PIIDN4008525F2544DELIVERY ORDER

STAMPEDE VENTURES, INC.

UEI: WT4BZHCLS8X7
$22,570,567.11
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
December 6, 2024
End Date
August 12, 2030
NAICS
PSC
Z2JZ
Transactions (1)
DateMod #Obligation
Dec 9, 20240+$22,570,567
Subcontractors 4$8,558,970 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI QNTQYXWA7GK4
• electrical support per the drawings and spec. • disconnect and rework for each exhaust fan called out in the drawings. fan supplied by others. • reinstall fallen, disconnected ground line and reattach to grounding system (note# 3 page e-212). • electrical conduits located at the windows, will determine if they are active or abandoned. remove or temporarily disconnect so work can be done then reinstall as needed. • existing light fixture mounted to overhang to be removed and conduit removed back to nearest j-box (note# 5 page e-252). • disconnect existing mechanical and remove conduit back to the source (note # 4 page e-253). • existing light fixture mounted to overhang to be removed and conduit removed back to nearest j-box (note# 4 page e-261). • existing light fixture mounted to overhang to be removed and conduit removed back to nearest j-box (note# 5 page e-262). • disconnect existing mechanical and remove conduit back to the source (note # 5 page e-294). • does not include lighting protection.
$195,421
UEI GQYKMLB7EK68
Perform asbestos abatement and selective dmolition. remove existing window system (468) remove deteriorated exterior sealant and back rod (14,400lf)
$815,265
UEI CNBEZF7EVTH4
• the windows system includes subsills, head/jamb receptors, muntin grids, and mullions necessary for a watertight installation. • the windows have locking cam handles, keyed limit stops, and aluminum mesh screens. • aluminum louvers are included where indicated on the drawings. • wood blocking with self-adhering membrane and break metal per the details on the architectural drawings. • sealants @ 2x the frame perimeter. • all fasteners and shims. we will field measure all openings. • includes shop drawings, freight, and all taxes.
$4,601,884
UEI EJLFMJ256MV5
• mobilization of supervision, labor, materials and equipment. concrete spec section 09 90 00 • tape off and protect as needed. • handtool all loose coating off walls with scraping tools. tightly adhered sound coatings to be left on substrate and lightly sanded for intercoat adhesion of topcoat. • apply spot primer of loxon conditioner @ 200 – 300 sf/gallon to bare new and existing concrete. • apply primer of duration k-33 acrylic satin @ 2.0-3.0 mils dft. mpi #15 • apply topcoat of duration k-33 acrylic satin @ 2.0-3.0 mils dft. mpi#15 brick and 12” overlap on concrete coating spec section 07 19 00 • apply loxon 40% silane water repellent @ 100-150 sf/gallon. mpi#117 • project close out inspection and documentation.
$2,946,400