PIIDFA252124F0325DELIVERY ORDER
$59,445,837.00
Awarding Agency
Sub-Agency
Department of the Air Force
Start Date
August 16, 2024
End Date
May 26, 2028
NAICS
PSC
5840

Description

INSTRUMENTATION RANGE SUPPORT PROGRAM III

Transactions (6)
DateMod #Obligation
Aug 15, 20240+$38,849,643
Nov 26, 2024P00001+$1,494,739
Mar 12, 2025P00002+$0
Jul 16, 2025P00003+$1,209,535
Sep 26, 2025P00004+$17,891,920
Jun 17, 2026P00005+$0
Subcontractors 38$11,542,448 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI LA7DXKNMNCD3
Waveguide, wr112
$42,480
UEI C2JTAUL58AN9
Sr-106 (33m) mobile tower, options
$178,642
UEI FMJTG9XMH7H6
Borsight mount
$3,000
UEI CQLFMKPGRUQ3
Microwave signal generator
$83,592
UEI GN82WS7LRJ77
Waveguide bulkhead, wr112, cover/choke,waveguide bulkhead, wr112, choke/choke,waveguide, wr112
$47,010
UEI HK8XKB7L7MF6
Pan-tilt unit, d48 e-series, top bracket, pl01,tariff t2.0 (direct billable use account 515-4-010-1)
$45,282
UEI YZ22EFS1S6X7
Circulator, four port, high power, x-band
$56,400
UEI SUNWDXTKCZ33
Attenuator, varialable, 7.9ghz to 12.7 ghz, 30db,coaxial isolator
$70,080
UEI Q7V9NFM353J4
Monitor, retrofit resistive touchscreen
$110,472
UEI PL89EHJU9KE4
Down converter, 8.5-9.6 ghz,nrem customer source inspection
$91,641
UEI XULQBJ7NB2K8
Rack, 42u, 42 in deep, left,3-bay rack,rack, 42u, 42 in deep,rack, 42u, 42 in deep, right,custom paint set up
$91,486
UEI ZGD2UYAN5WC9
Rotary joint, single channel wr-112, 8 channel forj,rotary joint, single channel wr-112,fiber cable assembly iaw bae mark up drawing 12-547-200
$259,910
UEI FMJTG9XMH7H6
Camera, visible light, 2000mm, environmental,adapter plate,test cable, 12 ft long,house design modification,freight
$4,760
UEI DSC6J71L8HY4
Ir camera, flir rs8513hs, 120-1200mm, f5.0.
$499,130
UEI K5WVCD4GUK41
Slide, lock open, front release, 22 in
$40,849
UEI FMJTG9XMH7H6
Borsight mount
$66,000
UEI D9P7CUAJBG55
Tr limiter
$198,000
UEI XZD2ZB1SN2R1
Fiber-optic transmitter, 50mhz to 18ghz
$40,604
UEI CWTCAAVQP8M1
Do not invoice - xband 8 ft antenna scd8612965 rev 1,negative line for tracking milestone payments,milestone payment #1 - 10% engineering planning activities,milestone payment #2 - 10% kick-off - engineering planning,milestone payment #3 - 20% preliminary design review (pdr),milestone payment #4 - 20% critical design review (cdr),milestone payment #5 - 10% upon delivery of unit 1 ,milestone payment #6 - 10% upon delivery of unit 2 ,milestone payment #7 - 10% upon delivery of unit 3 ,milestone payment #8 - 10% upon delivery of unit 4 ,do not invoice - 2.44 meter (8 foot) x-band antenna qty 2,milestone payment #1 - 40% all long-lead orders placed,milestone payment #2 - 40% production commenced,milestone payment #3 - 10% unit 5 shipping,milestone payment #4 - 10% unit 6 shipping
$979,184
UEI XZD2ZB1SN2R1
Lna, x-band
$41,970
UEI C7CAL3M5UXL9
Video processing board, dual input,packing and shipping
$89,175
UEI E4KGA1HAQ8U5
Do not invoice - iaw scd8612979 pedestal,negative line for tracking milestone payments,milestone payment #1 - 25% order long lead materials (8 week,milestone payment #2 - 25% begin fabrication (20 weeks prior,milestone payment #3 - 25% begin assembly (12 weeks prior t,milestone payment #4 - 6.25% delivery of system #1 ,milestone payment #5 - 6.25% delivery of system #2,milestone payment #6 - 6.25% delivery of system #3,milestone payment #7 - 6.25% delivery of system #4,additional line to amend po 41-7083115 revision 1,do not invoice - scd, two axes tracking radar pedestal,milestone payment #3 - 20% begin assembly (12 weeks prior t,milestone payment #4 - 15% delivery of system #1 ,milestone payment #5 - 15% delivery of system #2
$2,664,052
UEI CSRLHJ674HG5
Model 337x transmitter,milestone payment #1 - 20% of order total,milestone payment #2 - 25% of order total,milestone payment #3 - 30% of order total,milestone payment #4 - remaining 25% of order,negative line for tracking milestone payment,nre,shipping cost,additional line to amend po 41-7082051,250 kw x-band transmitter - scd8612968,milestone payment #6 - 20% of added cost for additional 2 tx,milestone payment #7 - 25% of added cost for additional 2 tx,milestone payment #8 - 30% of added cost for additional 2 tx,milestone payment #9 - remaining 25% upon delivery,negative line item for tracking milestone payments ,shipping cost for units 5 & 6
$738,789
UEI NX3CWRH5M7Z1
Rf synthesizer, serial, low power,first article insp fai-zfr-9650-01
$59,864
UEI TLP2S3X94GF7
