BALLINA GROUP LLC
UEI: GLVMVBRRGQ13
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$1.4M
Received · FY2025–FY2027
$1.4M
Received · all years
6
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| GENERAL DYNAMICS OTS (WILKES BARRE), LLC | $1.4M |
Most recent
- $289KOP 200, 320, 335 CONCRETE REINFORCEMENT
- $445KREINFORCEMENT OF THE EXISTING FLOOR FOR THE REMOVAL OF NOSING PRESS CROWN 01.
- $452KMACHINE SHOP REINFORCEMENT ENGINEERING AND DESIGN.
- $91KSTEEL & CONCRETE WORK FOR COOLANT TANK FLOOR REINFORCEMENT.
- $65KLOADING DOCK ARCHITECTURE AND ENGINEERING DESIGN
- $84KVISITOR CONTROL CENTER ARCHITECTURAL AND ENGINEERING DESIGN