| Date | Mod # | Obligation |
|---|---|---|
| Dec 9, 2024 | 0 | +$22,570,567 |
Subcontractors 4$8,558,970 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI QNTQYXWA7GK4 • electrical support per the drawings and spec.
• disconnect and rework for each exhaust fan called out in the drawings. fan supplied by others.
• reinstall fallen, disconnected ground line and reattach to grounding system (note# 3 page e-212).
• electrical conduits located at the windows, will determine if they are active or abandoned. remove or temporarily disconnect so work can be done then reinstall as needed.
• existing light fixture mounted to overhang to be removed and conduit removed back to nearest j-box (note# 5 page e-252).
• disconnect existing mechanical and remove conduit back to the source (note # 4 page e-253).
• existing light fixture mounted to overhang to be removed and conduit removed back to nearest j-box (note# 4 page e-261).
• existing light fixture mounted to overhang to be removed and conduit removed back to nearest j-box (note# 5 page e-262).
• disconnect existing mechanical and remove conduit back to the source (note # 5 page e-294).
• does not include lighting protection. | $195,421 |
UEI GQYKMLB7EK68 Perform asbestos abatement and selective dmolition.
remove existing window system (468)
remove deteriorated exterior sealant and back rod (14,400lf) | $815,265 |
UEI CNBEZF7EVTH4 • the windows system includes subsills, head/jamb receptors, muntin grids, and mullions necessary for a watertight installation.
• the windows have locking cam handles, keyed limit stops, and aluminum mesh screens.
• aluminum louvers are included where indicated on the drawings.
• wood blocking with self-adhering membrane and break metal per the details on the architectural drawings.
• sealants @ 2x the frame perimeter.
• all fasteners and shims. we will field measure all openings.
• includes shop drawings, freight, and all taxes. | $4,601,884 |
UEI EJLFMJ256MV5 • mobilization of supervision, labor, materials and equipment.
concrete spec section 09 90 00
• tape off and protect as needed.
• handtool all loose coating off walls with scraping tools. tightly adhered sound coatings to be left on substrate and lightly sanded for intercoat adhesion of topcoat.
• apply spot primer of loxon conditioner @ 200 – 300 sf/gallon to bare new and existing concrete.
• apply primer of duration k-33 acrylic satin @ 2.0-3.0 mils dft. mpi #15
• apply topcoat of duration k-33 acrylic satin @ 2.0-3.0 mils dft. mpi#15
brick and 12” overlap on concrete coating spec section 07 19 00
• apply loxon 40% silane water repellent @ 100-150 sf/gallon. mpi#117
• project close out inspection and documentation. | $2,946,400 |