PIIDW912PL12C0022DEFINITIVE CONTRACT

CDM CONSTRUCTORS INC.

UEI: SK8BJTEP5KB3
$102,878,710.15
Awarding Agency
Sub-Agency
Department of the Army
Start Date
September 12, 2012
End Date
March 19, 2021
NAICS
PSC
Y1NE

Description

DESIGN BUILD - EDR WATER TREATMENT AND SYSTEM DESIGN AND CONSTRUCTION ACTIVITIES INCLUDING BUT NOT LIMITED TO THE DESIGN BUILD OF A 6.0 MILLION GALLONS PER DAY (MGD) EDR WATER TREATMENT PLANT. THE PLANT WILL TREAT ALL CONTAMINANTS FOUND IN FORT IRWIN'S GROUND WATER IN ACCORDANCE WITH (IAW) FEDERAL AND STATE REQUIREMENTS (I.E.: ARSENIC, FLUORIDE, AND TOTAL DISSOLVED SOLIDS). THE PLANT WILL INCLUDE AN ELECTRO-DIALYSIS REVERSAL (EDR) SYSTEM AS PRIMARY TREATMENT. THE PROJECT ALSO INCLUDES THE CONSTRUCTION OF THE EDR FACILITY WITH PUMPS, EDR STACKS, FILTERS, AND AN EDR WASTE EQUALIZATION TANK. THE PLANT ALSO INCLUDES TREATMENT OF THE WASTE STREAM TO ACHIEVE 99.8% POTABLE WATER RECOVERY RATE WITH REJECT DISCHARGE TO EVAPORATION PONDS. CONSTRUCTION ALSO INCLUDES A 1 MILLION GALLON (MG) PRETREATMENT TANK AND A 1 MG CLEAR WELL TANK. PROJECT ALSO INCLUDES CONTROL BUILDING, CHEMICAL BUILDING, TREATED WATER PUMP STATION, PROCESS DRAIN PUMP STATION, STANDBY GENERATOR, PROCESS PIPING, AND SCADA. THE PROJECT INCLUDES SUPPORTING UTILITIES AND INFRASTRUCTURE UPGRADES TO THE WATER PLANT INCLUDE ELECTRIC SERVICE, SITE IMPROVEMENTS, COMMUNICATIONS, WATER, SEWER, GAS, STORM WATER DRAINAGE AND ANTITERRORISM MEASURES. COMMISSIONING OF THE WATER TREATMENT PLANT IS ALSO INCLUDED. THE WATER SYSTEM IMPROVEMENTS INCLUDE PIPELINES CONNECTING THE WATER PLANT TO BICYCLE LAKE BOOSTER STATION, REPLACEMENT OF EXPIRED PIPE AND EQUIPMENT, AND WATER SUPPLY /DISTRIBUTION SYSTEM EXPANSION. OTHER SYSTEM IMPROVEMENTS INCLUDE IMPROVEMENT OF FIRE FLOW, INSTALLATION OF A NEW WATER WELL AT LANGFORD LAKE AND CONNECTING IRWIN BASIN WELLS TO RAW WATER TRANSMISSION LINES. TANK CONSTRUCTION INCLUDES REHABILITATION OF EXISTING WELDED STEEL WATER STORAGE TANKS AND REPAIR/REPLACEMENT OF A 1 MG ABOVE GROUND WATER STORAGE TANK. SUSTAINABLE DESIGN AND DEVELOPMENT (SDD), ENERGY INDEPENDENCE AND SECURITY ACT (EISA) OF 2007, AND ENERGY POLICY ACT OF 2005 (EPACT05) FEATURES WILL BE INCLUDED.

Transactions (39)
DateMod #Obligation
Sep 12, 20120+$100,112,660
Apr 11, 2013P00001+$0
Apr 16, 2013P00002-$20,700
Aug 1, 2013P00004-$32,661
Aug 1, 2013P00003-$20,070
Nov 21, 2013P00005-$379,959
Dec 5, 2013P00006-$23,183
Dec 9, 2013P00007+$130,422
Feb 28, 2014P00008-$8,318
Mar 3, 2014P00009+$99,076
Mar 26, 2014P00010-$143,823
Apr 8, 2014P00011+$139,574
Jul 1, 2014P00012+$0
Aug 14, 2014P00013-$35,000
Sep 25, 2014P00014-$277,000
Jan 8, 2015P00015+$124,500
Feb 6, 2015P00016-$155,000
Feb 26, 2015P00017+$66,000
Mar 6, 2015P00018+$269,000
Mar 26, 2015P00019+$13,000
Apr 12, 2015P00020+$73,000
May 14, 2015P00021+$170,000
Jul 29, 2015P00022+$212,421
Aug 26, 2015P00023-$40,105
Sep 15, 2015P00024+$32,249
Dec 22, 2015P00025+$21,459
Feb 2, 2016P00026+$383,582
Mar 14, 2016P00027+$60,900
Mar 29, 2016P00028+$483,500
Apr 19, 2016P00029+$10,680
Jun 6, 2016P00030+$28,598
Jul 18, 2016A00001+$0
Aug 4, 2016P00031+$126,000
Sep 1, 2016P00032+$128,847
Nov 10, 2016P00033+$37,175
Dec 15, 2016P00034+$382,900
Dec 22, 2016P00035+$90,000
Apr 22, 2019A00002+$448,222
Mar 19, 2021P00036+$370,764