FedOps logoFedOps
Back to contract actions
PIIDFA910124CB002DEFINITIVE CONTRACT

BEYOND NEW HORIZONS, LLC

UEI: KNZUXDQ8C9S4
$898,161,038.39
Awarding Agency
Sub-Agency
Department of the Air Force
Start Date
April 1, 2024
End Date
September 30, 2026
NAICS
PSC
R425

Description

TEST OPERATIONS AND SUSTAINMENT (TOS) II

Transactions (43)
DateMod #Obligation
Mar 14, 20240+$5,000,001
Jul 12, 2024P00001+$0
Aug 19, 2024P00002+$1,095,227
Aug 29, 2024P00003+$11,000,000
Oct 1, 2024P00004+$91,771,421
Nov 1, 2024P00005+$773,000
Nov 7, 2024P00006+$0
Nov 13, 2024P00007+$49,373,269
Dec 20, 2024P00009+$77,076,128
Dec 20, 2024P00008+$0
Feb 14, 2025P00010+$70,416,533
Mar 13, 2025P00011+$58,451,937
May 5, 2025P00012+$18,843,466
May 19, 2025P00013+$5,172,441
Jun 13, 2025P00014+$70,096,895
Jun 25, 2025P00015+$0
Jul 1, 2025P00016+$1,826,529
Aug 8, 2025P00017+$15,990,381
Aug 21, 2025P00018+$238,477
Sep 11, 2025P00019+$3,154,566
Sep 23, 2025P00020+$3,456,019
Sep 25, 2025P00021-$2,244,068
Sep 26, 2025P00022+$0
Sep 30, 2025P00023+$31,749,007
Oct 16, 2025P00024+$15,084,687
Oct 17, 2025P00025+$1,642,280
Oct 17, 2025P00026+$1,906,389
Oct 31, 2025P00027+$6,000,000
Nov 7, 2025P00029+$95,290,788
Nov 7, 2025P00028+$110,010
Nov 20, 2025P00030+$5,061,205
Dec 15, 2025P00031+$49,010,960
Dec 30, 2025P00032+$11,873,252
Jan 20, 2026P00033+$58,034,308
Jan 27, 2026P00034-$12,055,188
Mar 4, 2026P00035+$0
Mar 17, 2026P00036+$7,000,000
Mar 24, 2026P00037+$0
Mar 31, 2026P00038+$152,984,801
Apr 16, 2026P00039+$0
May 15, 2026P00040+$5,023,120
May 19, 2026P00041-$19,995,026
Jun 26, 2026P00042+$7,948,225
Subcontractors 488$111,872,397 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete · latest 100 shown

SubcontractorAmount
UEI LN9YKAX66918
Pressure transmitter semiconductors
$46,361
UEI CKA4YFTEHBM5
Fabrication liner plates
$138,000
UEI EJJMMJHYDFH6
Procyon servers
$194,521
UEI C9C6HPQLL4A8
New generator with labor and setup
$218,545
UEI R5E8MKQN3BY3
Onsite trailer lease
$59,740
UEI Q9L5KC828LD5
Provide all materials, labor, equipment, and transportation necessary to upgrade/modify the hvac controls from inet dcu to ecostruxure ebo in building 251 at aedc.
$64,465
UEI LR14GGZ9KUT7
Rental of modular trailer
$77,316
UEI E9JJULZF55Z3
"service - diversion door refurbishment
$142,606
UEI G8R4UCTLEH88
Fabrication of three steel tanks
$85,850
UEI E8M1KY34E2L8
Stone, surge rock, 22 tons per truck.
