FedOps logoFedOps
Back to contract actions
PIIDW911QX26FA046DELIVERY ORDER

STAMPEDE VENTURES, INC.

UEI: WT4BZHCLS8X7
$1,404,758.72
Awarding Agency
Sub-Agency
Department of the Army
Start Date
June 10, 2026
End Date
February 2, 2028
NAICS
PSC
Z2AA
Transactions (1)
DateMod #Obligation
Jun 9, 20260+$1,404,759
Subcontractors 1$1,051,750 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI DQH3X7ZXPMH4
Task order a001 1. documenting of field conditions, including available utilities, and understanding of project requirements. 2. a design narrative documenting the approach that will be used meeting the objectives of the project and analysis of pertinent codes, criteria, and standards (mechanical, electrical, life safety, etc.). 3. schematic drawings, utilizing previous lidar scan data and field investigations, that will be developed through the subsequent design stages showing theoretical routing and placement of systems under consideration. 4. a parametric cost estimate. 5. a communication plan identifying project stakeholders, their role, and method of frequency of communication for review and approval. 6. meeting minutes for the project definition report review meeting. task order a002 1. a conceptual design narrative documenting design progression. 2. drawings showing conceptual/interim level layout of equipment, routing of systems, and facility and site modifications. (pdf and dwg) 3. an outline of specifications to be included in the project. 4. a rough order of magnitude cost estimate based upon the conceptual/interim documents. 5. design calculations for all disciplines under design (mechanical, electrical, structural, etc.). mechanical load calculations shall include load factors and assembly types used to arrive at the cooling and heating loads i.e. wall construction, air infiltration, mechanical ventilation, solar load, etc. 6. cutsheets and specifications for equipment under consideration. if specific manufacturers and models are specified there shall be several brands called out in design documents. 7. meeting minutes for the conceptual/interim design document review meeting. task order a003 1. drawings showing final locations of systems under design with sufficient detail to validate the designer's approach. (pdf and dwg) 2. red-lined specifications. 3. a pre-final detailed cost estimate based upon the pre-final documents. 4. a phasing plan detailing removals and installations. 5. a commissioning plan for designed equipment and systems. 6. meeting minutes for the pre-final design document review meeting. task order a004 1. drawings signed and sealed by a licensed new jersey state professional engineer and architect as applicable. 2. design analysis which shall include all backup material previously submitted and revised, as necessary, all design calculations, all explanatory material giving the design rationale for any design decisions which would not be obvious to an engineer reviewing the final drawings and specifications, and any information that will assist in administering the construction contract. 3. two (2) hard copies of design drawings, and one (1) electronic cd of design drawings (microstation and pdf format), technical specifications, design calculations, and design analysis shall also include code analysis, design calculations, meeting minutes, review comments disposition, design narratives, etc. 4. detailed final cost estimate 5. annotated conceptual/interim review comments. task order a005 perform applicable demolition on existing ahu and ductwork. 1. furnish and install one (1) 40-ton split system. a. condenser to be on new concrete pad. b. ahu to be equipped with hot gas reheat and a steam heating coil. 2. furnish and install three (3) fan powered boxes with electric reheats. a. these to serve the bathrooms, front office, and front vestibule 3. fabricate and install all necessary plate steel to seal existing process intake/exhaust air 4. opening in lower level. 5. cap existing relief air ducting. 6. furnish and install one (1) new bathroom exhaust fan. a. fan to be installed on one of the current roof curbs. 7. furnish and install all necessary refrigerant and condensate piping for the split system. 8. furnish and install all necessary steam and steam condensate piping for the split system. 9. furnish and install all necessary power wiring to come from existing 460v feeds. 10. furnish and i
$1,051,750