FedOps logoFedOps
Back to contract actions
PIIDW912HZ23C0036DEFINITIVE CONTRACT
$549,758.00
Awarding Agency
Sub-Agency
Department of the Army
Start Date
August 15, 2023
End Date
August 14, 2026
NAICS
PSC
AH12
Transactions (1)
DateMod #Obligation
Aug 8, 20230+$549,758
Subcontractors 1$107,430 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI NNFQH1JAPEP3
The university of florida will assume full responsibility for fabricating, preparing, and deploying at least one complete sentinel tower during the project performance period. deployment is contingent on a landfalling hurricane of sufficient strength to warrant mobilization. in the absence of an appropriate hurricane event, a longer-term, off-season deployment will be conducted instead. if funding and time allows, the university of florida may apply the balance of their funding to fabricate additional sentinel towers or tower components as appropriate. in addition to tower fabrication, preparation, and deployment, the uf team will be responsible for purchasing and integrating two ysi exo (or similar) water quality sondes into the sentinel platform. here, integration includes consideration of both hardware and software systems, as appropriate. and water quality and adcp measurements will be saved on each instrument during deployment and data will be retrieved after an event. data will not be incorporated into the tower’s data acquisition and telemetry protocols to ensure that restricted and unrestricted data streams are kept separate. the sentinel dataloggers (wind, water depth, etc.) will be unrestricted data, but water quality and adcp measurements will be restricted data. though USA will purchase the adcp, the university of florida will assume responsibility for integrating the sensor into the sentinel tower’s frame/foundation and data systems, as appropriate. USA will send the adcp to the university of florida (instrument loan) to allow for the integration of systems.
$107,430