• Fermilab requires rebuilding and renovating the Kautz Road Substation to supply electricity to lab buildings and systems.
• This is an unrestricted competition, with no specified set-aside or NAICS code mentioned in the description.
• Construction must occur within Fermilab's accelerator shutdown window, from January 1, 2028, to January 1, 2030.
• Key milestones include completion of submittals and RFIs within 60 days of Notice to Proceed and a deadline of January 4, 2028, for shop drawing approvals.
• The U.S. Army Corps of Engineers requires replacement of existing 80KVA Uninterruptable Power Systems (UPSs) with distributed redundant UPSs at Fort Greelyvel, Alaska.
• Acquisition is set aside for Small Purchases from Historically Underutilized Business Zones (PSC/HSF) under NAICS Code Y1BF (Construction of Missile System Facilities).
• Key technical requirement includes upgrade to EPO standards and extension of power control systems into the facility from a remote source.
• The project is expected to cost between $1,000,000 and $5,000,000 with an anticipated 540 calendar day performance period.