Back to contract actions
Awarding Agency
Sub-Agency
Department of the Army
Start Date
June 25, 2025
End Date
July 24, 2026
NAICS
PSC
Y1JZ
Transactions (2)
| Date | Mod # | Obligation |
|---|---|---|
| Jun 26, 2025 | 0 | +$504,696 |
| Jan 8, 2026 | P00001 | +$0 |
Subcontractors 2$159,425 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI JBYRL5W2FNF9 • furnish and install 1 interior concrete pad 16’x 7’x4” thick with epoxy dowels and 8 gauge wwm
• 2 mechanical pads 5’x 3’ x 4” thick with epoxy dowels and 8 gauge wwm
• 1 3’x 3’ pad with epoxy dowels and 8 gauge wwm
• 1 exterior pad 4’x 7’x 4” with gravel base and 8 gauge wwm
• 1 rtu pad 7’x 9’ with a 18” turn down and #4 rebar at 12”ocew and stone base and 6” concrete top
• 1 exterior concrete mechanical pad 5’x 7’ (same spec as rtu pad)
• 1 17’x 14’ waste holding tank pad with a turn down on 3 sides and #4 rebar at 12”ocew, stone base and 6” concrete top
• 1 mechanical pad for equipment approximately 13’x14’ . 6” thick w epoxy dowels and 8 gauge wwm
• pour bathroom area approximately 15’x13’
• dowel the existing concrete and pour 6” pad back
• saw cut and demo the existing bathroom area approximately 15’x 13’ x 10” thick and haul away
• adding in approximately 50 lf of saw cutting for miscellaneous plumbing lines (this is just a calculated guess) knowing some additional lines will need to be cut
• pour additional concrete back in approximately 50 sq.ft.
• pour existing mezzanine approximately 17’x 16’x 4” thick with 8 gauge wwm | $48,708 |
UEI HDNWKGHQD851 A. furnish and install a 50kva, 115/230-volt, diesel driven generator. this generator has a 48hour sub-base tank.
b. furnish and install an automatic transfer switch (weather rated) outside of building close to the generator.
c. furnish and install normal side power to the ats from inside building.
d. furnish and install load side feeder from the ats to the new panel located inside the building.
e. replace the existing panel inside of building with new panel, main breaker and branch breakers to match existing sizes.
f. furnish and install a disconnect located in the building as indicated per the sow dated april 11th.
g. furnish and install a ground ring for the generator pad.
h. furnish and install a new red beacon light on the generator for indicating that the generator is running.
i. furnish and install (1) gfi receptacle on outside building for equipment maintenance.
j. includes the crane cost for unloading and setting of the generator.
includes a (4) hour load bank test for this installation | $110,717 |