FedOps logoFedOps
Back to contract actions
PIIDW912PM25C0043DEFINITIVE CONTRACT
$3,312,019.00
Awarding Agency
Sub-Agency
Department of the Army
Start Date
October 24, 2025
End Date
October 21, 2026
NAICS
PSC
Y1LB
Transactions (2)
DateMod #Obligation
Sep 28, 20250+$3,312,019
Oct 20, 2025P00001+$0
Subcontractors 2$2,342,243 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI YEJ4V2AZ4BH8
Base culvert: • new culvert installation o install (2) concrete box culverts at the motsu class yard • site grading and reconstruction of the trapezoidal channel. • re-grade (3) storage areas approx. 2 feet deeper and provide positive drainage. • grade/restore existing drainage ditches option 1: brunswick road culvert • installing culvert to include: o excavation o culvert installation o backfill to existing conditions option 2: trapezoidal channel culvert • installing culvert at trapezoidal channel o all earthwork associated including but not limited to excavation and clearing & grubbing. o culvert installation o backfill to existing conditions option 3: track 46 triangle culvert • installing culvert at track 46. o all earthwork associated including but not limited to excavation and clearing & grubbing. o culvert installation o backfill to existing conditions
$2,173,743
UEI CPYNJVPM6NE1
Design of new box culvert. 4.5.2 design of new re-grading layout for storage areas. 4.5.3 design to restore existing trapezoidal channel. 4.5.4 general ditch grading design. 4.5.5 design brunswick road culvert - 3x3 box culvert to replace 24-inch culvert. 4.5.6 design trapezoidal channel culvert – new driveway 36ft 24-inch culvert. 4.5.7 design track 46 triangle culvert – new 2x3, 40ft long culvert at the southern end of region 1 ditch.
$168,500