FedOps logoFedOps

C. L. FELTS AND COMPANY, INC.

UEI: HDNWKGHQD851
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$218K
Received · FY2025–FY2027
$218K
Received · all years
2
Subawards
2
Primes

Top primes

Prime contractorTotal
STAMPEDE VENTURES, INC.$111K
EAGLE EYE ELECTRIC LLC$108K

Most recent

  • 06/05/2026 EAGLE EYE ELECTRIC, LLC · W56ZTN26FA068 · Department of Defense (DOD)
    ELECTRICAL DEMO CONSISTS OF DISCONNECTING POWER CIRCUITS FROM EQUIPMENT SCHEDULED FOR REMOVAL. B. ALL ELECTRICAL INSTALLATIONS SHALL BE PER NEC AND LOCAL APG STANDERS. C. ALL RENOVATIONS IN ACCORDANCE WITH THE PROJECT SOW. D. REWORK EXISTING LIGHTING TO CONFORM WITH THE NEW CEILING LAYOUT ON THE FIRST FLOOR FOR THE NEW BATHROOM. E. NEW BATHROOMS SHALL CONSIST OF NEW LIGHTING, GFI OUTLET AND FIRE ALARM DEVICES IF REQUIRED. F. NEW 120V, 20AMP OUTLETS AT EACH NEW WORKSTATION ON THE FIRST AND SECOND FLOOR OF AREA “A”. G. CAT 6 DATA/COMM CABLING, (3) TOTAL TO EACH WORK STATION FROM DCO LOCATION. H. NEW EXIT AND EMERGENCY LIGHT FIXTURES AS REQUIRED. I. NEW LIGHTS AND SUPPORT GRID FOR LIGHTING IN AREA “B”. THIS GRID WILL BE MADE FROM STRUT STEEL AND BE SUPPORTED FROM THE UPPER CEILING.
    $108K
  • 07/01/2025 STAMPEDE VENTURES, INC · W56ZTN25F0103 · Department of Defense (DOD)
    A. FURNISH AND INSTALL A 50KVA, 115/230-VOLT, DIESEL DRIVEN GENERATOR. THIS GENERATOR HAS A 48HOUR SUB-BASE TANK. B. FURNISH AND INSTALL AN AUTOMATIC TRANSFER SWITCH (WEATHER RATED) OUTSIDE OF BUILDING CLOSE TO THE GENERATOR. C. FURNISH AND INSTALL NORMAL SIDE POWER TO THE ATS FROM INSIDE BUILDING. D. FURNISH AND INSTALL LOAD SIDE FEEDER FROM THE ATS TO THE NEW PANEL LOCATED INSIDE THE BUILDING. E. REPLACE THE EXISTING PANEL INSIDE OF BUILDING WITH NEW PANEL, MAIN BREAKER AND BRANCH BREAKERS TO MATCH EXISTING SIZES. F. FURNISH AND INSTALL A DISCONNECT LOCATED IN THE BUILDING AS INDICATED PER THE SOW DATED APRIL 11TH. G. FURNISH AND INSTALL A GROUND RING FOR THE GENERATOR PAD. H. FURNISH AND INSTALL A NEW RED BEACON LIGHT ON THE GENERATOR FOR INDICATING THAT THE GENERATOR IS RUNNING. I. FURNISH AND INSTALL (1) GFI RECEPTACLE ON OUTSIDE BUILDING FOR EQUIPMENT MAINTENANCE. J. INCLUDES THE CRANE COST FOR UNLOADING AND SETTING OF THE GENERATOR. INCLUDES A (4) HOUR LOAD BANK TEST FOR THIS INSTALLATION
    $111K