$94,500
UEI F1UZPBD1VBH9
Half-length, multifunction i/o board
$101,207
UEI Z6UNGDH1UHP3
Control, motion project h2 mps modernization v3c
$59,368
UEI X9JQGNMSUKJ3
Service - provide all material, labor, equipment and transportation necessary to provide hydrovac excavation in support of new construction site to include at a minimum potholing, daylighting and/or soft digging. period of performance: 12/16/24 - 9/30/2025 pricing: -daily rate (10 hours) = $3,050.00 -hourly rate = $250.00 -fuel recovers = 7.8% contractor shall deliver prior to commencing the work or entering the jobsite(s), certificates of insurance, in the form supplied with this request for proposal or if none is supplied a form acceptable to subcontractor, attesting to the fact that the policies of insurance required by the subcontract documents have been obtained. vendor shall comply with: tn sca rates - tn4655 - franklin, coffee & grundy co. rev 23 (see attached to req 001928 / po 1000623) vendor shall comply with site supplement (see attached to req 001928 / po 1000623) work shall begin at 6:30 am at jobsite directed to. period of performance is 11 nov 2024 to 30 sept 2025"""
$869,700
UEI MM52K62ABX79
2" steel plate
$42,341
UEI NJLDZNG2XJM5
4" orifice hub
$162,060
UEI TCKJN6J6L278
Study on cmms replacement program
$350,000
UEI NKDZFGLWNQA9
Angle iron
$43,962
UEI SFFCPDAHXW27
Solidigm enterprise d7-p5520. ssd
$42,890
UEI LBVWR9LTX7S3
Procyon system rackmount server
$398,774
UEI WJXLH4H9W6X6
On-site service - vendor to fabricate and construct tank, atmospheric, awwa d100 (welded) or awwa d103 (bolted), demineralized water storage, stainless steel, atmospheric design pressure, -20f to120f design temperature, maximum 22'-0"" diameter, accordance with engineering specification 15871-hu6-3ps-dw-00004. once fabrication and construction is complete, vendor shall supply awwa code calculation, certified inspection reports, hydrostatic pressure test plan and report.
$378,526
UEI RGMZRWJ6LAP4
Reconfigure and install new ids points/hardware for test facility
$83,689
UEI JSHXHZV18F75
Manifold metal fabrication
$50,000
UEI LYLADHVZCYB3
Digital video recorder
$88,545
UEI VHDDJV465XG5
Ac servo drive module
$46,770
UEI LYLADHVZCYB3
Digital video recorder
$128,119
UEI Z9XWST44V561
Netapp fas50 server
$249,994
UEI GZR7DHDNYJA2
Actuated ball valve motor
$1,359,771
UEI Y2SHYGR1MNP6
Service, mk. i balance r&r and check loading
$62,025
UEI UTTAM1FVA3M5
Rental of 4 yard concrete bucket
$54,150
UEI DJACUETFQUL8
Netapp aff-c30 1pb system
$1,497,997
UEI NB8URE8KMFR1
Come onsite and service two large electric motors
$84,534
UEI C8VFSNKTMQB6
Cisco 50cm type 1 stacking cable. p/n -stack-t1-50cm
$189,151
UEI MDRBHTR1S748
Coupling
$619,586
UEI EHHTAJH4JGL7
Consulting services
$620,000
UEI RKQJD5SKPJM6
Valve
$53,110
UEI F1UZPBD1VBH9
Matlab license
$49,745
UEI QSDPB2TLZC15
Pipe
$250,882
UEI YUTUFRE9NLG2
Services of a qualified fire protection engineer
$45,000
UEI ZNFJF1TZEMG4
Service - enfuse software engineering/development support for ctdss platform. finish work on pl2 platform. support pl3 software development to achieve a functioning platform.
$87,222
UEI GL4ZD2F69YB2
Hub, nps 6", hub size 6 gr52, sch xxs, butt weld, astm sa182 f316/f316l, mfr grayloc p/n 52877d
$109,195
UEI VMXLBYT1U743
Clamp, 16", with bolt set, sa193-b7 studs & sa194-gr2h nuts, zinc nickel nano-structured coated per astm b841 class 2 type an grade 10/astm f1941
$219,156
UEI GL4ZD2F69YB2
Flange, 54-inch, 150# rfwn flange, 0.5 inch wall thickness, asme b16.47 series a, astm a105n
$108,602
UEI MDC5LDZKQAM4
Red hat technical account management services for red hat openshift container platform, 1 yr
$275,462
UEI S76NQ7Z3M8Q1
Fan drive monitoring support
$60,274
UEI G15SK46B3QB3
Fabrication of balance adaptor, custom wind tunnel model support
$43,388
UEI E7BFLKHS8VG3
Enclosure, 96" x 20" x 66", nema 3r enclosure constructed of formed code 12 gauge steel with a finish coat of ansi #61light gray paint. 1. copper bus bar to be silver plated
$66,056
UEI UXJGUJJDCMJ4
Plate .375" x 120" x 120" a516 gr 70.
