Back to contract actions
Awarding Agency
Sub-Agency
Department of the Army
Start Date
April 7, 2026
End Date
October 31, 2029
NAICS
PSC
Y1NA
Transactions (2)
| Date | Mod # | Obligation |
|---|---|---|
| Apr 7, 2026 | 0 | +$57,956,500 |
| Apr 16, 2026 | P00001 | +$0 |
Subcontractors 21$27,425,305 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI ZSF4FDM8U361 Bridge crane system | $115,711 |
UEI UNEACD19J177 Fuel pipe & fittings | $1,982,418 |
UEI WT3BGLHMVEB3 Furnish stockpile and load/haul/disposition contaminated soil. | $2,072,717 |
UEI C13MXRJDK8E7 Concrete forming and pouring | $1,448,340 |
UEI QQ6DEQR2UBT5 Electrical gear package | $824,764 |
UEI KWDRULS1L9Y1 Cathodic protection | $259,200 |
UEI WD44MLFJM8W5 Internal floating pan | $223,160 |
UEI QQ6DEQR2UBT5 Lighting package | $146,141 |
UEI N5N6ZPYR3S95 Storm water and dewatering plan preparation/inspection | $170,522 |
UEI LU54PU4J8KS5 Reinforcing steel supply and install | $302,495 |
UEI LNRNQPR2TFK4 Construction inspection and testing services | $100,000 |
UEI MG21NC8X6UR5 Construction inspection and testing services | $100,000 |
UEI H239U53ZZK43 Survey services | $35,000 |
UEI EKP7SZJDLEL5 Paint (2) 5,000 bbl tanks, & above ground painting | $3,239,788 |
UEI ZLFEVJBQ8N51 Install both temporary and permanent fencing. | $228,643 |
UEI LNLLL9KGDDP6 Design, furnish, and install two (2) 5,000 bblapi 650 tanks | $1,636,434 |
UEI MS3AB45A3W83 Fuel system start-up and commissioning | $192,624 |
UEI TZ3XSJG2ZLF2 Site clear/grub;site grading & ug utility trenching/install | $8,904,413 |
UEI MS3AB45A3W83 Fueling system components | $4,744,329 |
UEI SCPZG2UKKBE5 Aboveground product recovery tank (prt) | $180,269 |
UEI JLEUWJ922HN3 Packaged generator set (@ 600 ekw) w/ arctic enclosure | $518,338 |