Transactions (13)
| Date | Mod # | Obligation |
|---|---|---|
| Apr 2, 2024 | 0 | +$2,516,166 |
| Sep 11, 2024 | P00001 | +$1,680,000 |
| Dec 18, 2024 | P00002 | +$2,545,500 |
| Feb 24, 2025 | P00003 | +$1,021,618 |
| Jun 18, 2025 | P00004 | +$2,368,268 |
| Sep 10, 2025 | P00005 | +$783,459 |
| Dec 15, 2025 | P00006 | +$1,671,000 |
| Dec 18, 2025 | P00007 | +$56,949 |
| Jan 27, 2026 | P00008 | +$1,145,115 |
| Mar 16, 2026 | P00009 | +$200,001 |
| Apr 24, 2026 | P00010 | +$1,108,148 |
| Jun 2, 2026 | P00011 | +$90,000 |
| Jun 29, 2026 | P00012 | +$229,000 |
Subcontractors 5$1,752,375 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI RN4PMJKEMSX6 The primary objective is to demonstrate the fabrication of a crystalline-core, glass-glass double-clad fiber. the performer shall develop a high-index capillary fabrication process to integrate high-index inner and compatible outer claddings into a single complex, multi-glass capillary structure. this capillary will be applied as a post cladding over government-furnished crystalline cores through a vacuum-assisted thermal sleeving process to achieve high-quality, low-loss interfaces. additionally, the performer shall evaluate and apply high-temperature polymer coatings to the resulting double-clad single-crystal fibers. | $367,577 |
UEI DLWBSLWAJWR1 The aim is to create cladding inside yag scfs using femtosecond laser inscription. the laser
inscription method and parameters, scan strategy, beam shaping and imaging, and image
processing for fiber positioning will be developed. the fabricated scf after cladding inscription
will be characterized for cladding morphology, mode profile, propagation loss, and polarization
sensitivity.
deliverables:
1. inscribed fibers
2. monthly invoice
3. monthly status update
4. annual technical report
5. final technical report due at end of period of performance | $199,955 |
UEI K39ENMXNLA73 This subcontract supports the development, optimization, fabrication, and delivery of nanostructured optical (nso) surfaces on representative nonlinear optical materials, including zinc germanium phosphide (zgp) and/or cadmium silicon phosphide (csp), for infrared anti-reflection (ar) performance improvement. | $749,952 |
UEI NPM2J7MSCF61 The subcontractor shall design, fabricate, and deliver anti-resonant hollow core fiber (arhcf) for evaluation as a flexible laser delivery solution in the 3–5 μm mid-wave infrared (mwir) transmission window. the effort will support investigation of arhcf performance for high-power laser transmission, including reduced bend loss and operation with both air- and argon-filled cores. | $300,000 |
UEI SRG2J1WS9X63 The subcontractor shall develop and demonstrate fabrication protocols for complex-shape metasurfaces designed by AFRL and deliver at least three (3) one-inch square fabricated devices. work includes process development, mask design, lithography optimization, etch development, backfill and planarization evaluation, fabrication on afrl-provided wafers, dicing, delivery, and program management/reporting. | $134,891 |