$42,157
UEI JCM3RFC4YQQ3
"milestone payment 3 of 25% - due at shipment. (net 10). service - the contractor shall provide all materials, labor, transportation to pick up, ship, receive, rewind, test, and warranty the 14,000 hp allis-chalmers stator, serial number 156898. the motor stator will return to aedc in a like-new or better condition that meets or exceeds all the original design and performance specifications. the seller shall perform electrical test on the stator when they receive the motor and after work is complete. the final motor test that will be performed after work is complete and before return shipment to aedc, may be witnessed by the buyer.
$594,068
UEI JJN5WYJ26VT4
Sensor, mk18 cyro-quartz crystal microbalance low temp (cqcm-lt), temperature range = 5k to 400k, 15 mhz crystal 96-1459-02-01
$67,100
UEI WLFJZG1HX689
Providing a standardized roofing asset management and maintenance program
$150,000
UEI UTTAM1FVA3M5
Rental - ditch witch vacuum hx30
$46,200
UEI JPEXPU4HWAM9
Service to try and improve the reliability/robust operation of the c3/c4 telemetry used for monitoring blades within the compressors. currently, the system is seeing several issues concerning the loss of data during a test period and well as maintenance issues with the interconnect.
$65,801
UEI FLYKR3CDM937
Bosch rexroth - linear roller bearing - r987144863
$47,624
UEI C8VFSNKTMQB6
Cisco 50cm type 1 stacking cable. p/n - stack-t1a-50cm
$181,716
UEI CP1LPEUC1YH5
System, microphone and preamplifier, includes 377c10 1/4" prepolarized condenser microphone, pressure, 1.6 mv/pa, 4 to 70k hz (+/- 2 db), and 426b03 preamplifier - 1/4", microphone, icp, 3.2 hz to 126,000 hz frequency response (+/- 0.2 db), output impedance less than 50 ohm, +/-8v maximum output voltage, 2 to 20 ma constant current excitation, -40 to +158 degrees f operating temperature, 10-32 output connector, pcb p/n 378c10.
$41,168
UEI Q5UNXRK4F5Z6
Service, concrete foundation, vapor barrier 6 mil under slab, wire mesh throughout, #4 rebar on 4' center, pouring and finishing 46'x78' pad, two hvac pads, exterior 10' wide x 6' long apron at 10' rollup door, exterior 18' wide x 10' long apron at 18' rollup door, and two 4'x4' pads outside both personnel doors, sawed and sealed, rated for 4000 psi, 6" thick. work must begin 6/1/26.
$73,900
UEI SFFCPDAHXW27
External ssd. fips140-3 level 3 security compliant self encription. datalocker dl4 fe. 7.6tb. supplier is supplying material to fulfill an order for a standard/typical cots product. no drawings, specifications, or government network access will be provided.
$81,537
UEI M5NUCAHL7X46
Pipe spool material, fabrication, examination, testing, storage and / or delivery shall be in accordance with duct drawing package (15871-hu6-md-exh-00002_000), duct statement of work (15871-hu6-3sw-exh-00001_000), ,exhaust duct specification (15871-hu6-3ps-exh-00004_000), and duct welding specification (15871-hu6-3ps-exh-00009_000). duct installation to be performed by others.
$1,350,095
UEI X7LUT2X36JC1
Funding for po# 102744
$421,308
UEI N9S1VDTVLJM1
Interface module, 1 channel, mil-std-1553, mfg national instruments, p/n 784796-01
$177,225
UEI E7BFLKHS8VG3
Hpa power distribution hardware, panelboards, transformer, switch, ss pad mounted supports, sunshade, nema 3r support structures for sunshades, tb1 enclosure assembly, control board 1 assembly, mov panelboard 2 assembly, control board 2 assembly, in accordance with power distribution_r5 conceptual drawings
$200,823
UEI J49CN39QTNW3
Analyzer, gas; multigas (ftir spectrometer) multigas 2030 with mg2000 software suite, 0.25mm ln2 mct (16 um 12 hr), 5.11m ni-al gas cell, gold coated mirrors, kalrez o-rings, ar coated znse windows, 1/4" swagelok inlet/outlet lines, 1000 torr pressure transducer, integrated heaters. (mks p/n 2030dbg2ezks13t)
$348,640
UEI U517SU1EZGK9
Valve: 24" bray series 36 butterfly double flange valve, di body, ndi disc, 416 stem, epdm sea
$241,991
UEI CAZLL2ESMKV6
Professional topographic data collection using lidar scanners, capture in state plane coordinates to ensure methodology and repeatability. utilize cable mounted system to survey internal well structure
$103,350
UEI E9JJULZF55Z3
Vendor will provide labor and materials necessary to install and commission the sanitary sewer lift station
$303,690
UEI VN2LPM1PYEL8
Valve, butterfly, motorized modulating operator, 36", working pressure pounds per square inch/gauge: 150 psig, valves: astm a536 grade 65-45-12 ductile iron and flat-faced flange drilling per asme b16.10, asme b16.47
$72,686
UEI FV58GN6ZNRK1
Metal fabrication - complex - provide all material & labor to fabricate (qty. 1) tube end per drawing 17-1027, rev. c. vendor to fabricate tube end from stainless steel, 17-4h x h1075 condition, per astm a-564.
