• The Phase II Environmental Site Assessment (ESA) at Royal Electric Yard requires laboratory analysis of soil samples, with test pits and soil borings serving as primary data collection methods.
• The Contractor is responsible for delivering appropriate sample containers, lab materials, and a daily local courier to transport necessary equipment and samples to the site location.
• Inconsistencies in requirements may be prioritized based on the most stringent Federal, State, or local standards, with compliance being assumed where inconsistencies exist.