FedOps logoFedOps

BUILD ALL CONTRACTING CORP

UEI: PNZYTRLNYAJ2
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$377K
Received · FY2025–FY2027
$377K
Received · all years
1
Subawards
1
Prime

Top primes

Prime contractorTotal
STAMPEDE VENTURES, INC.$377K

Most recent

  • 10/09/2025 STAMPEDE VENTURES, INC. · W15QKN25FA349 · Department of Defense (DOD)
    1. MAIN ENTRANCE VESTIBULE A. PROTECT FLOORING B. DEMO EXISTING DROP CEILING (LIGHTS AND EXIT SIGN REMOVED BY OTHERS) C. INSTALL RC-1 CHANNEL ON EXISTING SHEETROCK INSIDE VESTIBULE (3-WALLS) D. INSTALL 5/8 QUITE ROCK ON 3 WALLS E. INSTALL ARMSTRONG SUSPENDED CEILING SYSTEM F. INSTALL 2 LAYERS OF 5/8 QUITE ROCK ON CEILING G. INSTALL ROXUL 60 ACOUSTICAL INSULATION ON CEILING H. DEMO EXISTING INTERIOR DOOR AND FRAME MODIFY OPEN TO FIX NEW DOOR I. SUPPLY (1) STC 55 METAL DOOR AND BUCK WITH CLOSER (DOORS ARE NOT PREPPED FOR HARDWARE) J. LABOR TO INSTALL DOOR K. PATCH AND PREP EXISTING WALLS (1) INSIDE VESTIBULE L. PAINT WALLS AND CEILING 1 COAT PRIMER AND 2 COATS FINISH PAINT M. PAINT NEW METAL DOORS AND BUCK N. MOUNT (3) PRECISION LOCKER SUPPER 30 CELL PHONE LOCKER O. (90) ORANGE SOFT SPRING WRIST BAND KEY CHAIN P. INSTALL (1) LAPTOP LOCKER 14 DOORS 2. SECONDARY ENTRANCE VESTIBULE A. PROTECT FLOORING B. DEMO EXISTING DROP CEILING (LIGHTS AND EXIT SIGN DISCONNECTED BY OTHERS) C. INSTALL RC-1 CHANNEL ON EXISTING SHEETROCK INSIDE VESTIBULE (3-WALLS) D. INSTALL 5/8 QUITE ROCK ON 3 WALLS E. INSTALL ARMSTRONG SUSPENDED CEILING SYSTEM F. INSTALL 2 LAYERS OF 5/8 QUITE ROCK ON CEILING G. INSTALL ROXUL 60 ACOUSTICAL INSULATION ON CEILING H. DEMO EXISTING INTERIOR DOOR AND FRAME MODIFY OPEN TO FIX NEW DOOR I. SUPPLY (1) STC 55 DOUBLE METAL DOOR AND 6070 BUCK WITH CLOSER (DOORS ARE NOT PREPPED FOR HARDWARE) J. SUPPLY IVES SB360 12" SLIDE BOLT ON FIXED DOOR TOP AND BOTTOM K. LABOR TO INSTALL DOOR L. DEMO EXISTING EXTERIOR DOUBLE DOOR AND FRAME M. SUPPLY NEW DOUBLE DOORS AND FRAME COMPLETE WITH METAL TRANSOM TO FIT IN EXISTING OPENING N. BOTH DOORS ACTIVE WITH VERTICAL ROD EXIT DEVICE O. LABOR TO INSTALL DOOR P. PATCH AND PREP EXISTING WALLS (1) INSIDE VESTIBULE Q. PAINT WALLS AND CEILING 1 COAT PRIMER AND 2 COATS FINISH PAINT R. CAULK / PAINT NEW DOUBLE METAL DOORS AND BUCK S. INSTALL (1) LAPTOP LOCKER 14 DOORS T. (14) ORANGE SOFT SPRING WRIST BAND KEY CHAIN 3. DOOR MODIFICATION SOUTH END EXIT ONLY A. DEMO EXISTING DOOR AND FRAME B. SUPPLY (1) STC 55 METAL DOOR AND BUCK WITH CLOSER (MATERIAL) TO FIT EXISTING OPENING C. SUPPLY LOCKMASTER LKM10K TYPE IX PUSH PULL HANDLE EXIT ONLY D. LABOR TO INSTALL DOOR AND HARDWARE E. REPAIR THRESHOLD F. CAULK / PAINT DOOR AND BUCK 4. INTERIOR SECONDARY DOOR #1 A. DEMO EXISTING INTERIOR DOOR AND FRAME MODIFY OPEN TO FIX NEW DOOR B. SUPPLY (1) STC 55 METAL DOOR AND BUCK WITH CLOSER (DOORS ARE NOT PREPPED FOR HARDWARE) C. LABOR TO INSTALL DOOR D. MOUNT (1) PRECISION LOCKER SUPPER 30 CELL PHONE LOCKER E. (30) ORANGE SOFT SPRING WRIST BAND KEY CHAIN F. CAULK / PAINT DOOR AND BUCK 5. INTERIOR SECONDARY DOOR #2 A. DEMO EXISTING INTERIOR DOOR AND FRAME MODIFY OPEN TO FIX NEW DOOR B. SUPPLY (1) STC 55 METAL DOOR AND BUCK WITH CLOSER (DOORS ARE NOT PREPPED FOR HARDWARE) C. LABOR TO INSTALL DOOR D. MOUNT (1) PRECISION LOCKER SUPPER 30 CELL PHONE LOCKER E. (30) ORANGE SOFT SPRING WRIST BAND KEY CHAIN F. CAULK / PAINT DOOR AND BUCK 6. INTERIOR DEMISING WALL A. PROTECT FLOORING HANG PLASTIC FOR DUST CONTROL B. REMOVE INSULATION LAYING ON TOP OF EXISTING CEILING TILE (SAVE) C. DEMO CEILING TILE AND GRID 5' OFF BOTH SIDES OF DEMISING WALL D. LIGHTS / EXIT SIGNS / SMOKE DETECTORS AND PULL STATIONS REMOVED BY OTHERS E. FRAME 3-5/8" METAL STUDS ON TOP OF EXISTING WALL TO UNDERSIDE OF ROOF F. INSTALL ROCKWOOL SAFE'N SOUND R-15 3" THICK G. INSTALL 1 LAYER OF 5/8 QUITE ROCK ON NON-OPEN SIDE AND 2 LAYERS ON OPEN STORAGE SIDE H. INSTALL 1 LAYER OF 5/8 QUITE ROCK OVER EXISTING WALL 10' HIGH OPEN STORAGE SIDE I. SEAL ALL PENETRATIONS J. REMOVE EXISTING WOOD DOOR IN CONFERENCE ROOM (SAVE) K. DEMO ENTIRE CEILING TILE AND GRID IN CONFERENCE ROOM L. NOTE: LIGHTS / EXIT SIGNS / SMOKE DETECTORS / TVS / HVAC AND PULL STATIONS REMOVED BY OTHERS M. INSTALL NEW METAL DOOR BUCK TO FIX NEW WALL WIDTH N. INSTALL 1 LAYER OF 5/8 QUITE ROCK OVER EXISTING WALL 10' HIGH ON 2 REMAINING CONFERENC
    $377K