Awarding Agency
Sub-Agency
Department of the Navy
Start Date
September 27, 2024
End Date
June 10, 2029
NAICS
PSC
Y1JZ
Description
DESIGN-BID-BUILD BUILDING CEP-201 RENOVATION, NAVAL STATION NORFOLK, NORFOLK, VIRGINIA
Transactions (7)
| Date | Mod # | Obligation |
|---|---|---|
| Sep 27, 2024 | 0 | +$46,646,740 |
| Feb 25, 2025 | P00001 | +$0 |
| Aug 1, 2025 | P00002 | +$17,701,680 |
| Sep 15, 2025 | P00003 | +$0 |
| Sep 23, 2025 | P00004 | +$5,641 |
| Apr 6, 2026 | P00005 | +$151,136 |
| May 18, 2026 | P00006 | +$17,867,020 |
Subcontractors 39$21,031,952 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI ZAN5HNAUQQX5 Asphalt paving | $1,001,437 |
UEI WE3GES317KN9 Instrumentation and controls for hvac | $581,676 |
UEI F8S1BF56LFY9 Testing & inspections | $169,615 |
UEI GL4ZD2F69YB2 Supply materials - storm drain, sanitary sewer, water lines | $113,454 |
UEI K8NSWN9BL1F8 Lighted cable railing system - stainless steel cable infill & integrated led light handrail systems | $126,459 |
UEI D7V1UXVRL2K9 Duct air leakage testing (dalt) & testing, adjusting, and balancing (tab) for all mechanical systems, air distribution systems & water distribution systems | $54,650 |
UEI DKUVY6CGADE9 Exterior signage & markings - parking lot/crosswalks | $16,220 |
UEI UBMJNJQ7S465 Inspection & testing of three-phase pad-mounted transformer, main distribution switchboards, underground electrical medium voltage cables & electricity metering | $17,870 |
UEI JLQ8KQ6U8K91 Weigh-in motion scale system installation | $18,400 |
UEI X3KUHM7J4K53 All structural steel | $3,891,828 |
UEI PMAARXGUKS57 Place & finish curb & gutter | $135,584 |
UEI Y3MPQ9CYB9D8 Firestopping | $66,250 |
UEI Q59YJK27AV44 Heating, ventilation, and air conditioning (hvac) install | $559,200 |
UEI LCE3FG2NVP86 Fire suppression system | $402,415 |
UEI ZCT4NZK975H7 Roof demolition | $186,527 |
UEI MA5US45LLQQ7 Providing weigh in motion scale | $69,707 |
UEI JUZ2NEPLR6U1 Storm drain piping cleaning & cctv | $3,324 |
UEI MJ4DSPQPMV71 Supply only - low pressure water heating boilers & terminal heating units | $55,839 |
UEI CNBEZF7EVTH4 Glazing | $332,070 |
UEI QZ6DHN471K78 Loading dock equipment, dock doors, overhead coiling doors & grilles, sectional doors. | $1,804,175 |
UEI N2H6YLMHS5J9 Roof systems | $4,008,062 |
UEI GDDHMXL636U5 Saw cutting and coring of concrete | $10,000 |
UEI QR5UFMBF93M8 Landscaping | $42,400 |
UEI PQ3DK68Q2BJ3 Hvac air distribution equipment | $44,928 |
UEI T8LAX8MHJ176 All painting & coatings | $656,065 |
UEI KCLJLWU35ME7 All cold-formed metal framing, rough carpentry blocking, insulation, drywall & acoustical ceilings. | $1,908,502 |
UEI CGYPFLJBJV58 Window treatment blinds | $3,600 |
UEI EQSVNVXYLS95 Hvac air distribution equipment | $48,928 |
UEI T2X8B797QGK3 Site survey services | $26,385 |
UEI J3Z5TJXCENE3 Furnish - hvac air distribution | $12,910 |
UEI H8RGPKABML13 All hard tile, carpet & resilient flooring | $317,147 |
UEI HRBEHP6JSUF7 Install all cabinets, countertops, windowsills and stainless-steel brackets, toilet & bath compartments, toilet & bath accessories, corner guards, fire extinguisher brackets & fire extinguisher cabinets. | $224,970 |
UEI XBEGLZWSUEH6 Laborers - site clean-up, debris removal, materials moving, demolition & duties as assigned | $5,000 |
UEI U4T6EFKQF563 Supply - doors, frames & hardware | $252,671 |
UEI DHPLRDCTDLV1 Masonry & masonry reinforcing | $847,761 |
UEI CJRTL4WPR9T5 All structural & site concrete | $2,671,503 |
UEI PXD1HPCHBPW8 Fencing and gates | $54,915 |
UEI MZN3GNCNXW95 Storm drain piping cleaning & cctv | $20,730 |
UEI KKG4GM2V15L9 Moving & storage | $268,775 |