Radar pedestal transporter,milestone payment #1: pdr/cdr (10%),milestone payment #2: chassis complete unit 1 (20%): ,milestone payment #3: chassis complete unit 2 (20%): ,milestone payment #4: chassis complete unit 3 (20%): ,milestone payment #5: chassis complete unit 4 (20%): ,milestone payment #6: paint complete (20%) unit 1,milestone payment #7: paint complete (20%) unit 2,milestone payment #8: paint complete (20%) unit 3,milestone payment #9: paint complete (20%) unit 4,milestone payment #10:unit 1 fat(factory acceptance testing),milestone payment #11:unit 2 fat(factory acceptance testing),milestone payment #12:unit 3 fat(factory acceptance testing),milestone payment #13:unit 4 fat(factory acceptance testing),32/34 ft. mobile radar shelter,milestone payment #14: pdr/cdr (10%),milestone payment #15: framing complete unit 1 (20%),milestone payment #16: framing complete unit 2 (20%),milestone payment #17: framing complete unit 3 (20%),milestone payment 18: framing complete unit 4 (20%),milestone payment #19: paint complete unit 1 (20%),milestone payment #20: paint complete unit 2 (20%),milestone payment #21: paint complete unit 3 (20%),milestone payment #22: paint complete unit 4 (20%),milestone payment #23: unit 1 fat (factory acceptance testin,milestone payment #24: unit 2 fat (factory acceptance testin,milestone payment #25: unit 3 fat (factory acceptance testin,milestone payment #26: unit 4 fat (factory acceptance testin,fea analysis per transporter,negative line for tracking milestone payments,shielded effectiveness testing,milestone payment chassis complete unit #5 (25%),milestone payment chassis complete unit #6 (25%),milestone payment paint complete unit #5 (25%),milestone payment paint complete unit #6 (25%),milestone payment unit #5 fat (50%),milestone payment unit #6 fat (50%),milestone payment framing complete unit #5 (25%),milestone payment framing complete unit #6 (25%),negative offset line for milestone payments
$1,799,046
UEI MNV2LLKGX9B1
Sr-106 (33m) mobile tower, options,freight
$340,268
UEI F4FLM3NP2N46
Microwave signal generator
$167,029
UEI H7JQK8XMJUP7
Im2400 dual output compressor/dehydrator
$43,785
UEI DSC6J71L8HY4
Ir camera, flir rs8513hs, 120-1200mm, f5.0.
$975,000
UEI XULQBJ7NB2K8
Rack, 42u, 42 in deep,rack, 42u, 42 in deep, left,rack, 42u, 42 in deep, right,3-bay rack,custom set up fee
$181,064
UEI NX3CWRH5M7Z1
Frequency synthesizer, rf, 8450 mhz - 9650 mhz, +19dbm,first article insp fai-zfr-9650-01
$123,728
UEI TLP2S3X94GF7
Radar pedestal transporter,milestone payment #1: pdr/cdr (10%),milestone payment #2: chassis complete unit 1 (20%): ,milestone payment #3: chassis complete unit 2 (20%): ,milestone payment #4: chassis complete unit 3 (20%): ,milestone payment #5: chassis complete unit 4 (20%): ,milestone payment #6: paint complete (20%) unit 1,milestone payment #7: paint complete (20%) unit 2,milestone payment #8: paint complete (20%) unit 3,milestone payment #9: paint complete (20%) unit 4,milestone payment #10:unit 1 fat(factory acceptance testing),milestone payment #11:unit 2 fat(factory acceptance testing),milestone payment #12:unit 3 fat(factory acceptance testing),milestone payment #13:unit 4 fat(factory acceptance testing),32/34 ft. mobile radar shelter,milestone payment #14: pdr/cdr (10%),milestone payment #15: framing complete unit 1 (20%),milestone payment #16: framing complete unit 2 (20%),milestone payment #17: framing complete unit 3 (20%),milestone payment 18: framing complete unit 4 (20%),milestone payment #19: paint complete unit 1 (20%),milestone payment #20: paint complete unit 2 (20%),milestone payment #21: paint complete unit 3 (20%),milestone payment #22: paint complete unit 4 (20%),milestone payment #23: unit 1 fat (factory acceptance testin,milestone payment #24: unit 2 fat (factory acceptance testin,milestone payment #25: unit 3 fat (factory acceptance testin,milestone payment #26: unit 4 fat (factory acceptance testin,fea analysis per transporter,negative line for tracking milestone payments,shielded effectiveness testing
$840,670
UEI N5QTMGMHBRS7
Scd, rack mount pc,scd, rackmount pc
$258,612
UEI PWFMH2ZUAWZ5
Amplifier, level control, x-band,non-recurring charge
$37,500
UEI NSDHS6ECR633
Timer/counter/analyzer, 300mhz/20ghz, 50 ps, std timebase,rackmount kit, 2u
$69,473
UEI XZD2ZB1SN2R1
Fiber-optic transmitter, 50mhz to 18ghz,fiber optic receiver, rf,rack mount, 19 inch, fiber enclosure
$111,880
UEI ZGD2UYAN5WC9
Fiber cable assembly iaw bae mark up drawing 12-547-200
$56,520
UEI NB5BCPJ7ENG9
Model 337x transmitter,milestone payment #1 - 20% of order total,milestone payment #2 - 25% of order total,milestone payment #3 - 30% of order total,milestone payment #4 - remaining 25% of order,negative line for tracking milestone payment,nre,shipping cost,additional line to amend po 41-7082051
$35,500