$99,030
UEI WN8ZW5DLWKP7
Metal fabrication - complex - provide all material & labor to fabricate (qty. 6) ablator seat 25km per drawing 23-1055, rev. a. vendor to fabricate ablator seat 25km from ta-10w (astm b365). vendor is to adhere to all drawing notes. vendor shall furnish aedc with a 100%-dimensional inspection report and certification that fabricated parts meet all the dimensional and other specifications of the respective drawings.
$548,474
UEI Q85JVUSZY3G4
Service - rental - freightliner cascadia truck with two 48' trailers duration 8 months
$99,918
UEI FUJ4NX5DR549
This is a change order for existing po 1022972. platform hosting and licensing - seertech learning
$45,900
UEI PPUJJADXPLC8
Saw cut concrete
$99,000
UEI U517SU1EZGK9
Assembly, valve - 60-inch vsi bfvi awwa c504 butterfly valve. flanged cl125/150. ductile iron body, ductile iron disc with ss316 edge disc, stainless 17-4ph shaft, nbr seat, ss304 hardware - 20' f40 full length bonnet extension bonnet to be direct mounted to valve mounting pad with gearbox mounted to top of bonnet extension. includes: - bonnet extension coated cs - couplings ss - torque tube ss qty: 1
$203,465
UEI MP6FL3AJ9NE3
Tmde - flowmeter, 300 psi, >200? f, 2"" npt pipe size, iso 68 viscosity, 140? f running temp, al w/ nylon flow changer housing, ss 316 internal moving parts, buna n seal, 80 gpm max flow rate, 1.5"" npt process connection, 4-20 ma transmitter, pointer readout and switches, t box, two spdt (4 wire) switch, transmitter,left to right flow direction, nist traceable calibration certificate, mfr universal flow meters, p/n mn-aib80gm-12-302/40v.83-tx4xr-nist
$64,760
UEI NHCVWKCF5LM4
Service - rental renewal of 85k hydraulic excavator duration 6 months
$41,868
UEI NHCVWKCF5LM4
Rental - 84"" padfoot ride on roller hamm hc100ip, 10952710
$56,650
UEI E6NWE6RS9CQ5
Rental - truck dump 12-14 yd auto dsl, freightliner m2-106
$70,154
UEI NHCVWKCF5LM4
Rental of 30-ton dump truck
$142,500
UEI E6NWE6RS9CQ5
Rental - renewal of 96 - 105 hp wide track dozer duration 9 months (08/05/25-04/08/26)
$82,500
UEI PENUR1ZDT575
Annual maintenance contract for repair and service of all elevators on base. attached is a quote and the sow.
$57,150
UEI FV58GN6ZNRK1
Mdr hub, 3-bladed proprotor hub, electronic pitch control mfg:airmaster, p/n:ap735
$43,495
UEI KA2ATDJRCKN9
Annual service contract: contract for periodic fire system maintenance. the subcontractor shall provide all management, tools, supplies, equipment, and labor necessary to troubleshoot, repair, test and certify fire alarm systems at arnold afb, tennessee. fire alarm systems for this contract includes detection and alarm systems and mass notification systems. the location of systems will be identified when the subcontractor is called on for service. contractor shall provide subcontractor with on-site walk through of systems prior to subcontractor bid. period of performance is from 1/1/26 to 12/30/26.
$75,000
UEI W3E6QNJ8U9K8
Service -- replace exterior luminaries at the aedc main gate and inspection stations with new led lighting.
$49,738
UEI KN5HPHRHG4L5
Service - rental - hydrema #912ghm duration 6 months
$47,736
UEI K6EYVA6PJ7J5
Milestone a @ $59,387.50 after material to upgrade system has shipped
$118,775
UEI K998ELRAP519
Household moves - direct purchase service requested: relocation, household moves this po funds the base year for boa# bnh-022 with a pop from 5/18/26 - 9/30/26. this is a multi-year subcontract for 4.5 years that will be funded annually. all pricing on invoice will be in accordance with exhibit c of the blanket agreement.
