Back to contract actions
PIIDW519TC23F0171DELIVERY ORDER
GENERAL DYNAMICS OTS (WILKES BARRE), LLC
UEI: V1TVADBWD4E9
$345,817,840.11
Awarding Agency
Sub-Agency
Department of the Army
Start Date
March 24, 2023
End Date
February 28, 2029
NAICS
PSC
M1EA
Description
155MM CAPACITY EXPANSION PROJECT FOR M795 AND M1128 TO 65K/MONTH
Transactions (14)
| Date | Mod # | Obligation |
|---|---|---|
| Mar 24, 2023 | 0 | +$217,676,592 |
| May 31, 2023 | P00001 | -$43,187,148 |
| Sep 18, 2023 | P00002 | +$0 |
| Dec 22, 2023 | P00003 | +$30,078,148 |
| Mar 20, 2024 | P00004 | +$28,085,000 |
| Jun 28, 2024 | P00005 | +$66,800,731 |
| Sep 26, 2024 | P00006 | +$13,301,908 |
| Feb 21, 2025 | P00007 | +$4,004,259 |
| Jul 24, 2025 | P00008 | +$16,258,268 |
| Sep 26, 2025 | P00009 | +$4,887,949 |
| Dec 19, 2025 | P00010 | +$18,492,331 |
| Apr 9, 2026 | P00011 | -$21,000,000 |
| May 27, 2026 | P00013 | +$5,209,901 |
| Jul 2, 2026 | PZ0012 | +$5,209,901 |
Subcontractors 69$41,384,928 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI GJD6STHJM3R3 Press rebuild electrical discoveries & np2 bliss press clutch repair | $462,570 |
UEI ENLWH8J14KF5 Conveyor swing gate to pre-nosing area | $67,492 |
UEI ENLWH8J14KF5 Concrete measuring pre-nosing | $41,900 |
UEI LGAMQZZ3MEZ7 Op 320 vlm/ut quarantine programming | $83,381 |
UEI YEHDSYEAM7F4 New shotblast system + new dust collector and ductwork installation | $829,700 |
UEI MJRDC3ZCV2X9 Complete chuck package | $138,304 |
UEI JV3XU5EMBSB1 Conveyor control panel box electric feeds | $41,280 |
UEI XFQFMTK2MT55 Relocation/rework items for 35k conveyor systems | $67,230 |
UEI R4C3MNW4FGR6 24-1019 conveyor modification for erie 2 ih | $176,700 |
UEI RBCFQEG6NTH6 Nosing press 1 se1-800 electrical addendum | $198,200 |
UEI JV3XU5EMBSB1 Op 30 wall opening and utility relocation & phosphate conveyor install | $231,046 |
UEI GLVMVBRRGQ13 Op 200, 320, 335 concrete reinforcement | $288,670 |
UEI ED8BKRCQBFJ7 Change order 1 for nosing press 1 removal/nosing press 2 swap | $369,000 |
UEI JV3XU5EMBSB1 Np1 conveyor modifications for crown removal | $71,112 |
UEI RBCFQEG6NTH6 Bliss press loader arm rebuild and reassembly & bliss press transfer exit conveyor rebuild | $235,920 |
UEI K4ZKQGJW5X88 Loading dock change order 2 - relocation of water lines under loading dock as per usg request/approval. | $140,518 |
UEI JV3XU5EMBSB1 Concrete replacement for op 200-220 area nte | $234,525 |
UEI ZJ62QGNT8H55 Engineering services for the additional scope content for the phosphate line. | $354,750 |
UEI LGAMQZZ3MEZ7 Op 335 final inspect vici vision gage r&r + op 320 ut inspect andec ut machine gage r&r support nte | $157,660 |
UEI K4ZKQGJW5X88 Loading dock change order 1 - brick infill for windows, change from cmu in original proposal as per shpo | $63,632 |
UEI GLVMVBRRGQ13 Reinforcement of the existing floor for the removal of nosing press crown 01. | $445,080 |
UEI JV3XU5EMBSB1 35k pull-ancillary ahead work | $659,544 |
UEI RCNTW3HMXH34 35k expansion equipment loads | $110,600 |
UEI EA4AJ7B5KA36 Install of decking between erie ii forge presses. | $77,680 |
UEI ZJ62QGNT8H55 5019 f conveyors for finish turn north. | $235,000 |
UEI FP6TVJELTE57 Machine shop bus duct d4 - f4 & bus duct d3 - f3 | $135,379 |
UEI GLVMVBRRGQ13 Machine shop reinforcement engineering and design. | $452,000 |
UEI JV3XU5EMBSB1 Nosing press 1 utilities relocation and demo | $87,193 |
UEI C5H6VLXTTL87 Erie press 2 tooling | $170,480 |
UEI K4ZKQGJW5X88 Construct new loading dock facility in accordance with plans provided by ballina group | $2,668,344 |
