Back to contract actions
Awarding Agency
Sub-Agency
Department of the Army
Start Date
September 21, 2023
End Date
September 26, 2025
NAICS
PSC
Z2PZ
Transactions (10)
| Date | Mod # | Obligation |
|---|---|---|
| Sep 21, 2023 | 0 | +$7,748,622 |
| Sep 29, 2023 | P00001 | +$728,403 |
| Oct 31, 2023 | P00002 | +$0 |
| Mar 18, 2024 | P00003 | +$6,106,288 |
| Aug 14, 2024 | A00001 | +$7,716 |
| Sep 26, 2024 | A00003 | +$221,676 |
| Sep 26, 2024 | A00002 | +$241,662 |
| Aug 21, 2025 | A00004 | -$690 |
| Sep 30, 2025 | A00005 | +$234,593 |
| Sep 30, 2025 | A00006 | +$57,767 |
Subcontractors 1$33,714 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI ZSVKYQ8J9QM3 Demolition
• disconnect and remove existing 15a, single-pole branch circuits serving the infrared (ir) unit heaters.
• remove existing conductors, disconnect means, and associated wiring components that are not compatible with the upgraded circuit requirements.
• dispose of removed materials in accordance with project requirements and applicable regulations.
electrical modifications
• replace existing 15a, 1-pole circuit breakers in panelboard b with new 30a, 1-pole circuit breakers.
• install new branch circuit conductors consisting of two (2) #10 awg conductors and one (1) #10 awg grounding conductor, or as otherwise required by the approved design/rfi.
• utilize existing conduit/raceways where feasible and approved for conductor routing.
• install new conductor whips and associated fittings required for connection to each infrared unit heater.
• provide and install a 30a, 277v-rated snap switch at each infrared unit heater to serve as the local disconnecting means.
• install all snap switches within dust-proof enclosures suitable for the operating environment.
• terminate, label, and test all new wiring and equipment connections.
cleanup
• remove all demolition debris, excess materials, and packaging from the work area.
• clean the work area upon completion of the installation.
• leave the site in a neat and orderly condition ready for owner use.
exclusions
• repair or replacement of concealed or existing infrastructure found to be damaged or non-compliant beyond the scope identified in rfi 55.
• modifications to equipment or systems not specifically identified in this scope. | $33,714 |