$200,000
UEI WN8ZW5DLWKP7
Service, metal fabrication: provide all labor and material to fabricate td0162 from 7075 t6 al and add the holes/chamfers to the rod provided, following the directions in td0170. use the tolerances provided in the drawing tolerance block unless otherwise called out in the drawing. use td0171 as a reference drawing only, it depicts the assembly of five of the components. follow the notes included to engrave the drawing number on the exterior surfaces where annotated.
$43,509
UEI Q9L5KC828LD5
Service contract to replace old hvac 7716 inet control boards in buildings 676, 678, and 1103 in accordance with exhibit d of the subcontract.
$183,795
UEI MDC5LDZKQAM4
Eaton 9px g2 9px5kg2 5000va rack/tower ups eaton corporation part# 9px5kg2 cti part# 9px5kg2
$40,430
UEI GZR7DHDNYJA2
Valve, ball, motor actuated, 1"" nps, 900 class, rff per asme b16.5, gaseous nitrogen, 1300 psig design pressure, -30 to +200 f design temp, 304/316 ss body, in accordance with data sheet 15871-hu6-jvd-gn-00015, tags: gn-mv177-hu6, gn-mv186-hu6, gn-mv195-hu6, valpro pn a14-01-9-r-b-s5-10-d-09
$1,302,021
UEI UTTAM1FVA3M5
Rental - renewal of 18k diesel excavator with cab duration - 6 months (09/01/25-03/01/25)
$43,300
UEI NHCVWKCF5LM4
Rental - renewal of 25k forklift rev1 duration 6 months (09/30/25-03/18/26)
$49,185
UEI MDC5LDZKQAM4
Adpe, velocity micro promagix hd150i rackmount, mfr velocity micro, p/n vm-hd150i this order is placed under written authorization from the united states air force dated 22 october 2024, a copy of which is attached. in the event of any inconsistency between the terms and conditions of this order and those of your federal supply schedule contract, the latter will govern. 47qtca21a0006"
$53,546
UEI JMR4L9MJW7G3
Bar, round, 14.15" to 14.60" dia, hdpe polyethylene, random lengths, (marflex, finathene hl 428, or equivalent), w/a specific gravity of .942 to .960 or density of 59.43 to 59.93 lbs/sqft, melt index of 0.3 (melt flow = 0.3 g/10 min ), minimum tensile strength of 3300 psi, elongation of 600% @ max. load, strain rate of 2 in/min per astm d6-3b68 or dart drop of 0.221 lbs min per astm d 1709a. material needs to be straight within 0.25" from each end to the spec.
$56,214
UEI EV8TTNP8EGG1
Stone, crusher run, 22-ton truck load for the period 1/9/26 -9/30/26, on an as-needed, as-required basis defense department priority rating do-c9 certified for national defense use shall apply to this order under usaf prime contract no. fa9101-24-c-b002. you are required to follow all provisions of the defense priorities and allocations system (dpas) regulation (15 cfr 700)."
$262,783
UEI C8VFSNKTMQB6
Cisco stack power cable 35 cm. p/n - cab-spwr-35cm
$141,448
UEI N1EFAS6J6BT7
Services-off base - evaluate kinney roughing pump, model kt-850, serial number 85-0454_l5146-2 (oil type: hydrocarbon, pumping media: air and nitrogen) and refurbish unit with all necessary labor, upgrades, parts, kits, adjustments, tests, and evaluations to return pump to full operational readiness in accordance with manufacturer's standards with a 12-month minimum warranty against defective parts and/or workmanship.
$65,210
UEI NJP8ZFMGUGL1
Seal, internal pressure e-seal, maximum external diameter 1.678 , 3/64 free height, 0.005 material thickness, 718 inconel, no heat treatment, strain hardened, 0.0010 -0.0015 silver plating, jet seal p/n jei01678-01-01-00-ssb
$41,250
UEI NKDZFGLWNQA9
Plate, 1/2""x96""x120"", ss t304, hot rolled astm-a240
$63,750
UEI ZNFJF1TZEMG4
Enfuse software engineering/development support for phase 4-ngde-s pl3 data storage platform. this po is issued in accordance with boa# bnh-016"
$975,000
UEI NHCVWKCF5LM4
Rental - 8x14 durabase mats
$47,716