CG MODEL TEK LLC
UEI: WN8ZW5DLWKP7
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$2.2M
Received · FY2025–FY2027
$2.2M
Received · all years
9
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| BEYOND NEW HORIZONS, LLC | $2.0M |
| BOOZ ALLEN HAMILTON INC | $124K |
Most recent
- $548KMETAL FABRICATION - COMPLEX - PROVIDE ALL MATERIAL & LABOR TO FABRICATE (QTY. 6) ABLATOR SEAT 25KM PER DRAWING 23-1055, REV. A. VENDOR TO FABRICATE ABLATOR SEAT 25KM FROM TA-10W (ASTM B365). VENDOR IS TO ADHERE TO ALL DRAWING NOTES. VENDOR SHALL FURNISH AEDC WITH A 100%-DIMENSIONAL INSPECTION REPORT AND CERTIFICATION THAT FABRICATED PARTS MEET ALL THE DIMENSIONAL AND OTHER SPECIFICATIONS OF THE RESPECTIVE DRAWINGS.
- $44KSERVICE, METAL FABRICATION: PROVIDE ALL LABOR AND MATERIAL TO FABRICATE TD0162 FROM 7075 T6 AL AND ADD THE HOLES/CHAMFERS TO THE ROD PROVIDED, FOLLOWING THE DIRECTIONS IN TD0170. USE THE TOLERANCES PROVIDED IN THE DRAWING TOLERANCE BLOCK UNLESS OTHERWISE CALLED OUT IN THE DRAWING. USE TD0171 AS A REFERENCE DRAWING ONLY, IT DEPICTS THE ASSEMBLY OF FIVE OF THE COMPONENTS. FOLLOW THE NOTES INCLUDED TO ENGRAVE THE DRAWING NUMBER ON THE EXTERIOR SURFACES WHERE ANNOTATED.
- $139KFABRICATION - COMPLEX - ALL MATERIAL, LABOR, AND RETURN SHIPPING WILL BE SUPPLIED THE VENDOR. VENDOR WILL MANUFACTURE: ? (QTY. 90) PARTS TO MATCH SHEET 1 ""DISK 1"" - MATERIAL: C10100 OFHC COPPER ALLOY AND ADHERE TO ALL DRAWING NOTES. VENDOR SHALL FURNISH CERTIFICATION OF CONFORMANCE FOR ALL MATERIALS. VENDOR SHALL FURNISH AEDC WITH WRITTEN CERTIFICATION THAT FABRICATED PARTS HAVE BEEN DIMENSIONALLY INSPECTED AND MEET ALL THE DIMENSIONAL AND OTHER SPECIFICATIONS OF THE RESPECTIVE DRAWINGS.
- $115KFABRICATION - COMPLEX - MATERIAL WILL BE PURCHASED BY THE VENDOR AS COLUMBIUM C-103 FORGING, ASTM B655 AND EITHER TZM OR C-103 ROD FOR PINS ON SHEET 2. THE VENDOR SHALL FURNISH MATERIAL CERTIFICATIONS AND MATERIAL DFARS COMPLIANCE UNLESS APPROVAL IS GIVEN BY AEDC. VENDOR WILL MANUFACTURE (QTY. 1) PART TO MATCH PRINT 75-1534 REV L AND ADHERE TO ALL DRAWING NOTES.
- $354KFABRICATION - COMPLEX - ALL MATERIAL, LABOR, AND RETURN SHIPPING WILL BE SUPPLIED THE VENDOR. VENDOR WILL MANUFACTURE: (QTY. 120) PARTS TO MATCH SHEET 1 ""DISK 1"" - MATERIAL: C10100 OFHC COPPER ALLOY AND ADHERE TO ALL DRAWING NOTES. VENDOR SHALL FURNISH CERTIFICATION OF CONFORMANCE FOR ALL MATERIALS. VENDOR SHALL FURNISH AEDC WITH WRITTEN CERTIFICATION THAT FABRICATED PARTS HAVE BEEN DIMENSIONALLY INSPECTED AND MEET ALL THE DIMENSIONAL AND OTHER SPECIFICATIONS OF THE RESPECTIVE DRAWINGS.
- $81K"FABRICATE, BACK-UP RING PER DRAWINGS 04-1037-1, **QUALITY NOTE 8, 19, 29 APPLIES**"
- $124KPRECISION METAL MACHINING
- $712KCOMPLEX METAL FABRICATION
- $36KPART FABRICATION