61YJ528 This statement of work describes the scope of work to be performed by bae systems space & mission systems, inc. (bae sms), in collaboration with lasp. the work described in the sow will be performed at the direction of and on behalf of the daphne project principal investigator (pi), aimee merkel, at the university of colorado, lasp.
bae sms shall perform spacecraft systems engineering to support the daphne project activities and csr generation. the systems engineering effort shall include analyses of technical requirements, functional and performance allocation of derived requirements, traceability, verification, definition and maintenance of all interfaces as required. the engineering tasks for bae sms are:
1.
general support (meetings and presentations)
a.
1 hour weekly meeting with bae sms and lasp leadership teams
b.
4 hours of monthly tims as required to coordinate s/c to payload interfaces, mission traceability requirements, and payload/s/c i&t trades
2.
s/c systems engineering
a.
support development of mtm and level 2 requirements
b.
revise spacecraft mel and develop heritage appendix inputs to be consistent with the maturity required by the csr
c.
support development of s/c to payload icd requirements and trades
d.
mitigate major and minor weaknesses from step 1
3.
s/c inputs to csr
a.
detailed s/c and subsystem block diagrams required by csr requirements
b.
final csr inputs for s/c views and cad
c.
all subsystem sections of flight system subsection of section f to meet the csr requirements
d.
electric propulsion specific requirements of the csr
e.
telecommunications-specific appendices and inputs to the csr
f.
support and provide inputs to the orbital debris assessment report (odar) and preliminary end of mission plan (eomp)
g.
provide input to the communication design data plan
h.
provide input to the project protection plan
4.
s/c and observatory i&t plans and inputs for csr
a.
s/c and observatory i&t flow charts required by csr
b.
including s/c inputs to storage plan
c.
inputs to s/c portions of the program schedule
5.
launch ops inputs for csr
a.
inputs to rideshare accommodations worksheet and related materials
b.
including s/c inputs to launch flexibility appendix | $950,000 |