Description
DESIGN BUILD - EDR WATER TREATMENT AND SYSTEM DESIGN AND CONSTRUCTION ACTIVITIES INCLUDING BUT NOT LIMITED TO THE DESIGN BUILD OF A 6.0 MILLION GALLONS PER DAY (MGD) EDR WATER TREATMENT PLANT. THE PLANT WILL TREAT ALL CONTAMINANTS FOUND IN FORT IRWIN'S GROUND WATER IN ACCORDANCE WITH (IAW) FEDERAL AND STATE REQUIREMENTS (I.E.: ARSENIC, FLUORIDE, AND TOTAL DISSOLVED SOLIDS). THE PLANT WILL INCLUDE AN ELECTRO-DIALYSIS REVERSAL (EDR) SYSTEM AS PRIMARY TREATMENT. THE PROJECT ALSO INCLUDES THE CONSTRUCTION OF THE EDR FACILITY WITH PUMPS, EDR STACKS, FILTERS, AND AN EDR WASTE EQUALIZATION TANK. THE PLANT ALSO INCLUDES TREATMENT OF THE WASTE STREAM TO ACHIEVE 99.8% POTABLE WATER RECOVERY RATE WITH REJECT DISCHARGE TO EVAPORATION PONDS. CONSTRUCTION ALSO INCLUDES A 1 MILLION GALLON (MG) PRETREATMENT TANK AND A 1 MG CLEAR WELL TANK. PROJECT ALSO INCLUDES CONTROL BUILDING, CHEMICAL BUILDING, TREATED WATER PUMP STATION, PROCESS DRAIN PUMP STATION, STANDBY GENERATOR, PROCESS PIPING, AND SCADA. THE PROJECT INCLUDES SUPPORTING UTILITIES AND INFRASTRUCTURE UPGRADES TO THE WATER PLANT INCLUDE ELECTRIC SERVICE, SITE IMPROVEMENTS, COMMUNICATIONS, WATER, SEWER, GAS, STORM WATER DRAINAGE AND ANTITERRORISM MEASURES. COMMISSIONING OF THE WATER TREATMENT PLANT IS ALSO INCLUDED. THE WATER SYSTEM IMPROVEMENTS INCLUDE PIPELINES CONNECTING THE WATER PLANT TO BICYCLE LAKE BOOSTER STATION, REPLACEMENT OF EXPIRED PIPE AND EQUIPMENT, AND WATER SUPPLY /DISTRIBUTION SYSTEM EXPANSION. OTHER SYSTEM IMPROVEMENTS INCLUDE IMPROVEMENT OF FIRE FLOW, INSTALLATION OF A NEW WATER WELL AT LANGFORD LAKE AND CONNECTING IRWIN BASIN WELLS TO RAW WATER TRANSMISSION LINES. TANK CONSTRUCTION INCLUDES REHABILITATION OF EXISTING WELDED STEEL WATER STORAGE TANKS AND REPAIR/REPLACEMENT OF A 1 MG ABOVE GROUND WATER STORAGE TANK. SUSTAINABLE DESIGN AND DEVELOPMENT (SDD), ENERGY INDEPENDENCE AND SECURITY ACT (EISA) OF 2007, AND ENERGY POLICY ACT OF 2005 (EPACT05) FEATURES WILL BE INCLUDED.
| Date | Mod # | Obligation |
|---|---|---|
| Sep 12, 2012 | 0 | +$100,112,660 |
| Apr 11, 2013 | P00001 | +$0 |
| Apr 16, 2013 | P00002 | -$20,700 |
| Aug 1, 2013 | P00004 | -$32,661 |
| Aug 1, 2013 | P00003 | -$20,070 |
| Nov 21, 2013 | P00005 | -$379,959 |
| Dec 5, 2013 | P00006 | -$23,183 |
| Dec 9, 2013 | P00007 | +$130,422 |
| Feb 28, 2014 | P00008 | -$8,318 |
| Mar 3, 2014 | P00009 | +$99,076 |
| Mar 26, 2014 | P00010 | -$143,823 |
| Apr 8, 2014 | P00011 | +$139,574 |
| Jul 1, 2014 | P00012 | +$0 |
| Aug 14, 2014 | P00013 | -$35,000 |
| Sep 25, 2014 | P00014 | -$277,000 |
| Jan 8, 2015 | P00015 | +$124,500 |
| Feb 6, 2015 | P00016 | -$155,000 |
| Feb 26, 2015 | P00017 | +$66,000 |
| Mar 6, 2015 | P00018 | +$269,000 |
| Mar 26, 2015 | P00019 | +$13,000 |
| Apr 12, 2015 | P00020 | +$73,000 |
| May 14, 2015 | P00021 | +$170,000 |
| Jul 29, 2015 | P00022 | +$212,421 |
| Aug 26, 2015 | P00023 | -$40,105 |
| Sep 15, 2015 | P00024 | +$32,249 |
| Dec 22, 2015 | P00025 | +$21,459 |
| Feb 2, 2016 | P00026 | +$383,582 |
| Mar 14, 2016 | P00027 | +$60,900 |
| Mar 29, 2016 | P00028 | +$483,500 |
| Apr 19, 2016 | P00029 | +$10,680 |
| Jun 6, 2016 | P00030 | +$28,598 |
| Jul 18, 2016 | A00001 | +$0 |
| Aug 4, 2016 | P00031 | +$126,000 |
| Sep 1, 2016 | P00032 | +$128,847 |
| Nov 10, 2016 | P00033 | +$37,175 |
| Dec 15, 2016 | P00034 | +$382,900 |
| Dec 22, 2016 | P00035 | +$90,000 |
| Apr 22, 2019 | A00002 | +$448,222 |
| Mar 19, 2021 | P00036 | +$370,764 |