• The government seeks responses to ground-surface alteration including tree trimming, clearing, mowing, planting groundcovers, raking leaves, blowing snow and removing ice through the PIEE Solicitation module.
• • Quotes must remove the specified amounts of trees in the grounds' total paved area minus ungrounded areas such as roads.
• • The required scope includes removal under conditions equivalent to those at Fort Belvoir that are typically met during typical winter months when temperatures range below 25 degrees Fahrenheit along with a minimum of six consecutive days below zero.
• • A site visit will be coordinated for due diligence purposes.
• • Quotes must address all trees, from root ball to canopy; any portion not to be properly removed without clear identification and reference to documentation regarding previous work is non-functional.
CombinedHistorically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)1
• The U.S. Coast Guard Sector San Diego and Point Loma Housing Quarters locations require Contractor maintenance of approximately 22 acres, divided between two sites, with 8-mile separation.
• Contractors must access with valid REAL ID, Passport, or Common Access Card upon site visit; this is due on August 26, 2026.
• Grounds include historic 1892-labeled Point Loma Senior Housing Quarters and Cabrillo National Park grounds, which must remain under specified conditions upon site acceptance.