• The Federal Emergency Management Agency (FEMA) requires a pre-engineered steel building for disaster relief at various facilities throughout Texas; the contractor must furnish tools, equipment, labor, and supervision.
• The project involves erecting a complete metal building system according to manufacturer's instructions with specified tolerances and conditions affecting performance.
• The Contractor will receive structural framing work from the concrete foundation and masonry bearing surfaces inspection prior to installing steel components.
• Work completion is expected by September 10, 2026; submission of materials and plans for approval must be made by September 11, 2026.