UEI MJRDC3ZCV2X9 Perishable cutting tools for gosiger sat | $113,400 |
UEI MJRDC3ZCV2X9 35k gosiger open eco list | $1,359,082 |
UEI RCNTW3HMXH34 35k visitor control center turn-key construction project | $1,347,453 |
UEI HYNQLKMNHKM6 Program management and engineering services in support of the 35k program. | $432,000 |
UEI ZJ62QGNT8H55 Elevated guarding for the 35k expansion aei conveyors (additional safety measure) | $101,850 |
UEI ZJ62QGNT8H55 5005 rough turn (pivot conversion) & 5007 op160 infeed (pivot conversion) | $292,250 |
UEI J5LVUS5BR133 Labor and equipment for removal of the forge shop rto unit. | $137,500 |
UEI RYF6GH258MT3 Grieve model hd-484848-ht gas fired box furnaces | $569,518 |
UEI K9VMHL2MG5X7 155mm m795 ut inspection standard circumferential and longitudinal. | $57,794 |
UEI VY8MJZGNFXK6 Erie 1 induction heater 5000kva transformer installation. | $325,577 |
UEI EWBUTL3N8BN5 35k machine shop crysta-apex v9208 measuring machine (cmm machine). | $306,488 |
UEI EWBUTL3N8BN5 Gaging for 35k machine shop. | $62,873 |
UEI MJRDC3ZCV2X9 35k machine shop manual lathes. | $561,960 |
UEI ZDVHY48UFHP5 Increased timeline for installation of press. | $500,000 |
UEI J5LVUS5BR133 35k machine shop rigging and machine installation. | $597,500 |
UEI N2B7Y53WSQ13 Electrical disconnect and removal of legacy saw/gantry system. | $47,378 |
UEI JV3XU5EMBSB1 Gd-ots technical, engineering, design, and turn-key machine installation support for 35k expansion program at scaap. | $6,671,534 |
UEI K4HHMQSKE814 Taylor winfield spare parts for site acceptance testing (sat). | $43,471 |
UEI GLVMVBRRGQ13 Steel & concrete work for coolant tank floor reinforcement. | $91,000 |
UEI RCNTW3HMXH34 Receiving and shipping remaining 35k material in and out of duryea warehouse. | $140,000 |
UEI RBCFQEG6NTH6 Additional labor to remove crown and slide from np1; relocate crown from np2 (35k np1 crown swap). | $45,000 |
UEI JV3XU5EMBSB1 Gd-ots technical, engineering, design, and turn-key machine installation support for 35k expansion program at scaap | $4,653,322 |
UEI MJRDC3ZCV2X9 Gosiger okuma cnc lathes for scaap machine shop | $3,820,801 |
UEI NN3WKJ4DMEL7 35k expansion erie 2 press tooling | $63,000 |
UEI XUDFLWN1J667 Erie 2 press tooling - extrude tooling | $53,718 |
UEI XUDFLWN1J667 Erie 2 press tooling - preform lower tooling | $56,343 |
UEI WED9AQH81SW3 Erie 2 press tooling - extrude stripper assembly + draw riser assembly | $35,100 |
UEI RBCFQEG6NTH6 Nosing press #1 -engineering, labor, and materials to rebuild the bed ejector for the se1-800 | $88,754 |
UEI HWKKXCQ45U67 Mettler toledo scale integration with installation, training and runoff of the temporary line | $198,164 |
UEI NN3WKJ4DMEL7 Erie 2 press tooling - extrude | $43,515 |
UEI NN3WKJ4DMEL7 Erie 2 press tooling - extrude | $54,430 |
UEI XFQFMTK2MT55 35k rough turn - mayfran chip conveyor | $319,582 |
UEI GLVMVBRRGQ13 Loading dock architecture and engineering design | $64,600 |
UEI GLVMVBRRGQ13 Visitor control center architectural and engineering design | $84,200 |
UEI MJRDC3ZCV2X9 Eco 06 & 07 rough turn drawer storage for tool trays | $405,521 |
UEI UNTXVZN8KZZ3 Op.20 saw cell gantry system | $391,500 |
UEI JV3XU5EMBSB1 Gd-ots technical, engineering, design, and turn-key machine installation support for 35k expansion program at scaap | $7,089,380 |
UEI MQCQF5MLYWD1 Procurement of shotblast pots | $89,480 |
UEI ED8BKRCQBFJ7 35k crown removal and reinstall | $775,000 |