PIIDN4002726F0005DELIVERY ORDER
$1,441,777.49
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
December 29, 2025
End Date
January 29, 2026
NAICS
PSC
J998
Transactions (9)
DateMod #Obligation
Nov 25, 20250+$1,168,642
Dec 29, 2025P00001+$66,193
Dec 31, 2025P00002+$50,478
Jan 13, 2026P00003+$77,119
Jan 23, 2026P00005+$3,472
Jan 23, 2026P00004+$13,925
Jan 26, 2026P00006+$64,394
Feb 2, 2026P00007+$16,477
Feb 13, 2026P00008-$18,922
Subcontractors 5$475,823 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI YNJNTZWVC3H6
To accomplish the requirements of work item: 721-31-001 (3594-020) and 721-31-002 ; bae to accomplish to all applicable navsea standard items for spaces listed in 1.2 including exceptions & inclusions as stated in the attached quote: 10202025rrg dated october 20, 2025 iaw ssp; serm 015-26 onboard the uss lassen (ddg-82) cmav located at naval station mayport. pop: 12/29/2025 - 01/30/2025 and follow the ships production schedule. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: ron thomas jr 904-574-3761 or rthomasjr@ecrfab.com.
$41,688
UEI DDNELLWJ1DB1
*co1* accomplish the requirements of work item: 123-00-001 rcc 2n tank and void clean and pump; accomplish. amc to accomplish paragraphs 3.1-3.1.1,3.1.3-3.2.4, to all applicable navsea standard items for spaces listed in 1.2 including exceptions & inclusions as stated in the attached quote dated december 10, 2025 iaw ssp; serm 015-26 onboard the uss lassen (ddg-82) cmav located at naval station mayport. pop: 12/29/2025 - 01/30/2026 and follow the ships production schedule. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: ron thomas jr. 904-574-3761 or rthomasjr@ecrfab.com. amc is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work.
$53,018
UEI XJAHB2WU39Q1
To accomplish the requirements of work item: 150-11-001 04 level deck bulkhead and bulwark; repair. axs to provide, erect and remove nte (1) 7x7x12 scaffold tower; 150-11-002 director equipment room number 3 bulkhead plating; repair. axs to provide, erect and remove nte (1) 5x5x6 scaffold tower; 167-11-001 main mast scuttle; repair and preserve. axs to provide, erect and remove nte (1) 3x3 tube and clamp hanging scaffold built in mast trunk to access 010 scuttle; 167-11-002 hatch replacement; accomplish. axs to provide, erect and remove nte (1) 3x3 tube and clamp hanging scaffold on underside of hatch; 259-10-001 aft mixing room platform; repair. axs to provide, erect and remove nte (1) 7x7x14 scaffold tower; 320-11-001 sonar dome access trunk receptacle install; accomplish. axs to provide, erect and remove nte (1) 3x3 tube and clamp hanging scaffold as designated by prime; 472-11-001 passive counter measure system replacement; accomplish: axs to provide, erect and remove nte (2) 5x5x12 scaffold towers; 512-11-002 supply ventilation ducting replacement; accomplish. axs to provide, erect and remove nte (1) 8x8x16 rolling tower; 581-11-001 anchor windlass stroke control above and below deck replacement; accomplish. axs to provide, erect and remove nte (1) 5x5x6 scaffold tower; 612-11-001 stanchion pedestal replacement; accomplish. axs to provide, erect and remove nte (2) 7x7x12 scaffold towers; 622-11-001 06 level deck grating and support frame replacement; accomplish. axs to provide, erect and remove nte (1) 5x5x12 scaffold towers; 633-11-001 zinc anode replacement; accomplish. axs to provide, erect and remove nte (1) 4x4x8 scaffold towers as designated by prime; 721-31-001 forward vertical launch system (vls), mk 41 launcher trunnion cell hatch and uptake hatch replacement; accomplish. axs to provide, erect and remove nte (1) 34x34x12 fully encapsulated scaffold structure; 721-31-002 aft vertical launch system (vls), mk 41 launcher cell hatch. axs to provide, erect and remove nte (1) 34x34x12 fully encapsulated scaffold structure; and 91-11-001 antenna array temporary staging for use by ship's force; provide. axs to provide, erect and remove nte (4) 16x4x26 scaffold towers with multiple deck levels to access entire array. scaffolding will be fully encapsulated with shrink wrap containment onboard the uss lassen (ddg-82) cmav located at naval station mayport. see attached quote: 2051 for reference and exceptions. pop: 12/29/2025 - 01/30/2026 and follow the ships production schedule. all fy-26 navsea standard items apply including local standard items are invoked. ecr poc: ron thomas jr. 904-574-3761 or rthomasjr@ecrfab.com. axs is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work.
$82,877
UEI Q8S4HKFTVCC9
To accomplish the requirements of work item: 593-11-001 aft vacuum, collection, holding and transfer (vcht) piping system; chemical clean, qed to accomplish paragraphs 3.1 through 3.5, to all applicable navsea standard items for spaces listed in 1.2 including exceptions & inclusions as stated in the attached quote dated october 14, 2025 iaw ssp; serm 015-26 onboard the uss lassen (ddg-82) cmav (3594-016) located at naval station mayport. pop: 12/29/2025 - 01/30/2026 and follow the ships production schedule. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: ron thomas jr. 904-574-3761 or rthomasjr@ecrfab.com. qed is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work.
$48,803
UEI YNJNTZWVC3H6
Accomplish the requirements of work item: 721-31-001 (3594-020) forward vertical launch system (vls), mk 41 launcher trunnion cell hatch and uptake hatch replacement accomplish; bae to accomplish paragraphs 3.1 through 3.3; and work item: 721-31-002 (3594-021) aft vertical launch system (vls), mk 41 launcher cell hatch replacement accomplish; bae to accomplish paragraphs 3.2 through 3.3 to all applicable navsea standard items for spaces listed in 1.2 including exceptions & inclusions as stated in the attached quote: 10202025rrg dated october 20, 2025 iaw ssp; serm 015-26 onboard the uss lassen (ddg-82) cmav located at naval station mayport. pop: 12/29/2025 - 01/30/2025 and follow the ships production schedule. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: ron thomas jr 904-574-3761 or rthomasjr@ecrfab.com.
$249,437