| Subcontractor | Amount |
|---|---|
UEI PA5AQJLCP751 1.1 project environmental submittals: prior to mobilization and any onsite activities, mec inc., will prepare and submit a draft abatement/demolition plans as required by cal osha or the em-385-1-1 manual, approved by the buyer, also with all federal, state and local regulations.
clin-01, selective soft demolition: removal and disposal of existing raised floor (approx. 1,372 sq.ft.) from rooms 209a, 209b and 209c, demo of carpet with black mastic (approx. 1,170 sq. ft.) located on rooms 209d, 209e, 209f, 209g, 209h and 209i. leaving area ready for new installation or lay-out. soft demo of internal door/frame from rooms 209a and 209b. soft demo security doors from rooms 209a and 209b from leaving area ready for new installation on vsfb building 10577. total soft demo (approx. 1,372 sq. ft. flooring, 5 door/frame units) 1 mobilization.
$ 33,530.00
pre-renovation asbestos and lead survey: conduct a comprehensive inspection for suspicious, accessible acm asbesto containing materials, (drywall/joint compound, flooring materials, ceiling finishes and insulation on bldg 10577 room 209
$ 2,250.00
clin-02, hazardous material asbestos abatement: removal and disposal of existing class ii non-friable asbestos containing materials (acm): abatement of acm flooring, carpet with black mastic (approx. 1,170 sq. ft.) located on from rooms 209d, 209e, 209f, 209g, 209h and 209i. abatement will be performed within a negative pressure enclosure (npe), mastic will be removed using low-odor non-hazardous soy-based mastic remover and re-cleaned with environ wash 805, leaving area ready for new installation on vsfb building 10577. total acm abate (approx. 1,170 sq. ft.) 1 mobilization.
$ 15,350.00
clin-03, selective soft demolition: removal and disposal of existing ceiling system, to include ceiling grid, ceiling registers and ceiling tiles on the interior area of room 209 (approx. 2,543 sq.ft.) leaving area ready for new installation of ceiling lights and ceiling system grid on vandenberg sfb building 10577 room 209.
$ 9,640.00
abatement/demo will be performed under a npe area with 2000 nam's exhausting to the outside of the building, hepa vacuum and cdph approved workers in ppe and air samples by a competent person. all areas will be properly marked and protected during abatement activities. | $15,530 |
UEI RMMVP3GTPQM9 Labor and material to install suspended acoustical ceilings | $26,082 |
UEI NMJWEKNZHU15 In accordance with statement of objectives (soo) released with amendment 03, base excellence standards, saber master specifications, drawings, rfi’s and all other contract documents; provide labor, material and equipment necessary for the completion of the items set forth below:
• furnish & install shaw visible 5t1002 color emit
• furnish & install 4” nylon top bound carpet cove base. color (adrift) | $126,473 |
UEI MKRBFSUZKW63 Clin 0001
1.
safe off and remove red/blue lights circuits in rooms 209d. reinstallation not required.
2.
safe off power circuits for receptacles to be removed in project area.
3.
install convenience receptacles along walls in new room 209j and 209k as required by nec and ufc.
4.
existing telecom to be reworked and rerouted as applicable.
5.
perform terminations and functional testing of newly installed power and telecom.
clin 0003
1.
remove and replace with new led light fixtures in room 209e. fixture ceiling wires provided and installed by others.
2.
coordinate with end user to relocate light switch in room 209e.
3.
perform functional test of newly installed lighting. | $126,473 |